You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Abductive Electronics Prognostic Tool (ADEPT)

    SBC: ABTECH CORPORATION            Topic: N/A

    AbTech Corporation proposes to apply its unique Statistical Network ModelingTM technology to develop a non contact prognostic assessment tool that 1) acquires, processes, and analyzes electronic radiated signal data, 2) learns the expected characteristics and patterns of specific radiated signals measured from microelectronic semiconductor devices using AbTech's statistical network modeling techno ...

    SBIR Phase I 1997 Department of DefenseAir Force
  2. ABDUCTIVE NETWORKS FOR COMPLEX AERONAUTICAL SYSTEMS DEVELOPMENT

    SBC: ABTECH CORPORATION            Topic: N/A

    INNOVATIVE ARTIFICIAL INTELLIGENCE TECHNIQUES HAVE THE POTENTIAL TO SOLVE MANY COMPLEX AIR FORCE PROBLEMS. ADVANCES IN COMPUTING SPEED AND EXISTING SOFTWARE TECHNOLOGY ALONE ARE UNLIKELY TO RESULT IN REAL-TIME AERONAUTICAL SYSTEMS CAPABLE OF MEETING THE COMPLEX REQUIREMENTS OF THE AIR FORCE MISSION. RATHER, AN ALTERNATIVE METHODOLOGY SUCH AS ABDUCTIVE TECHNOLOGY, A NEW TECHNOLOGY PRESENTED IN THIS ...

    SBIR Phase I 1990 Department of DefenseAir Force
  3. ABDUCTIVE NETWORKS FOR SPACE SURVEILLANCE AND CLASSIFICATION

    SBC: ABTECH CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseAir Force
  4. ACCELERATED CORROSION TESTING CHAMBER FOR WHEELED VEHICLES

    SBC: MATERIALS MODIFICATIONS INC            Topic: N/A

    IN THIS PHASE I EFFORT, THE GOAL IS TO DETERMINE THE FEASIBILITY OF CONDUCTING ACCELERATED CORROSION TESTING OF VEHICLES BY SIMULATING 5-10-15 YEARS OF FIELD LIFE IN A COMPUTER CONTROLLED ENVIRONMENT SIMULATION CHAMBER. THE DIFFERENT REQUIREMENTS OF THE CHAMBER, THE TYPES OF ENVIRONMENTS PRESENT IN THE DIFFERENT GEOGRAPHICAL REGIONS, THE CORRELATION BETWEEN ACCELERATED CHAMBER TESTS AND FIELD COND ...

    SBIR Phase I 1990 Department of DefenseArmy
  5. Acoustic Pressure Gradient Imager For Divers

    SBC: EMPIRICAL TECHNOLOGIES CORPORATION            Topic: N/A

    The contractor has patented technology for a unique process that directly converts a two-dimensional acoustic disturbance, such as a wave front, into an intensity-mapped visible image in real-time without electronic circuitry; that is, it is a direct pressure gradient imager. The imager relies on the piezo-dichroic properties of a continuous layer of a dichroic material thin film that serves as bo ...

    SBIR Phase I 1994 Department of DefenseSpecial Operations Command
  6. ACOUSTIC PROPAGATION PATH DETERMINATION

    SBC: PLANNING SYSTEMS, INC.            Topic: N/A

    THIS PROPOSAL PRESENTS AN INNOVATIVE APPROACH TO DETERMINING THE PROPAGATION PATH OF ACOUSTIC DATA RECEIVED BY A THIN LINE TOWED ARRAY. WE MAKE USE OF THE LATEST DEVELOPMENTS IN SEAFLOOR ACOUSTIC MODELING CAPABILITY AS WELL AS EMPLOYING THE EMERGING AND POWERFUL TECHNIQUES ASSOCIATED WITH ARTIFICAL NEURAL NETWORKS. THE PROPOSED NEURAL NETWORKS WILL BE DESIGNED TO IDENTIFY THE PATH OF PROPAGATION F ...

    SBIR Phase I 1990 Department of DefenseNavy
  7. Acoustic Towed Array Position Measurement System for Nuclear Submarines

    SBC: DDL Omni Engineering, LLC            Topic: N/A

    DDL OMNI Engineering proposes to design a secure system for the continuous, real time acoustic measurement of towed array position relative to the host submarine. By using focused transmit and receive assemblies, pseudo- random spread broadband signals, and relatively high carrier frequency, the transmission level will be minimized so as to be virtually undetectable by a non-dedicated system ...

    SBIR Phase I 1997 Department of DefenseNavy
  8. Active Noise Reduction Headphones for In-Situ Audiometry Testing

    SBC: Adaptive Technologies, Inc.            Topic: N/A

    Active noise reduction (ANR) headsets have found a market niche in the hearing protection industry, thereby validating the technology of active noise control for personal applications. This Phase I project will seek to extend the application of personal ANR systems to include specialized headphones which can successfully evaluate hearing acuity in typical clinical environments. To ensure a succe ...

    SBIR Phase I 1997 Department of DefenseAir Force
  9. Active Suppression of Thruster Induced Seeker Jitter Using Electro-

    SBC: PROPULSION RESEARCH, INC.            Topic: N/A

    SEEKER STABILIZATION VIBRATION SUPPRESSION ELECTRO-ACTIVE MATERIALS PROPULSION RESEARCH WILL USE ITS MINIATURE "FERRO-MAGNETIC" ACTUATOR EFFORTD CAN BE USED TO CREATE A "SEEKER ANTI-MOTION SYSTEM". THIS TECHNOLOGY TAKES AN AGGRESSIVE APPROACH TOWARD "INTELLIGENTLY" MANAGING THE SEEKER DYNAMIC RESPONSE TO INDUCED MOTION BY ISOLATING IT "DYNAMICALLY" FROM THE REAMINDER OF THE AIRFRAME USING ELECTRO- ...

    SBIR Phase I 1994 Department of DefenseMissile Defense Agency
  10. ACTIVE SURVEILLANCE SYSTEM SIGNAL PROCESSING FOR DENSE MULTIPATH NEAR LAND WARFARE

    SBC: DIGITAL SYSTEM RESOURCES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseNavy
US Flag An Official Website of the United States Government