You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY21 is not expected to be complete until September, 2022.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. Fire Control Battle Management and Decision Support System Technology

    SBC: Advanced Systems Technology, Inc.            Topic: N/A

    Future battlefields will require independent operations and increased operational tempo, placing severe burdens on weapons platform crewmembers in the areas of information flow management, data fusion, and assessment of data to arrive at the most tactically acceptable decisions. Work continues in the development of decision aids to assist direct/indirect fire weapon platform commanders in accompl ...

    SBIR Phase I 1995 Department of DefenseArmy
  2. Non-Eroding Fin Materials

    SBC: Applied Research Associates, Inc.            Topic: N/A

    This project will analyze and select promising materials and designs to be used in the plumes of tactical solid rocket motors for missile steering and control. The emphasis is on high-performance refractory materials and compatibility of material systems. The control fins experience severe thermal and severe particulate erosion environments. Missile controllability requires fins with minimal er ...

    SBIR Phase I 1996 Department of DefenseArmy
  3. MAXIMIZING DATA ACQUISITION AND PROCESSING SYSTEM CAPABILITIES

    SBC: Calculex Inc            Topic: N/A

    A VARIETY OF HARDWRE ENHANCEMENTS HAVE BEEN MADE OVER THE YEARS TO THE HIGH ENERGY LASER DATA ACQUISITION AND PROCESSING SYSTEM (HELDAPS) AT THE WHITE SANDS MISSILE RANGE HIGH ENERGY LASER SYSTEM TEST FACILITY. THE EXISTING HELDAPS SOFTWARE DOES NOT FULLY UTILIZE THE CAPABILITIES OF THE ENHANCED SYSTEM CONFIGURATION. A PHASE I PROJECT IS PROPOSED TO SYSTEMATICALLY ANALYZE THE HELDAPS ROCESSING REQ ...

    SBIR Phase I 1988 Department of DefenseArmy
  4. Reactor for Control of Fugitive Emissions of Toxic Gases

    SBC: Coyote Aerospace/high Mesa            Topic: N/A

    A need to control the fugitive emissions of hazardous vapors, volatile organic compounds (VOCs) and hazardous air pollutants (HAPs) has been identified in operations at Army plants and depots. The High Mesa Technologies (HMT)/Coyote Aerospace team proposes to meet this need using proven silent discharge plasma (SDP) techniques, developed by the Electric Power Research Institute and Los Alamos Nat ...

    SBIR Phase I 1997 Department of DefenseArmy
  5. Numerical Simulation of Dynamic Stall

    SBC: Ecodynamics Research Associate            Topic: N/A

    The objective of the proposed program is to develop, demonstrate and validate a three-dimensional, time-dependent, compressible Navier-Stokes program for predicting dynamic stall. The foundation of the program is an existing 3-D program that has been developed under prior SBIR funding for retreating-blade dynamic stall on modern high-performance helicopter rotors. The program will be improved in ...

    SBIR Phase I 1996 Department of DefenseArmy
  6. DEVELOPMENT OF APPROXIMATIONS FOR A FAST-METHOD OF MOMENTS TECHNIQUE BASED ON NORMAL MODES

    SBC: Electro Magnetic            Topic: N/A

    A FAST NEW APPROXIMATION FOR THE METHOD OF MOMENTS SOLUTION OF ELECTROMAGNETIC RESPONSE PROBLEMS IS PROPOSED. THE NEW APPROACH IS BASED ON SEPARATION OF THE PROBLEM INTO A GLOBAL RESPONSE SET DEPENDENT ON NORMAL MODES, AND A LOCAL RESPONSE DEPENDENT ON GEOMETRICAL OPTICS. THE EFFORTS OF NEGLECTING THE LOCAL RESPONSE TERM ALONG WITH OTHER APPROXIMATIONS WILL BE INVESTIGATED TO QUALITFY THE RESULTIN ...

    SBIR Phase II 1988 Department of DefenseArmy
  7. SELF-DEVELOPMENT X-RAY FILM

    SBC: Energy Optics, Inc.            Topic: N/A

    THIS PROGRAM IS ORGANIZED TO DEMONSTRATE THE FEASIBILITY OF A NONSILVER X-RAY PROCESS TO ELIMINATE THE NEED FOR SPECIAL CHEMICALS AND A DAYLIGHT DEVELOPING MACHINE FOR ARMY FIELD DENTAL APPLICATION. THIS PROCESS WILL BE COMPATIBLE WITH CURRENT X-RAY EQUIPMENT. THE IMPORTANT OBJECTIVES OF PHASE I ARE TO INVESTIGATE AND DEMONSTRATE THAT AN X-RAY PICTURE USING EXISTING X-RAY EQUIPMENT, NO CHEMICALS P ...

    SBIR Phase II 1988 Department of DefenseArmy
  8. Development of a Performance Assessment Process Controller

    SBC: Innovative Tech. Solutions            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  9. Image Processing Using Temporal Cellular Neural Networks

    SBC: Intelligent Reasoning Systems (IRS)            Topic: N/A

    This proposal addresses the development of a compact, high-speed camera system that integrates a Charge-Coupled Device (CCD) solid-state imager and a Temporal Cellular Neural Network (TCNN) (using three-dimensional TC technology) to provide real-time image processing capability for scientific and engineering applications. The integrated CCD/TCNN camera provides high-speed image collection and proc ...

    SBIR Phase II 1996 Department of DefenseArmy
  10. Image Processing Using Temporal Cellular Neural Networks

    SBC: Intelligent Reasoning Systems (IRS)            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of DefenseArmy
US Flag An Official Website of the United States Government