You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
READ/WRITE/ERASE OPTICAL MATERIALS
SBC: Astrotech Inc Topic: N/AWE PROPOSE TO INVESTIGATE INTO THE PRODUCTION OF HIGH PERFORMANCE REVERSIBLE OPTICAL DISK, USING THIN FILMS OF AN ALLOY OF NEODYMIUM, DYSPROSIUM AND IRON AS THE RECORDING MATERIALS. THE REVERSIBLE OPTICAL DISKS WOULD HAVE A C/N RATIO OF 55 DB AT 2 MHZ., A CYCLE LIFETIME OF MORE THAN A MILLION, AND A RETENTION TIME OF 10 TO 20 YEARS.
SBIR Phase I 1988 Department of DefenseAir Force -
ARMAMENT RESEARCH ANALYSIS
SBC: Amparo Corp.on Topic: N/AN/A
SBIR Phase I 1988 Department of DefenseAir Force -
DEVELOPMENT OF AN EXPERIMENTALLY VERIFIED PROCESS FLOW DIAGRAM FOR THE PRODUCTION OF LIQUID NITROGEN TETROXIDE
SBC: University Technologists Inc. Topic: N/AN/A
SBIR Phase I 1988 Department of DefenseAir Force -
ENHANCED STANDARDIZATION OF MATE SOFTWARE
SBC: Ais Systems Inc Topic: N/ATHE MATE PROGRAM WAS DESIGNED TO PROVIDE HARDWARE AND SOFTWARE STANDARDS TO THE ATE INDUSTRY. IN PARTICULAR, MATE SOFTWARE WAS INTENDED TO USE A STANDARDIZED TEST LANGUAGE - ATLAS - ON A STANDARDIZED TEST EXECUTIVE, THE MTE, ALL RUNNING ON A STANDARD OPERATING SYSTEM, THE MOS. THE MOS WAS DESIGNED TO BE EASILY REHOSTABLE AND HAS, IN FACT, BEEN REHOSTED TO SEVERAL HARDWARE CONFIGURATIONS. HOWEVER, ...
SBIR Phase I 1988 Department of DefenseAir Force -
60 GHZ IMPATT DIODES
SBC: Lnr Communications Inc. Topic: N/AGALLIUM ARSENIDE (GAAS) IMPATT DIODES ARE THE PRIMARY CANDIDATES FOR USE AS THE ACTIVE ELEMENT IN 60 GHZ SOLID STATE COMBINATORIAL (OR ACTIVE APERTURE) TRANSMIT POWER AMPLIFIERS FOR LONG RANGE WIDEBAND INTERSATELLITE COMMUNICATION LINKS. IN THIS APPLICATION A MULTIPLICITY OF IDENTICAL 60 GHZ IMPATT DIODES (AND "BUILDING BLOCK" AMPLIFIER STAGES) ARE REQUIRED, EACH OF MAXIMUM ACHIEVABLE EHF OUTPUT P ...
SBIR Phase I 1988 Department of DefenseAir Force -
COOLING TOWER ICE DETECTION SYSTEM
SBC: Electronic Development Assocs Topic: N/AELECTRONIC DEVELOPMENT ASSOCIATES, INC., EDA, ESTABLISHED IN 1982, WITH 25 YEARS OF PRODUCT DEVELOPMENT EXPERIENCE, NOTEWORTHY CONSULTANTS AND A FULLY EQUIPPED FACILITY, HAS FORMULATED A UNIQUE APPROACH FOR A RELIABLE COOLING TOWER ICE DETECTION SYSTEM. THE EDA APPROACH SHALL UTILIZE A VERY SIMPLE YET INNOVATIVE AND RELIABLE METHOD OF ICE DETECTION TAILORED FOR DETERMINING THE PRESENCE OF ICE FORM ...
SBIR Phase I 1988 Department of DefenseAir Force -
NEW CONCEPTS AND INNOVATIONS FOR LOGISTICS SUPPORT (LOGISTICS SUPPORT PLANNING FOR HYPERSONIC VEHICLES)
SBC: SCIENCE & ENGINEERING ASSOC., INC. Topic: N/AN/A
SBIR Phase I 1988 Department of DefenseAir Force -
A REAL TIME ICE DETECTION SYSTEM FOR STRUCTURES
SBC: Monat Assocs Topic: N/AICE ACCUMULATION ON STRUCTURES HAS LONG BEEN RECOGNIZED AS A SIGNIFICANT AND COSTLY PROBLEM FOR BOTH INDUSTRY AND FOR GOVERNMENT. AT PRESENT NO SYSTEM HAS BEEN DEVELOPED WHICH POSITIVELY DETECTS ICE PER SE, AND NOT MERELY POTENTIAL ICING CONDITIONS. OUR PROPOSAL IS TO DEVELOP A DETECTION SYSTEM WHICH WILL DEFINITIVELY REPORT THE PRESENCE OF ICE, AND WILL AUTOMATICALLY ACTIVATE A DEICING SYSTEM. WH ...
SBIR Phase I 1988 Department of DefenseAir Force -
NEW AND INNOVATIVE CONCEPTS FOR AERONAUTICAL SYSTEMS (MEASURES OF EFFECTIVENESS FOR AIRBORNE STRATEGIC RELOCATABLE TARGETS)
SBC: SCIENCE & ENGINEERING ASSOC., INC. Topic: N/ATHE PERFORMANCE OF ANY "INNOVATIVE SENSORS" FOR SRT APPLICATIONS MUST BE QUANTIFIED AND COMPARED WITH EACH OTHER AND WITH CURRENT STATE-OF-THE-ART SENSORS. THEY MUST ALSO BE PLACED IN CONTEXT WITH THE BENEFITS/COSTS OF IMPROVED SRT PERFORMANCE DUE TO AREA LIMITATION TECHNIQUES, OPTIMIZED SEARCH/ROUTE PLANNING, ALTITUDE/VISIBILITY/SURVIVABILITY CONSTRAINTS, ETC. THIS PROPOSED PHASE I SBIR WOULD DEV ...
SBIR Phase I 1988 Department of DefenseAir Force -
Development of a Performance Assessment Process Controller
SBC: Innovative Tech. Solutions Topic: N/AN/A
SBIR Phase I 1995 Nuclear Regulatory Commission