You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY21 is not expected to be complete until September, 2022.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
-
OPERATOR-BASED METRIC FOR NUCLEAR OPERATIONS AUTOMATION ASSESSMENT
SBC: Charles River Analytics, Inc. Topic: N/ATHE OBJECTIVE OF THE PHASE I EFFORT IS TO DEVELOP, IMPLEMENT, AND EVALUATE AN OPERATOR-BASED METRIC FOR ASSESSING FUTURE CONTROL ROOM AUTOMATION SYSTEMS FOR COMMERCIAL NUCLEAR PLANT OPERATIONS. THE FOCUS WILL BE ON AUTOMATION'S IMPACT ON OPERATOR UNDERLOAD AND SITUATION AWARENESS (SA). THE APPROACH COMBINES AN OPERATOR/SYSTEM BEHAVIORAL REPRESENTATION IMPLEMENTEDIN SOFTWARE, WITH A PROCEDURAL METH ...
SBIR Phase I 1993 Nuclear Regulatory Commission -
Self-Monitoring Surveillance System for Prestressing Tendons
SBC: Construction Technology Topic: N/AN/A
SBIR Phase I 1995 Nuclear Regulatory Commission -
Development of a Performance Assessment Process Controller
SBC: Innovative Tech. Solutions Topic: N/AN/A
SBIR Phase I 1995 Nuclear Regulatory Commission -
Inservice Diagnostics of Motor Operated Valves
SBC: ACENTECH INCORPORATED Topic: N/AN/A
SBIR Phase I 1995 Nuclear Regulatory Commission -
Advanced Digital Man-Machine Interface Analysis
SBC: Ryan Nuclear, Inc. Topic: N/AN/A
SBIR Phase I 1995 Nuclear Regulatory Commission -
A Detection System for Determining the Concentration, Size, and Depth of Buried Radioactive Material
SBC: Shonka Research Associates Topic: N/AN/A
SBIR Phase I 1995 Nuclear Regulatory Commission -
SPECIAL MONITOR DETECTOR DEVELOPMENT FOR RESPIRATOR CONTAMINATION
SBC: Shonka Research Associates Topic: N/AN/A
SBIR Phase I 1993 Nuclear Regulatory Commission