You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Wireless Sensor Network for Flight Test

    SBC: INVOCON, INC.            Topic: A201

    Flight test programs have always been challenged with having to add a sufficient number of transducers and instruments to make meaningful measurements without having an adverse impact on the operation and performance of the vehicle being tested. Transducer and instrumentation wiring is intrusive and labor intensive, often requires vehicle modifications to support, is subject to reliability concern ...

    SBIR Phase I 2015 National Aeronautics and Space Administration
  2. WIDE SPECTRUM HIGH PERFORMANCE SENSOR CALIBRATORS

    SBC: SI Diamond Technology Inc            Topic: N/A

    N/A

    SBIR Phase I 1996 National Aeronautics and Space Administration
  3. WELDING TECHNOLOGY

    SBC: Mid-south Engineering, Inc.            Topic: N/A

    THIS PROJECT IS DEVELOPING METHODS TO USE ARTIFICIAL NEURAL NETWORKS FOR MODELING AND CONTROL OF ARC-WELDING PROCESSES. ARTIFICIAL NEURAL NETWORKS WILL BE COMPARED WITH MORE TRADITIONAL MODELS, SUCH AS THOSE DERIVED FROM THE PHYSICS OF HEAT CONDUCTION, AND TECHNIQUES FOR COMBINING THE USE OF BOTH IN MODELING AND CONTROL WILL BE EXPLORED. ARTIFICIAL NEURAL NETWORKS ARE ADVANTAGEOUS IN THAT ESSENTIA ...

    SBIR Phase I 1991 National Aeronautics and Space Administration
  4. Virtual Environment System For Space Operations

    SBC: LINCOM CORP.            Topic: N/A

    N/A

    SBIR Phase I 1997 National Aeronautics and Space Administration
  5. VERY LARGE SCALE INTEGRATION TIME INTERVAL UNITS

    SBC: Schmidt Instruments Inc.            Topic: N/A

    CONSTRUCTION OF CUSTOM VERY LARGE SCALE INTEGRATION (VLSI) CIRCUITS COMBINING ANALOG AND DIGITAL SECTIONS FOR A PRE-AMPLIFIER, DISCRIMINATOR, ENABLE GATE, AND TIME-TO-DIGITAL CONVERTER (TDC) TO FORM A FULLY MONOLITHIC TIME INTERVAL UNIT (TIU) IS THE PROPOSED INNOVATION. THIS TIU WILL DRAMATICALLY REDUCE THE SIZE, WEIGHT, AND POWER CONSUMPTION OF NASA SPACE-BASED LASER ALTIMETERS. ADDITIONAL ADVANT ...

    SBIR Phase I 1990 National Aeronautics and Space Administration
  6. USING PRESSED AND SINTERED BI-SB TO IMPROVE THERMOELECTRIC COOLERS BELOW 200K

    SBC: Marlow Industries, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 National Aeronautics and Space Administration
  7. UNIVERSAL HELIUM MAGNETOMETER FOR SPACE

    SBC: POLATOMIC, INC.            Topic: N/A

    N/A

    SBIR Phase I 1991 National Aeronautics and Space Administration
  8. Universal Fiber Optic Test/Instrumentation System (Ufo-Tis)

    SBC: Systems & Processes Engineering Corporation            Topic: N/A

    N/A

    SBIR Phase I 1997 National Aeronautics and Space Administration
  9. Ultralight Inflatable Fresnel Lens Solar Concentrators For Space Power

    SBC: ENTECH, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1997 National Aeronautics and Space Administration
  10. Type II SLS Materials Development for Space-based FPA Applications

    SBC: INTELLIEPI IR, INC            Topic: S103

    This Phase I SBIR proposes to further develop high performance (low dark current, high quantum efficiency, and low NEdT) infrared epitaxy materials based on Type II Strained Layer Superlattice (SLS) for large format space-based sensor applications. The epi materials will be grown with Sb-capable multi-wafer production Molecular Beam Epitaxy (MBE) reactor at IntelliEPI IR. The initial goal includes ...

    SBIR Phase I 2015 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government