You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Detecting and Correcting Adaptive and Conventional Test Compromise

    SBC: Algorithm Design & Measurement            Topic: N/A

    Project objectives briefly described: i. Improve accuracy of measurement for cheating examinees by using a scoring method that takes account of the credibility of the examinee's patterm of wrong answers. ii. Provide an adjunct to on-line calibration that would assist in timing the replacement of items. iii. Identify test sites and recruiters that are associated with high rates of item compromis ...

    SBIR Phase I 1995 Department of DefenseNavy
  2. ADAPTIVE SUBBAND DECOMPOSITIONS FOR ARBITRARY TIME-FREQUENCY TILINGS

    SBC: Adaptronics, Inc.            Topic: N/A

    The extension of classical frequency domain and wavelet transformation adaptive subband decompositions result in arbitrary time frequency til. The use of a time-varying tree-structured filterbank is proposed to provide a signal dependent transform which is capable of tracking non-stationarities via local reconfigurations. Under stationary assemptions, the filterbank converges to a unitary operat ...

    SBIR Phase I 1995 Department of DefenseNavy
  3. Catalytic Conversion Recycling Process for Composite Aircraft Components

    SBC: Adherent Technologies, Inc.            Topic: N/A

    Cured aircraft composite materials present a particularly difficult challenge for recycling technology. Those materials have mostly thermosetting epoxy matrices and occur in intimate association with metals, paints, and coatings. Current techniques for recycling thermoset composites, mostly for automotive sheet molding compounds (SMC), involve pulverizing the material for use as fillers. Th ...

    SBIR Phase I 1996 Department of DefenseNavy
  4. Tertiary Recycling Process for Shipboard Plastic Processor Product

    SBC: Adherent Technologies, Inc.            Topic: N/A

    A novel tertiary recycling process is proposed for investigation as an economical means for recycling shipboard plastic waste. Early development work has shown that this process can convert a wide variety of polymers and composites into low molecular weight hydrocarbons at temperatures below 200'C. The hydrocarbons produced can then be reused as chemicals, fuels, or monomers. Metal, glass, and fil ...

    SBIR Phase I 1996 Department of DefenseNavy
  5. NONDESTRUCTIVE EVALUATION OF CERAMIC USING SYSTEM IDENTIFICATION

    SBC: Advanced Technologies/Laboratories Intl            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseNavy
  6. Propulsion Capability for 3-Inch Submarine Countermeasures

    SBC: ZIMMERMAN ASSOC., INC.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of DefenseNavy
  7. Advanced Gun Design for Naval Vessels

    SBC: APPLIED ORDNANCE TECHNOLOGY            Topic: N/A

    The design of vertically firing gun is merely a simplified version of a normal large caliber gun system. The fixed orientation of the weapon simplifies the ammunition feed and loading system as well as eliminating the need for an equilibration The challenges of the current proposed system are presented by rate of fire, vertical height limitation, structural required to accomodate high loads o ...

    SBIR Phase I 1996 Department of DefenseNavy
  8. PROCESS CONTROL FOR PRODUCTION OF HIGHLY SOLID FILLED EXPLOSIVES

    SBC: APPLIED ORDNANCE TECHNOLOGY            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseNavy
  9. Methodology to Predict Ballistic Penetration and Damage of Composite Laminated Structures

    SBC: Applied Research Associates, Inc.            Topic: N/A

    Current utilization of composite materials in air and surface weapons systems and structures is extensive, and the use of these materials can be expected to increase in the future. Weapons effectiveness assessments and the design of protective structures require methodologies to predict the terminal ballistic interactions between projectiles and fragments penetrating composite laminated target st ...

    SBIR Phase I 1996 Department of DefenseNavy
  10. Engineering Models of Reactive Munitions and Damage Effects

    SBC: Applied Research Associates, Inc.            Topic: N/A

    Warhead design calculations and weapons effectiveness estimates require a methodology to predict structural response and the associated damage to air targets from reactive munitions. The objectives for the proposed Phase I study effort are to develop candidate launch conditioning, reaction initiation and reaction rate methodology, to incorporate existing ballistic, blast and quasi-static pres ...

    SBIR Phase I 1997 Department of DefenseNavy
US Flag An Official Website of the United States Government