You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Novel Adhesives For Space Applications

    SBC: Adherent Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1997 National Aeronautics and Space Administration
  2. Family Of Advanced Ablative Heat Shields Of Moderate-To-Low Density

    SBC: Applied Research Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1997 National Aeronautics and Space Administration
  3. Extended Operating Temperature Range Of Self Humidified Proton Exchange Membrane Fuel Cells

    SBC: Bcs Technology Inc            Topic: N/A

    N/A

    SBIR Phase I 1997 National Aeronautics and Space Administration
  4. Solar Waveguide-Heated Fluidized Reactor For Lunar Oxygen Production

    SBC: Carbotek Inc            Topic: N/A

    N/A

    SBIR Phase I 1997 National Aeronautics and Space Administration
  5. Ultralight Inflatable Fresnel Lens Solar Concentrators For Space Power

    SBC: ENTECH, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1997 National Aeronautics and Space Administration
  6. Non-Polluting Solvent And System For Surface Cleaning

    SBC: ENVIRONMENTAL TECHNOLOGY & EDUCATION CTR            Topic: N/A

    N/A

    SBIR Phase I 1997 National Aeronautics and Space Administration
  7. High-Performance Environmentally Safe Refrigerant

    SBC: ENVIRONMENTAL TECHNOLOGY & EDUCATION CTR            Topic: N/A

    N/A

    SBIR Phase I 1997 National Aeronautics and Space Administration
  8. Integration Of Process Based Cost (Pbc) Models Into Robust Design Simulation (Rds) For Aircraft Life Cycle Cost Analysi

    SBC: Executive Aerosystems Inc            Topic: N/A

    N/A

    SBIR Phase I 1997 National Aeronautics and Space Administration
  9. Spatially Immersive Visualization Of On-Orbit Operations

    SBC: Graphics Software Services            Topic: N/A

    N/A

    SBIR Phase I 1997 National Aeronautics and Space Administration
  10. A Flight Rated Time Of Flight Mass Spectrometer With 10(-15) Torr Sensitivity For Insitu Thin Film Process Control

    SBC: IONWERKS INC            Topic: N/A

    N/A

    SBIR Phase I 1997 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government