You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. REAL-TIME COLLECTION OF OPERATIONAL DATA TO SUPPORT RISK-BASED OPERATION REGULATION AND INSPECTIONS AT NUCLEAR POWER PLANTS

    SBC: Accident Prevention Group            Topic: N/A

    COMPUTERIZED DATA COLLECTION DEVICES EXIST AND ARE BEING USED IN VARIOUS APPLICATIONS AT SOME NPPS FOR SYSTEMS AND EQUIPMENT NOT INSTRUMENTED IN THE CONTROL ROOM. HOWEVER, CURRENT APPLICATIONS IN THE NUCLEAR POWER INDUSTRY ARE RATHER SPORADIC AND NOT EXPLOITING THE FULL POTENTIAL OF THE TECHNOLOGY. FOR EXAMPLE, SEVERAL DIFFERENT NPPS USE SUCH SYSTEMS FOR SINGLE- PURPOSES SUCH AS TRENDS IN EQUIPMEN ...

    SBIR Phase I 1993 Nuclear Regulatory Commission
  2. ADVANCED METHODS FOR MODELING TEAM EFFECTS ON CONTROL-ROOM OPERATOR PERFORMANCE IN REAL-TIME

    SBC: ASCA, INC.            Topic: N/A

    THIS RESEARCH SEEKS THE DEVELOPMENT AND DEMONSTRATION OF A MODEL THAT REPRESENTS THE GROUP DECISION-MAKING PROCESSES TAKING PLACE INSIDE THE CONTROL ROOM OF A NUCLEAR POWER PLANT UNDER BOTH NORMAL AND ABNORMAL OPERATING CONDITIONS. COGNITIVE DECISIONS, TEAM EFFECTS, AND DYNAMIC FEATURES ARE AMONG THE MAJOR ISSUES THAT WILL BE ADDRESSED IN THE PROJECT. THE BASIC TOOL TO BE USED IS THE INFLUENCE DIA ...

    SBIR Phase I 1993 Nuclear Regulatory Commission
  3. A SIMPLE METHOD FOR SOLUBILITY TESTING OF RADIONUCLIDES ON AIR FILTER

    SBC: Radiation Safety Engineering, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1993 Nuclear Regulatory Commission
  4. COMPUTERIZED EMERGENCY OPERATION PROCEDURES RESEARCH

    SBC: Accident Prevention Group            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  5. AN ADAPTING FINITE ELEMENT MODEL FOR UNSATURATED POROUS MEDIA

    SBC: Advanced Projects Research, Incorporated            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  6. DEVELOPMENT OF TOOLS FOR SAFETY ANALYSIS OF CONTROL SOFTWARE IN ADVANCED REACTORS

    SBC: Advanced Systems Concepts            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  7. CONTINUOUS SPECTROGRAPHIC ANALYSIS OF VANADOUS AND VANADIC IONS

    SBC: Omni Tech International Ltd            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  8. A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS

    SBC: TPL, INC            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  9. EVAL OF RELIABILITY & USEFULNESS OF EXTERNAL-INITIATOR PRA METHODOLOGIES

    SBC: Future Resources Associate Inc            Topic: N/A

    THE DISCIPLINE OF EXTERNAL-INITIATOR PRA ANALYSIS IS RELA- TIVELY LESS MATURE AND LESS RELIABLE THAN THE CORRESPONDING INTERNAL-INITIATORS PRA ANALYSIS. THESE RELATIVE WEAKNESSESHAVE MADE MANY DECISION-MAKERS, IN BOTH INDUSTRY AND THE NRCRELUCTANT TO USE EXTERNAL-INITIATOR PRA RESULTS. THE EXTER-NAL-INITIATOR ANALYSES HAVE BEEN CONSIDERED TOO UNCERTAIN, OR TOO CONSERVATIVE, OR SUPPORTED BY TOO LIT ...

    SBIR Phase I 1988 Nuclear Regulatory Commission
  10. IMPROVED MODEL FOR PREDICTING J-R CURVES FROM CHARPY DATA

    SBC: Modeling & Computing Services            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government