You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. VALIDATION & TESTING OF THE VAM2D COMPUTER CODE

    SBC: Hydrogeologic Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  2. FOLLOWING A POST-IRRADIATION THERMAL ANNEAL CYCLE

    SBC: Materials Engineering &            Topic: N/A

    THIS RESEARCH WILL DETERMINE THE CHARACTERISTICS OF FATIGUE INITIATION LIFE, FATIGUE CRACK GROWTH RATES, AND SLOW-STABLECRACK EXTENSIONS FOLLOWING A POST-IRRADIATION ANNEAL. FATIGUE INTITIATION LIFE WILL BE DETERMINED WITH SMOOTH SPECIMENS OF 308 STAINLESS STEEL WHICH HAVE BEEN ANNEALED AND THEN CYCLED IN PRESSURIZED, HIGH-TEMPERATURE WATER. SUBMERGED ARC WELD STEEL (LINDE 80 FLUX) WILL BE PARTIAL ...

    SBIR Phase I 1983 Nuclear Regulatory Commission
  3. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  4. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  5. LONG RANGE RADIOACTIVE PLUME TRANSPORT SIMULATION MODEL/CODE

    SBC: Sigma Research Corp            Topic: N/A

    THE OBJECTIVE OF THE PHASE I RESEARCH IS TO DETERMINE THE TECHNICAL FEASIBILITY OF THE DEVELOPMENT OF A LONG RANGE RADIOACTIVE PLUME TRANSPORT MODEL/CODE FOR THE NRC. THIS CODE WOULD BE USED TO SIMULATE THE MOVEMENT, DISPERSION, DECAY, AND DEPOSITION OF RADIONUCLIDES RELEASED FROM SEVERE NUCLEAR REACTOR ACCIDENTS, SUCH AS THE CHERNOBYL ACCIDENT. IT IS DESIRED THAT ALL RELEVANT PHYSICAL AND CHEMICA ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  6. Self-Monitoring Surveillance System for Prestressing Tendons

    SBC: Construction Technology            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  7. Development of a Performance Assessment Process Controller

    SBC: Innovative Tech. Solutions            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  8. Inservice Diagnostics of Motor Operated Valves

    SBC: ACENTECH INCORPORATED            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  9. Advanced Digital Man-Machine Interface Analysis

    SBC: Ryan Nuclear, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  10. A Detection System for Determining the Concentration, Size, and Depth of Buried Radioactive Material

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government