You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Low-Loss HTS Coil System for High Energy Physics Detector Applications

    SBC: Ability Engineering Technology            Topic: N/A

    177 Low-Loss HTS Coil System for High Energy Physics Detector Applications--Ability Engineering Technology, Inc., 16140 Vincennes Avenue, South Holland, IL 60473-1283; Mr. Michael W. Morgan, Principal Investigator Mr. Joseph A. Zawistowski, Business Official DOE Grant No. DE-FG02-97ER82307 Amount: $75,000 The use of high-temperature superconducting (HTS) coils (those that superconduct when co ...

    SBIR Phase I 1997 Department of Energy
  2. TECHNOLOGY INNOVATIONS FOR VACCUM ARC ION SOURCES

    SBC: Acceleration Consultants Inc            Topic: N/A

    ION SOURCES BASED ON VACUUM ARC TECHNOLOGY HAVE SEVERAL IMPORTANT ADVANTAGES. THEY CAN GENERATE A WIDE VARIETY OF METAL IONS, PRODUCE HIGH CURRENT FRACTIONS OF MULTIPLY-CHARGED IONS, AND ARE EASY TO OPERATE. UNFORTUNATELY, EXISTING ARC SOURCES HAVE TECHNOLOGICAL DRAWBACKS. A STABLE DISCHARGE REQUIRES HIGH CURRENT (>200A), LIMITING THE SOURCE PULSE LENGTH AND LIFETIME. IN THIS PHASE I PROJECT, IMPR ...

    SBIR Phase I 1991 Department of Energy
  3. Ultrafast Polysilylene Scintillators

    SBC: Adherent Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  4. A Reusable, Non-Toxic, Non-Lethal Activated Barrier to Delay Unauthorized Intruders by Vision Obscuration

    SBC: Advanced Safeguards, Inc.            Topic: N/A

    40436 November 18, 1996 Advanced Safeguards, Inc. In high-security Department of Energy and Department of Defense facilities, cold-chemical smoke generators are used to produce visual obscurants in order to delay unauthorized intruders. The technology is based on the rapid rejection of two chemicals, contained within the device, into the surrounding air w ...

    SBIR Phase I 1996 Department of Energy
  5. AN AXIAL PROFILE MONITOR FOR CHARGED PARTICLE BEAMS

    SBC: Amparo Corp.on            Topic: N/A

    A NOVEL, NONDESTRUCTIVE, LONGITUDINAL, CHARGED PARTICLE BEAMDIAGNOSTIC TOOL TO MEASURE LONGITUDINAL BEAM PROFILE AND CHARGE DENSITY DISTRIBUTION IS BEING STUDIED. THE CONCEPT IS BASED ON THE EFFECT OF MUTUAL ATTRACTIVE FORCES EXERTED BY THE PARTICLE BEAM ON A COLLINEAR ELECTRON BEAM OF MATCHEDVELOCITY. ANY MOVING CHARGED PARTICLE BEAM EXERTS AN ATTRACTIVE FORCE ON ELECTRONS IN ITS VICINITY. THIS F ...

    SBIR Phase I 1991 Department of Energy
  6. High Power Target Design for a Next Generation Radioactive Beam ISOL-Type Facility

    SBC: Amparo Corp.on            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  7. N/A

    SBC: Arc Engineering            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of Energy
  8. AN IMPROVED RADIOGRAPHIC IMAGING TECHNIQUE FOR FREE LIQUID DETECTION IN CEMENT SOLIDIFIED DRUMS OF NUCLEAR WASTE

    SBC: BIO-IMAGING RESEARCH, INC.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Energy
  9. DEVELOPMENT OF A HIGH SPATIAL RESOLUTION NEUTRON DETECTOR

    SBC: BIOTRACES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of Energy
  10. A HIGH SPATIAL RESOLUTION SPECTROGRAPH FOR DNA SEQUENCING

    SBC: Chromex Inc.            Topic: N/A

    IF THE HUMAN GENOME PROJECT IS TO BE SUCCESSFUL, MUCH MORE RAPID DNA SEQUENCING WILL BE REQUIRED. IT IS ESTIMATED THAT PRESENT TECHNOLOGY IS 100-500 TIMES TOO SLOW TO PERMIT SEQUENCING OF THE ENTIRE HUMAN GENOME BY THE ORIGINAL PROJECTED COMPLETION DATE OF 2005. CURRENTLY, THE MOST SUCCESSFUL TECHNOLOGY EMPLOYED FOR LARGE SCALE DNA SEQUENCING INVOLVES REAL-TIME, FOUR COLOR, FLUORESCENT LINE IMAGIN ...

    SBIR Phase I 1993 Department of Energy
US Flag An Official Website of the United States Government