You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
GPS Synchronized Time Code Generator for Airborne PCM Applications
SBC: SVS R&D SYSTEMS, INC. Topic: N/ACoordination of spatially-separated vehicles and test articles during testing and training exercises generates a requirement for closely-matched timing at each location to provide data and event correlation. The use of Global Positioning System (GPS) receivers for timing as well as positioning information greatly increases the accuracy of the data as well as reduces the effort (and cost) of corre ...
SBIR Phase I 1995 Department of DefenseNavy -
DEV OF A LARGE CROSS SECTIONAL AREA SELF-POWERED DETECTOR
SBC: K E M P CORP Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission -
EVALUATION OF EDDY-CURRENT AND BETA-BACKSCATTER TECHNIQUES FOR IN SITU MEASUREMENTS OF COMPLEX COATING THICKNESSES ON TURBINE...
SBC: K E M P CORP Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseNavy -
IMPROVED NEUTRON SPECTROMETER AND EXPOSURE METER
SBC: Shonka Research Associates Topic: N/ATHE UNCERTAINTY IN MEASURING NEUTRON DOSE EQUIVALENT RATES RESULTS IN UNCERTAINTY IN ASSIGNMENT OF THE PROPER DOSE TO OCCUPATIONAL RECORDS AND CAN RESULT IN IMPROPER IMPLEMENTATION OF CONTROLS TO LIMIT THE EXPOSURE. A NOVEL PORTABLE NEUTRON SPECTROMETER IS PROPOSED WHICH WILL REDUCE THE UNCERTAINTY OF SUCH MEASUREMENTS TO LESS THAN 20%. MANYCOMPONENTS OF THIS DEVICE ARE COMMERCIALLY AVAILABLE. SYS ...
SBIR Phase I 1990 Nuclear Regulatory Commission -
MULTI-LINE ARRAY RETRIEVAL AND STOWAGE SYSTEM
SBC: Product Planning, Inc. Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseNavy -
Self-Monitoring Surveillance System for Prestressing Tendons
SBC: Construction Technology Topic: N/AN/A
SBIR Phase I 1995 Nuclear Regulatory Commission -
Development of a Performance Assessment Process Controller
SBC: Innovative Tech. Solutions Topic: N/AN/A
SBIR Phase I 1995 Nuclear Regulatory Commission -
A Detection System for Determining the Concentration, Size, and Depth of Buried Radioactive Material
SBC: Shonka Research Associates Topic: N/AN/A
SBIR Phase I 1995 Nuclear Regulatory Commission -
DIGITAL TANGENTIAL X-RAY SCANNER FOR LOADED ROCKET MOTORS
SBC: Omega International Technology, Inc. Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseNavy -
COMPUTATIONAL OPTIMIZATION OF HYPERSONIC BODIES
SBC: Windrock Assoc Topic: N/AN/A
SBIR Phase I 1988 Department of DefenseNavy