You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ADVANCED VACUUM INSULATION FOR REFRIGERATED SHIPPING CONTAINERS

    SBC: Re/Spec Inc.            Topic: N/A

    A RESEARCH PROGRAM IS PROPOSED TO DETERMINE THE FEASIBILITY OF USING ADVANCED VACUUM INSULATIONS TO IMPROVE THE PRODUCTIVITY OF REFRIGERATED SHIPPING CONTAINERS WHILE AVOIDING THE ENVIRONMENTAL RISKS ASSOCIATED WITH CHLOROFLUOROCARBONS (CFC'S) IN FOAM INSULATION CURRENTLY BEING USED. ADVANCED VACUUM INSULATIONS, CURRENTLY UNDER RESEARCH AND DEVELOPMENT, DO NOT CONTAIN CFC'S AND HAVE VERYHIGH THERM ...

    SBIR Phase I 1990 Department of Transportation
  2. A Low Cost Fire-Retardant Material Alternative for School Buses

    SBC: ATS-MER, LLC            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  3. A PC-BASED SIMULATOR WITH EXPERT SYSTEM FOR AIRSPACE DESIGN

    SBC: Wesson International Inc.            Topic: N/A

    INNOVATIVE METHODS OF MAN/MACHINE COMMUNICATION WILL BE PROPOSED, IMPLEMENTED, AND STUDIED EXPERIMENTALLY WITHIN THECONTEXT OF AN EXISTING HIGH-FIDELITY PC-BASED ATC SIMULATOR (TRACON(TM)). THE SPECIFIC POSSIBILITIES INCLUDE, BUT ARE NOT LIMITED TO, MOUSE/TRACKBALL-BASED POPUP AND PULLDOWN MENUS AND DIALOG BOXES, VOICE I/O FOR DATABASE LOOKUP, DIGITAL COMMUNICATIONS INCLUDING A TACTICAL COMMUNICAT ...

    SBIR Phase II 1990 Department of Transportation
  4. A Proposal to Develop the UTD Breakaway Link for Use in Utility Pole Guy Wires

    SBC: UTD, INC.            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  5. Broken Rail Detection

    SBC: TEXAS RESEARCH INSTITUTE , AUSTIN, INC.            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  6. DEVELOPMENT OF AN OCCUPANT RESTRAINT DEVICE FOR WHEELCHAIR USERS ON SCHOOL BUSES

    SBC: Simula, Inc.            Topic: N/A

    AN INCREASING NUMBER OR WHEELCHAIR-BOUND STUDENTS ARE ATTENDING PUBLIC SCHOOLS, A PROCESS KNOWN AS "MANINSTREAMING". CONSEQUENTLY, PROTECTING THESE STUDENTS IN THE EVENT OF A SCHOOL BUS COLLISION IS A SIGNIFICANT SAFETY ISSUE. EXISTING RESTRAINT SYSTEMS TEND TO FOCUS ON RESTRAINING THE WHEELCHAIR RATHER THAN THE OCCUPANT. DISCUSSED IN THIS PROPOSAL IS A SYSTEM TO PROTECT A WHEELCHAIR STUDENT INVOL ...

    SBIR Phase I 1990 Department of Transportation
  7. Disposable Micromachined Flow Immunoassay for Field Detection of Contaminants

    SBC: American Research Corporation of Virginia            Topic: N/A

    The use of enzyme-linked immunosorbent assay (ELISA) to detect contaminants such as solvents, fuels, and pesticides in soil and water samples is now well established. Although ELISA and related methods can facilitate analysis of samples, several washing and separation steps are involved that require 30 to 120 minutes per sample to reach equilibrium. Recently, near infrared fluorescence immunoassa ...

    SBIR Phase I 1997 Environmental Protection Agency
  8. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  9. Feasibility Study of an Internet-Based GUI for Highway Capacity Software

    SBC: Viggen Corp.on            Topic: N/A

    In this proposal, the Viggen Project Team presents an elegant approach to developing a truly portable Graphical User Interface (GUI) for the Highway Capacity Software (HCS). Our approach is based on the emerging Internet-driven computing technology and will be totally platform-independent. The prototype will be developed using a programming language called Java and users will be able to execute ...

    SBIR Phase II 1997 Department of Transportation
  10. Feasibility Study of an Internet-Based GUI for Highway Capacity Software

    SBC: Viggen Corp.on            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Transportation
US Flag An Official Website of the United States Government