  1. Extending the Dynamic Flowgraph Methodology (DFM) to Model Human Performance and Team Effects

    SBC: ASCA, INC.            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  2. EVAL OF RELIABILITY & USEFULNESS OF EXTERNAL-INITIATOR PRA METHODOLOGIES

    SBC: Future Resources Associate Inc            Topic: N/A

    THE DISCIPLINE OF EXTERNAL-INITIATOR PRA ANALYSIS IS RELA- TIVELY LESS MATURE AND LESS RELIABLE THAN THE CORRESPONDING INTERNAL-INITIATORS PRA ANALYSIS. THESE RELATIVE WEAKNESSESHAVE MADE MANY DECISION-MAKERS, IN BOTH INDUSTRY AND THE NRCRELUCTANT TO USE EXTERNAL-INITIATOR PRA RESULTS. THE EXTER-NAL-INITIATOR ANALYSES HAVE BEEN CONSIDERED TOO UNCERTAIN, OR TOO CONSERVATIVE, OR SUPPORTED BY TOO LIT ...

    SBIR Phase I 1988 Nuclear Regulatory Commission
  3. VALIDATION & TESTING OF THE VAM2D COMPUTER CODE

    SBC: Hydrogeologic Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  4. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: Kalsi Engineering, Incorporated            Topic: N/A

    THIS PROJECT IS AIMED AT DEVELOPING TECHNIQUES FOR PREDICTING CHECK VALVE PERFORMANCE AND ITS INTERNAL COMPONENTS DEGRADATION IN PRACTICAL PIPING SYSTEMS USED IN NUCLEAR POWER PLANTS. THE MAIN FOCUS OF THE EFFORT IS TO SYSTEMATICALLY EVALUATE THE EFFECT OF UPSTREAM DISTURBANCES WHICH ARE WITHIN 10 DIAMETERS UPSTREAM. BY USING A COMBINED THEORETICAL AND EXPERIMENTAL APPROACH, GENERALIZED NONDIMENSI ...

    SBIR Phase II 1988 Nuclear Regulatory Commission
  5. IMPROVED MODEL FOR PREDICTING J-R CURVES FROM CHARPY DATA

    SBC: Modeling & Computing Services            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  6. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission