You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Self-Monitoring Surveillance System for Prestressing Tendons

    SBC: Construction Technology            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  2. USE OF CERAMIC FUEL CLADDING TO REDUCE THE SEVERITY OF LMR ACCIDENTS

    SBC: Gamma Engineering Corporation            Topic: N/A

    THIS PROJECT INVESTIGATES THE FEASIBILITY OF USING CERAMIC CLADDING MATERIALS TO REPLACE THE METALLIC CLADDING MATERIALS NOW USED WITH WATER REACTOR FUEL. SHOULD FEASIBILITY BE DETERMINED, AND EVENTUALLY COMMERCIALIZED, THE ABILITY OF WATER REACTORS TO WITHSTAND SEVERE ACCIDENTS WOULD BE ENHANCED. WITH TODAYS METAL CLAD FUEL, A RELATIVELY SHORT TIME PERIOD IS AVAILABLE AFTER A LOSS OF COOLANT ACCI ...

    SBIR Phase I 1989 Nuclear Regulatory Commission
  3. VALIDATION & TESTING OF THE VAM2D COMPUTER CODE

    SBC: Hydrogeologic Inc.            Topic: N/A

    SEVERAL STATES ARE CURRENTLY SEEKING MUCH-NEEDED NEW LOW-LEVEL RADIOACTIVE DISPOSAL SITES IN ACCORDANCE WITH THE LOW-LEVEL RADIOACTIVE WASTE POLICY ACT OF 1980. ANY NEW COMMERCIALREQUIREMENT THAT A SITE BE CAPABLE OF BEING MODELED AND THATITS PERFORMANCE BE ASSURED FOR 500 YEARS. FOR MOST SITES, THE HYDROGEOLOGICAL AND RADIONUCLIDE TRANSPORT CHARACTERIS- TICS OF THE UNSATURATED ZONE ARE MAJOR FACT ...

    SBIR Phase II 1989 Nuclear Regulatory Commission
  4. VALIDATION & TESTING OF THE VAM2D COMPUTER CODE

    SBC: Hydrogeologic Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  5. Development of a Performance Assessment Process Controller

    SBC: Innovative Tech. Solutions            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  6. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  7. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    THE RESEARCH PROGRAM WILL DEVELOP A MICROCOMPUTER BASED SYSTEM OF HARDWARE AND SOFTWARE WHICH WILL ALLOW THE USER TOEXECUTE MAINFRAME BASED CODES ON THE MICROCOMPUTER. IN ADDITION PARALLEL EXECUTION OF SEVERAL CODES AT ONCE IS POSSIBLEA SPECIAL INPUT AND OUTPUT PROCESSOR MODULES WILL ALSO BE DEVELOPED TO DEMONSTRATE THE USER FRIENDLY CAPABILITIES OF THE SYSTEM AND FACILITATE INPUT PREPARATION AND ...

    SBIR Phase II 1989 Nuclear Regulatory Commission
  8. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  9. Advanced Digital Man-Machine Interface Analysis

    SBC: Ryan Nuclear, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  10. DEVELOPMLENT OF A LAUNDRY MONITOR FOR DETECTION OF HOT PARTICLE CONTAMINATION

    SBC: Shonka Research Associates            Topic: N/A

    TWO APPROACHES WILL BE EXAMINED TO SIGNIFICANTLY IMPROVE THESENSITIVITY OF LAUNDRY MONITORS TO DETECT AND SPECIFY LOCATION OF HOT PARTICLES ON LAUNDERED GARMENTS. THESE PROPOSED TECNIQUES HAVE HIGH POTENTIAL FOR DETECTING BOTH LOW ENERGY BETA AND ALPHA PARTICLE RADIATION AS WELL AS IMPROVING SENSITIVITY BY REDUCING BACKGROUND COUNT RATE.

    SBIR Phase II 1990 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government