You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ASSESSMENT OF SMART SENSOR TECHNOLOGIES FOR CONVENTIONAL ANDADVANCED LWRS

    SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1991 Nuclear Regulatory Commission
  2. EFFECT OF AGING ON RESPONSE TIME OF NUCLEAR PLANT PRESSURE SENSORS

    SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  3. VALIDATION & TESTING OF THE VAM2D COMPUTER CODE

    SBC: Hydrogeologic Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  4. DEV OF A LARGE CROSS SECTIONAL AREA SELF-POWERED DETECTOR

    SBC: K E M P CORP            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  5. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  6. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government