You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY21 is not expected to be complete until September, 2022.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. WEIGHING TRUCK COMBINATIONS IN MOTION, SOLELY ON THE TRACTOR

    SBC: Airsport Corp.            Topic: N/A

    AN IMPROVED METHOD OF WEIGHING TRUCKS WHILE IN MOTION IS PROPOSED. TO INCREASE EFFICIENCY AND REDUCE TIME LOST AT WEIGH STATIONS, THE TRUCKING INDUSTRY NEEDS TO EXCHANGE DATA, INCLUDING WEIGHT DATA, BETWEEN MOVING TRUCKS AND ENFORCEMENT FACILITIES. LEGALLY LOADED TRUCKS WOULD THEN BE ABLE TO PROCEED WITHOUT STOPPING. THIS INVOLVES WEIGH-IN-MOTION. PRESENT WEIGHING TECHNIQUES INVOLVE LOAD CELLS OR ...

    SBIR Phase II 1995 Department of Transportation
  2. BRL-CAD BASED LUGGAGE SIMULATION TOOL

    SBC: Applied Research Associates, Inc.            Topic: N/A

    MODELING ANBD SIMULATIONS ARE USED EXTENSIVELY IN THE DESIGN AND ANALYSIS OF "BULK" EXPLOSIVES DETECTION DEVICES. HOWEVER, OVERSIMPLIFICATION OF THE INPUT MODEL, NAMELY LUGGAGE AND EXPLOSIVE CONTENTS, CAN LEAD TO POOR DETECTOR DESIGNS. MANUAL PRODUCTION OF SUCH INPUT IS COSTLY AND ERROR PRONE. THIS EFFORT WILL AUTOMATE THE PRODUCTION OF SIMULATED LUGGAGE THROUGH THE DEVELOPMENT OF A COMPUTER TOOL. ...

    SBIR Phase II 1995 Department of Transportation
  3. "Rolling Deflectometer"

    SBC: Applied Research Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Transportation
  4. "Rolling Deflectometer"

    SBC: Applied Research Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Transportation
  5. "Sensor Systems for Hazardous Conditions in High Speed Rail"

    SBC: ENSCO Inc            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Transportation
  6. "Sensor Systems for Hazardous Conditions in High Speed Rail"

    SBC: ENSCO Inc            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Transportation
  7. Ionic Self-Assembled Organic/ Inorganic Nonparticle Coatings and Composites

    SBC: Luna Innovations Incorporated            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  8. Water Quality Monitoring Device

    SBC: Gky And Associates, Inc.            Topic: N/A

    The research is to develop a sheet flow sampler to collect highway washoff and to operate in a highway roadside environment. The proposed sampler is expendable, simple, and cost effective. It will collect a predetermined depth of runoff (most commonly the first 1/2 inch of "first flush"), store it, and be removed and replaced by maintenance workers following rain events. The sampler will be its ...

    SBIR Phase II 1997 Department of Transportation
  9. Water Quality Monitoring Device

    SBC: Gky And Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Transportation
  10. NATIONAL HIGHWAY TRAFFIC SAFETY ADMINISTRATION-- EMERGENCY MEDICAL SERVICES

    SBC: Humrro International Inc.            Topic: N/A

    HUMRRO INTERNATIONAL, INCORPORATED PROPOSES TO DEVELOP AND EVALUATE THREE PROTOTYPE VIDEODISC-BASED MODULES FOR USE IN MAINTAINING THE SKILLS OF EMERGENCY MEDICAL TECHNICIANS (EMTS). TOPICS FOR THE PROTOTYPE MODULES WILL BE SELECTED BASED ON NEEDS IDENTIFIED IN OTHER RESEARCH. EXISTING VIDEODISCS WHICH ILLUSTRATE EMERGENCY SCENES WILL BE REPROGRAMMED IN ACCORDANCE WITH ALGORITHIMS WHICH SPECIFY AP ...

    SBIR Phase II 1988 Department of Transportation
US Flag An Official Website of the United States Government