You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Development of a Performance Assessment Process Controller

    SBC: Innovative Tech. Solutions            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  2. DYNAMIC PRESSURE GAGE DEVELOPMENT FOR SUBSONIC FLOWS

    SBC: Tech Reps Inc            Topic: N/A

    THE OBJECTIVE OF THIS PROJECT IS TO DEVELOP AN IMPROVED DIFFERENTIAL PRESSURE GAGE FOR DETERMINING DYNAMIC PRESSURE WITHIN BLAST AND SHOCK WAVE FLOWS WHERE THE FLOWS ARE SUBSONIC. DERIVATION OF DYNAMIC PRESSURE FROM A MEASUREMENT OF THE DIFFERENCE BETWEEN STAGNATION PRESSURE AND SIDE-ON OR STATIC PRESSURE REQUIRES USE OF THE SIDE-ON PRESSURE RECORD TO CORRECT FOR COMPRESSIBILITY EFFECTS. CURRENTLY ...

    SBIR Phase I 1988 Department of DefenseDefense Threat Reduction Agency
  3. STUDY OF ION MASS EFFECTS ON LONG CONDUCTION TIME PLASMA OPENING SWITCHES USING RESONANT DIAGNOSTIC TECHNIQUES

    SBC: HY-Tech Research Corp.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseDefense Threat Reduction Agency
  4. VALIDATION & TESTING OF THE VAM2D COMPUTER CODE

    SBC: Hydrogeologic Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  5. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  6. PULSED POWER TECHNOLOGY

    SBC: TPL, INC            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of DefenseDefense Threat Reduction Agency
  7. SUBSCALE TESTING OF ROCKBOLTED TUNNELS IN JOINTED MEDIA

    SBC: Applied Research Associates, Inc.            Topic: N/A

    DEVELOPMENT OF AN INNOVATIVE AND ECONOMICAL EXPERIMENTAL METHOD IS PROPOSED WHICH CAN PROVIDE THE BASIC BEHAVIOR DATA NECESSARY TO MEET THE DNA OBJECTIVE OF PROVIDING ADEQUATE ANALYSIS, DESIGN AND ASSESSMENT METHODS FOR MINIMALLY HARDENED TUNNELS. THIS DEVELOPMENT IS ACCOMPANIED BY ANALYSIS CAPABLE OF REPRESENTING THE COMPLEX INELASTIC MATERIAL BEHAVIOR OF THE ROCK MASS AND OF REPRESENTING SIMPLE ...

    SBIR Phase I 1988 Department of DefenseDefense Threat Reduction Agency
  8. DEVELOPMENT OF A HIGH DYNAMIC RANGE DOWNHOLE SIGNAL CONDITIONING MODULE

    SBC: Applied Research Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseDefense Threat Reduction Agency
  9. Separation of Carrier Lifetime from Interface Recombination Velocity

    SBC: INTERFACE STUDIES, INC.            Topic: N/A

    This Small Business Innovation Research Phase I project will separate minority-carrier lifetime measurements on Silicon-on-Insulator (SOI) wafers. We have already implemented an effective carrier lifetime measurement to characterize SOI samples as thin as 50 nm. this proposal will improve our non-invasive probe of the electrical quality of semiconductor wafers to explicityly and separately chara ...

    SBIR Phase I 1996 Department of DefenseDefense Threat Reduction Agency
  10. RISK-BASED ANALYSIS OF TECHNICAL SPECIFICATIONS

    SBC: Applied Biomathematics Inc            Topic: N/A

    THE FRANTIC COMPUTER CODE IS THE MOST ADVANCED MODEL FOR ADDRESSING TIME-DEPENDENT RISK EFFECTS ASSOCIATED WITH TECHNICAL SPECIFICATIONS. IT IS USED BY THE INDUSTRY FOR THE EVALUATION OF UPGRADES AND/OR IMPROVEMENTS IN EXISTING TECHNICAL SPECIFICATIONS AND BY THE NRC STAFF IN RESPONDING TO THE LICENSEE SUBMITTALS. THE EXISTING METHODOLOGY HAS TWO MAJOR DEFICIENCIES: IT DOES NOT PROVIDE THE BOUNDIN ...

    SBIR Phase II 1988 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government