You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY21 is not expected to be complete until September, 2022.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. SUB MICROMETER MICROBIAL AEROSOL GENERATOR

    SBC: Babington Engineering            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseArmy
  2. TESTING OF BUILT-IN-TEST (BIT) SOFTWARE

    SBC: C Max Co Inc            Topic: N/A

    THIS PROGRAM WILL DEVELOP TECHNIQUES, PROCEDURES, AND SPECIALIZED INSTRUMENTATION TO ACCESS THE BUILT-IN-TEST (BIT) SOFTWARE WITHIN A PRIME EQUIPMENT. CONTROL OF THE ACCESS INSTRUMENTATION AND BIT TESTING WILL BE ACCOMPLISHED WITH A PC XT TYPE COMPUTER. THE CONTROL SOFTWARE WILL BE DEVELOPED USING THE DEPARTMENT OF DEFENSE ADA LANGUAGE AND WILL BE TITLED ADA LANGUAGE SOFTWARE TEST PROGRAM (ALSTP). ...

    SBIR Phase I 1988 Department of DefenseArmy
  3. INNOVATIVE APPLICATIONS FOR SWATH TECHNOLOGY IN THE LOGISTICS OVER THE SHORE (LOTS) ENVIRONMENT

    SBC: Designers & Planners Inc            Topic: N/A

    THE OBJECTIVE OF THIS PROJECT IS TO DETERMINE THE TECHNICAL MERIT OF USING SMALL WATERPLANE AREA TWIN HULL (SWATH) CONFIGURED CRAFT FOR LOGISTICS OVER THE SHORE (LOTS) OPERATIONS. RECENT EXERCISES SHOW THAT TRANSFER OF CARGO FROM SHIP TO AN UNOPPOSED SHORE IS LIMITED BY THE RELATIVE MOTION BETWEEN THE CARGO SHIP AND THE LIGHTER WHEN CONDITIONS EXCEED SEA STATE 2. THIS RESTRICTS THE ENTIRE RESUPPLY ...

    SBIR Phase I 1988 Department of DefenseArmy
  4. EFFICIENT DIODE-PUMPED ER:GLASS LASER

    SBC: Laser Technology Inc.            Topic: N/A

    LASER RANGEFINDERS, DESIGNATORS, AND RADARS OPERATING IN THE EYE-SAFE SPECTRAL REGION ARE REQUIRED FOR VARIOUS ARMY MISSIONS. THE REGION AROUND 1.5 MICRONS IS PARTICULARLY ATTRACTIVE. THE FAVORED CURRENT APPROACH TO PRODUCING EYE-SAFE LASERS IS TO RAMAN SHIFT THE OUTPUT OF ND:CLASS, ND:YAG, OR ND:YLF LASERS. WE PROPOSE TO SHOW THE FEASIBILITY OF DEMONSTRATING AN EFFICIENT, ALL SOLIDSTATE, DIODE-PU ...

    SBIR Phase I 1988 Department of DefenseArmy
  5. DEVELOPMENT OF AIRBORNE NUCLEAR RADIATION DETECTOR

    SBC: CENTER FOR REMOTE SENSING, INC.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseArmy
  6. COHERENT FILTER

    SBC: Laser Technology Inc.            Topic: N/A

    WE PROPOSE A MEANS OF CONSTRUCTING A COHERENCE FILTER, WHICH IS TRANSMISSIVE BROADBAND FOR VISIBLE INCOHERENT LIGHT, BUT REFLECTING FOR COHERENT RADIATION.

    SBIR Phase I 1988 Department of DefenseArmy
  7. A THREE DIMENSIONAL MESOSCALE ATMOSPHERIC SIMULATION SYSTEM FOR USE IN VARIOUS MOBILE BATTLEFIELD ENVIRONMENTS

    SBC: MESOSCALE ENVIRONMENTAL SIMULATIONS AND OPERATIONS, INC            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseArmy
  8. AN ADVANCED RAPID INITIATION PROPAGATION IGNITOR SYSTEM FOR LOVA PROPELLANTS

    SBC: TPL, Inc.            Topic: N/A

    RAPID INITIATED PROPAGATION (RIP) IGNITORS PROVIDE MORE UNIFORM FLAME SPREADING THROUGH PROPELLANT BEDS THROUGH CYLINDRICAL WAVE EXPANSION ACCOMPANIED BY REDUCED EXPANSION EFFECTS ON THE PRESSURE PULSE. IMPROVEMENTS IN RIP IGNITOR PERFORMANCE ARE POSSIBLE THROUGH: INCREASES IN PRIMER CHARGE DENSITY, REDUCTION IN IGNITOR FREE VOLUME, BLENDS OF IGNITOR MATERIALS, AND USE OF HIGH EMISSIVITY SOLIDS. T ...

    SBIR Phase I 1988 Department of DefenseArmy
  9. SOFTWARE TECHNOLOGY TO SUPPORT REAL-TIME EMBEDDED ARTIFICIAL INTELLIGENCE BASED APPLICATIONS

    SBC: Software Architecture & Engine            Topic: N/A

    THE CONSTRAINTS OF REAL-TIME APPLICATIONS CANNOT BE SATIFIED SIMPLY BY CHOOSING A MORE EFFICIENT IMPLEMENTATION OF "CLASSICAL" AI TECHNIQUES. THE APPLICATION MUST BE EXPLICITLY ANALYYED, DESIGNED AND BUILT FOR REAL-TIME PERFORMANCE. THE USE OF GENERALIZED AI STRUCTURES AND REASONING PARADIGMS CANNOT MEET REAL-TIME PERFORMANCE REQUIREMENTS, ESPECIALLY ON CONVENTIONAL, STANDARD MILITARY HARDWARE. TH ...

    SBIR Phase I 1988 Department of DefenseArmy
  10. EFFICIENT HF/VHF POWER AMPLIFIERS (INTEGRATED HF/VHF POWER CIRCUITS)

    SBC: Scs Telecom, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseArmy
US Flag An Official Website of the United States Government