You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. RADAR SCATTERING OF COMPOSITE MATERIALS

    SBC: Decision-science            Topic: N/A

    THE DEVELOPMENT OF NEW AND INNOVATIVE TECHNIQUES WHICH DETERMINE ELECTROMAGNETIC SCATTERING BEHAVIOR ARE NECESSARY IN ORDER TO ADVANCE THE STATE-OF-THE-ART IN RADAR CROSS SECTION (RCS) CONTROL. TWO OF THE MORE IMPORTANT ANALYTICAL PROBLEMS REQUIRING SOLUTION IN THIS AREA ARE THE CHARACTERIZATION OF RADAR SCATTERING FROM COMPOSITE MATERIALS AND OPTIMUM APPLICATION OF MATERIAL COATINGS TO METALLIC S ...

    SBIR Phase I 1988 Department of DefenseDefense Advanced Research Projects Agency
  2. STATISTICAL PROCEDURES FOR DETERMINING COMPLIANCE WITH YIELD THRESHOLD NUCLEAR TEST LIMITATIONS

    SBC: ENSCO Inc            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseDefense Advanced Research Projects Agency
  3. IN SITU PARTICLE SENSOR FOR MICROELECTRONIC MANUFACTURING PROCESSES

    SBC: Insitec, Inc.            Topic: N/A

    REAL TIME, ON-LINE PARTICLE CONTAMINATION SENSORS FOR MICROELECTRONIC MANUFACTURING IN PROCESS EQUIPMENT ENVIRONMENTS HAVE THE POTENTIAL TO IMPROVE CHIP YIELDS THROUGH IMPROVED PROCESS CONTROL. CURRENT MICROELECTRONIC MANUFACTURING MONITORS ARE LIMITED TO LOW EFFICIENCY SAMPLING RATES AND GENERAL CLEAN-ROOM MONITORING DURING THE PRODUCTION PROCESS. PRESENTLY THERE IS NO ON-LINE SENSOR CAPABLE OF Q ...

    SBIR Phase I 1988 Department of DefenseDefense Advanced Research Projects Agency
  4. EVALUATION OF HETEROJUNCTION INTERFACES USING ELECTRO BEAM ELECTROREFLECTANCE

    SBC: Charles Evans & Associates            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseDefense Advanced Research Projects Agency
  5. Integrated Risk Management and Quality Assurance

    SBC: Accident Prevention Group            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  6. Extending the Dynamic Flowgraph Methodology (DFM) to Model Human Performance and Team Effects

    SBC: ASCA, INC.            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  7. Development of a Performance Assessment Process Controller

    SBC: Innovative Tech. Solutions            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  8. ADVANCED SUPERCONDUCTING MATERIALS

    SBC: Chronos Research Laboratories            Topic: N/A

    THE RECENT DISCOVERY OF HIGH TEMPERATURE METAL OXIDE SUPERCONDUCTORS SUGGESTS THAT YET ANOTHER NEW CLASS OF SUPERCONDUCTING MATERIALS MAY BE FOUND. THE NEW CATEGORY OF MATERIALS WILL BE INEXPENSIVE TO MANUFACTURE AND EASILY FORMED INTO WIRES AND BANDS. THESE MATERIALS WILL BE MECHANICALLY TOUGH AND MAY HAVE HIGH CRITICAL TEMPERATURES. THE PHASE I GOAL IS TO ESTABLISH THE SUPERCONDUCTING CHARACTERI ...

    SBIR Phase I 1988 Department of DefenseDefense Advanced Research Projects Agency
  9. DESIGN OF A PARALLEL CAD SYSTEM

    SBC: PARASOFT CORPORATION            Topic: N/A

    WE PROPOSE TO STUDY AND EVALUATE ALGORITHMS WHICH ARE APPROPRIATE TO TWO NUMERICALLY INTENSIVE PARTS OF ELECTRICAL CAD SYSTEMS, VIA. COMPONENT PLACEMENT AND CIRCUIT ROUTING. BOTH PROBLEMS ARE EXTREMELY COMPUTATIONALLY INTENSIVE OFTEN REQUIRING TIMES OF THE ORDER OF HOURS ON SEQUENTIAL MACHINES. THE NEED IS FOR TURNAROUND TIMES ON THE ORDER OF MINUTES AND PARALLEL PROCESSING IS A NATURAL WAY TO GAI ...

    SBIR Phase I 1988 Department of DefenseDefense Advanced Research Projects Agency
  10. TRANSFORMATIONAL SYNTHESIS AND REASONING ABOUT THE FUTURE

    SBC: Advanced Decision Systems            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government