You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Low Cost Acoustic Property Sensor for Measuring Natural Gas Composition in Liquid Natural Gas (LNG) Powered Vehicles

    SBC: Commercial Electronics, Inc.            Topic: N/A

    86 A Low Cost Acoustic Property Sensor for Measuring Natural Gas Composition in Liquid Natural Gas (LNG) Powered Vehicles--Commercial Electronics, Inc., 801 North 15th Street, Broken Arrow, OK 74012-2838; (918) 251-0925 Mr. Scott Phillips, Principal Investigator Mr. Michael A. Phillips, Business Official DOE Grant No. DE-FG03-97ER82353 Amount: $75,000 Among the various alternative fuels propos ...

    SBIR Phase I 1997 Department of Energy
  2. LNG Storage and Delivery System Analysis

    SBC: Directed Technologies, Inc.            Topic: N/A

    87 LNG Storage and Delivery System Analysis--Directed Technologies, Inc., 4001 North Fairfax Drive, Suite 775, Arlington, VA 22203-1614; (703) 243-3383 Mr. Brian D. James, Principal Investigator Mr. Ira F. Kuhn, Jr., Business Official DOE Grant No. DE-FG02-97ER82357 Amount: $75,000 To reduce foreign fuel dependence and improve the Nation¿s air quality, new high-efficiency, direct-injection d ...

    SBIR Phase I 1997 Department of Energy
  3. Fiber Optic for the Detection of Co-Contaminant Compounds

    SBC: LUNA INNOVATIONS INCORPORATED            Topic: N/A

    16 Fiber Optic for the Detection of Co-Contaminant Compounds--F&S, Inc., P.O. Box 11704, Blacksburg, VA 24062-1704; (540) 953-4274 Mr. Mark E. Jones, Principal Investigator Ms. Garnett S. Linkous, Business Official DOE Grant No. DE-FG02-97ER82371 Amount: $74,994 Innovative technologies to advance the measurement of biological and physicochemical properties of natural systems are necessary in ...

    SBIR Phase I 1997 Department of Energy
  4. A High-Charge Electron Gun for Dielectric Type Wake-Field Accelerators

    SBC: Fm Technologies Inc            Topic: N/A

    149 A High-Charge Electron Gun for Dielectric Type Wake-Field Accelerators--FM Technologies, Inc., 10529-B Braddock Road, Fairfax, VA 22032-2236; (703) 425-5111 Dr. Frederick M. Mako, Principal Investigator Dr. Frederick M. Mako, Business Official DOE Grant No. DE-FG02-97ER82375 Amount: $75,000 The development of high-current, short-duration pulses of electrons used in injectors of particle a ...

    SBIR Phase I 1997 Department of Energy
  5. A 34 GHz High-Power Micro-Pulse Klystron

    SBC: Fm Technologies Inc            Topic: N/A

    161 A 34 GHzHigh-Power Micro-Pulse Klystron--FM Technologies, Inc., 10529-B Braddock Road, Fairfax, VA 22032-2236; (703) 425-5111 Dr. Frederick M. Mako, Principal Investigator Dr. Frederick M. Mako, Business Official DOE Grant No. DE-FG02-97ER82374 Amount: $75,000 High-current pulses of electrons are widely used in injector systems for electron accelerators, such as industrial linacs, as well ...

    SBIR Phase I 1997 Department of Energy
  6. High Current Density High Repetition Rate Ferroelectric Cathode

    SBC: Fm Technologies Inc            Topic: N/A

    150 High Current Density High Repetition Rate Ferroelectric Cathode--FM Technologies, Inc., 10529-B Braddock Road, Fairfax, VA 22032-2236; (703) 425-5111 Dr. L.K. Len, Principal Investigator Dr. Frederick M. Mako, Business Official DOE Grant No. DE-FG02-97ER82376 Amount: $75,000 Aside from thermionic emission, previous methods of high-current-density electron emission for charged-particle ac ...

    SBIR Phase I 1997 Department of Energy
  7. Ultra-Lightweight Carbon-Carbon Cooling Structure For Pixel and Silicon Strip Detectors

    SBC: HYTEC, INC.            Topic: N/A

    180 Ultra-Lightweight Carbon-Carbon Cooling Structure For Pixel and Silicon Strip Detectors-HYTEC, Inc., 110 Eastgate Dr., Suite 100, Los Alamos, NM 87544-3304; (505) 662-0080 Mr. William O. Miller, Principal Investigator Mr. William O. Miller, Business Official DOE Grant No. DE-FG03-97ER82397 Amount: $75,000 Removal of heat from the next generation of particle detection systems used in high ...

    SBIR Phase I 1997 Department of Energy
  8. Alternative Metal Forming Using Laser Engineered Net Shaping

    SBC: OPTOMEC, INC.            Topic: N/A

    50 Alternative Metal Forming Using Laser Engineered Net Shaping--Optomec Design Company, 13170 B Central Avenue SE, Suite 310, Albuquerque, NM 87123-3032; (505) 343-9139 Mr. David M. Keicher, Principal Investigator Mr. Thomas A. Swann, Business Official DOE Grant No. DE-FG03-97ER82448 Amount: $74,777 Energy intensive metal forming operations are among the most common steps in manufacturing ...

    SBIR Phase I 1997 Department of Energy
  9. A Novel Mass Spectrometer for Characterization of Electrochemical Processes

    SBC: SOUTHWEST SCIENCES INC            Topic: N/A

    63 A Novel Mass Spectrometer for Characterization of Electrochemical Processes--Southwest Sciences, Inc., 1570 Pacheco Street, Suite E-11, Santa Fe, NM 87505-3937; (505) 984-1322 Dr. David S. Bomse, Principal Investigator Mr. Alan C. Stanton, Business Official DOE Grant No. DE-FG03-97ER82478 Amount: $75,000 Electrochemical processes are important to a wide variety of energy related systems suc ...

    SBIR Phase I 1997 Department of Energy
  10. Analysis of Accelerator Tuning Algorithms for Integration with an Automatic Planning and Control System

    SBC: Vista Control Systems, Inc.            Topic: N/A

    145 Analysis of Accelerator Tuning Algorithms for Integration with an Automatic Planning and Control System--Vista Control Systems, Inc., 134-B Eastgate Drive, Los Alamos, NM 87544-3304; (505) 662-2484 Mr. Michael Kroupa, Principal Investigator Mr. Peter N. Klout, Business Official DOE Grant No. DE-FG03-97ER82506 Amount: $74,999 Particle accelerators have moved from being strictly a research ...

    SBIR Phase I 1997 Department of Energy
US Flag An Official Website of the United States Government