You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Accelerating Cavities for a Relativistic Klystron Two-Beam Accelerator
SBC: Fm Technologies Inc Topic: N/AN/A
SBIR Phase I 1996 Department of Energy -
Advanced Water Sensor for Unmanned Aerial Vehicles
SBC: SOUTHWEST SCIENCES INC Topic: N/AN/A
SBIR Phase I 1996 Department of Energy -
A Fully Automated 96-Capillary Array DNA Sequencer
SBC: SPECTRUMEDIX CORPORATION Topic: N/A14 A Fully Automated 96-Capillary Array DNA Sequencer-SpectruMedix Corp., 2124 Old Gatesbury Rd., State College, PA 16803-220; (814) 867-4502 Dr. Quingbo Li, Principal Investigator Mr. Bernard Sonnenschein, Business Official DOE Grant No. DE-FG02-97ER82461 Amount: $75,000 The identification and sequencing of the Human Genome is a continuing worldwide scientific goal in which the Department of ...
SBIR Phase I 1997 Department of Energy -
A 34 GHz High-Power Micro-Pulse Klystron
SBC: Fm Technologies Inc Topic: N/A161 A 34 GHzHigh-Power Micro-Pulse Klystron--FM Technologies, Inc., 10529-B Braddock Road, Fairfax, VA 22032-2236; (703) 425-5111 Dr. Frederick M. Mako, Principal Investigator Dr. Frederick M. Mako, Business Official DOE Grant No. DE-FG02-97ER82374 Amount: $75,000 High-current pulses of electrons are widely used in injector systems for electron accelerators, such as industrial linacs, as well ...
SBIR Phase I 1997 Department of Energy -
A High-Charge Electron Gun for Dielectric Type Wake-Field Accelerators
SBC: Fm Technologies Inc Topic: N/A149 A High-Charge Electron Gun for Dielectric Type Wake-Field Accelerators--FM Technologies, Inc., 10529-B Braddock Road, Fairfax, VA 22032-2236; (703) 425-5111 Dr. Frederick M. Mako, Principal Investigator Dr. Frederick M. Mako, Business Official DOE Grant No. DE-FG02-97ER82375 Amount: $75,000 The development of high-current, short-duration pulses of electrons used in injectors of particle a ...
SBIR Phase I 1997 Department of Energy -
A Low Cost Acoustic Property Sensor for Measuring Natural Gas Composition in Liquid Natural Gas (LNG) Powered Vehicles
SBC: Commercial Electronics, Inc. Topic: N/A86 A Low Cost Acoustic Property Sensor for Measuring Natural Gas Composition in Liquid Natural Gas (LNG) Powered Vehicles--Commercial Electronics, Inc., 801 North 15th Street, Broken Arrow, OK 74012-2838; (918) 251-0925 Mr. Scott Phillips, Principal Investigator Mr. Michael A. Phillips, Business Official DOE Grant No. DE-FG03-97ER82353 Amount: $75,000 Among the various alternative fuels propos ...
SBIR Phase I 1997 Department of Energy -
Alternative Metal Forming Using Laser Engineered Net Shaping
SBC: OPTOMEC, INC. Topic: N/A50 Alternative Metal Forming Using Laser Engineered Net Shaping--Optomec Design Company, 13170 B Central Avenue SE, Suite 310, Albuquerque, NM 87123-3032; (505) 343-9139 Mr. David M. Keicher, Principal Investigator Mr. Thomas A. Swann, Business Official DOE Grant No. DE-FG03-97ER82448 Amount: $74,777 Energy intensive metal forming operations are among the most common steps in manufacturing ...
SBIR Phase I 1997 Department of Energy -
A Micro-Pulse Electron Injector
SBC: Fm Technologies Inc Topic: N/AN/A
SBIR Phase I 1996 Department of Energy -
Analysis of Accelerator Tuning Algorithms for Integration with an Automatic Planning and Control System
SBC: Vista Control Systems, Inc. Topic: N/A145 Analysis of Accelerator Tuning Algorithms for Integration with an Automatic Planning and Control System--Vista Control Systems, Inc., 134-B Eastgate Drive, Los Alamos, NM 87544-3304; (505) 662-2484 Mr. Michael Kroupa, Principal Investigator Mr. Peter N. Klout, Business Official DOE Grant No. DE-FG03-97ER82506 Amount: $74,999 Particle accelerators have moved from being strictly a research ...
SBIR Phase I 1997 Department of Energy -
An Autonomous Self-Propelled System for Hard Rock Drilling
SBC: Aps Technology, Inc. Topic: N/A40457 APS Technology Several advancements are needed to improve the efficiency and accuracy of hard rock drilling. Of particular interest are bottomhole assemblies (BHAs) which can grip the borehole wall in order to provide a platform from which torque and compressive force can be applied to the bit and the direction of drilling can be continuously monitored and controlled. This project will d ...
SBIR Phase I 1996 Department of Energy