You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. VIBRATOR

    SBC: Mertz Inc.            Topic: N/A

    THIS RESEARCH WILL EXPLORE THE POSSIBILITIES AND RESULT IN THE DESIGN OF AN ACOUSTIC ENERGY GENERATOR FOR GEOPHYSICAL EXPLORATION IN INACCESSIBLE MOUNTAINOUS TERRAIN. THIS EFFORT WILL DETERMINE THE MAGNITUDE OF ACOUSTIC SIGNAL REQUIRED AND WILL DEVELOP A TECHNIQUE FOR COUPLING THE SIGNAL GENERATOR TO THE EARTH. THE COUPLING TECHNIQUE WILL EXAMINE FORCES OTHER THAN GRAVITY TO ENSURE THAT THE SIGNAL ...

    SBIR Phase I 1983 Department of Energy
  2. Variable Capacity Duct System using Sleeve Bladders to Reduce Duct Volume

    SBC: Variduct, Inc.            Topic: N/A

    70775 Variable and two speed central heat and air conditioning systems, now on the market, can save energy by matching their operating speed more closely to the heating or cooling demand on a structure. However, current installation practices necessitate installing a duct system large enough to handle the (often infrequent) maximum air output of this equipment. At the more typical lower ...

    SBIR Phase I 2002 Department of Energy
  3. Ultra-Lightweight Carbon-Carbon Cooling Structure For Pixel and Silicon Strip Detectors

    SBC: HYTEC, INC.            Topic: N/A

    180 Ultra-Lightweight Carbon-Carbon Cooling Structure For Pixel and Silicon Strip Detectors-HYTEC, Inc., 110 Eastgate Dr., Suite 100, Los Alamos, NM 87544-3304; (505) 662-0080 Mr. William O. Miller, Principal Investigator Mr. William O. Miller, Business Official DOE Grant No. DE-FG03-97ER82397 Amount: $75,000 Removal of heat from the next generation of particle detection systems used in high ...

    SBIR Phase I 1997 Department of Energy
  4. Ultrafast Polysilylene Scintillators

    SBC: Adherent Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  5. Two-Step Target for Fission Product Radioactive Beam Production

    SBC: TECHSOURCE INC            Topic: N/A

    65480 The production of intense fission product radioactive beams used for nuclear physics research requires special target approaches. One such approach is that of a two-step target, in which an energetic, intense light-ion beam strikes a cooled heavy metal target to create neutrons, and the neutrons cause fissions in a surrounding blanket to make the fission products. However, such a targ ...

    SBIR Phase I 2002 Department of Energy
  6. THE PERIPHERAL COMPONENT INTERCONNECTION/SCALABLE COHERENT INTERFACE BRIDGE FOR DATA ACQUISITION AND COMPUTATION APPLICATIONS

    SBC: BI RA SYSTEMS, INC            Topic: N/A

    COALESCING THE FRAGMENTED INFORMATION ASSOCIATED WITH EACH EVENT OF A HIGH-ENERGY PHYSICS DETECTOR AND THEN PROCESSING IT AT THE RATES DEMANDED BY ACCELERATOR SYSTEMS ARE AMONG THE LARGEST CHALLENGES IN THE PHYSICS COMMUNITY. NEW DETECTOR SYSTEMS CONTINUE TO INCREASE THE NUMBER OF MEASURED PARAMETERS AND SIMULTANEOUSLY INCREASE THE RESOLUTION OF DETECTOR COMPONENTS SO THAT THE VOLUME OF GENRATED ...

    SBIR Phase I 1994 Department of Energy
  7. THE MAJOR LIMITING RELIABILITY COMPONENT OF CRYOGENIC SYSTEMS HAS ALWAYS BEEN SEALS.

    SBC: Facility & Manufacturing            Topic: N/A

    THE MAJOR LIMITING RELIABILITY COMPONENT OF CRYOGENIC SYSTEMS HAS ALWAYS BEEN SEALS. BESIDES CONTRIBUTING TO GAS CONTAMINATION AND DEBRIS PARTICLE ACCUMULATION, SEALS HAVE PHYSICALLY FAILED; AS A RESULT, SEALS HAVE BEEN RESPONSIBLE FOR THE MAJORITY OF FAILURES OCCURRING IN CRYOGENIC LIQUIFICATION AND REFRIGERATION SYSTEMS. A POTENTIALLY VIABLE SOLUTION IS THE DEVELOPMENT OF LONG-LIFE CRYOGENIC SEA ...

    SBIR Phase I 1983 Department of Energy
  8. The Commercial Viability of Excavator: A Software Tool for Gene Expression Data Clustering

    SBC: Apocom, Inc.            Topic: N/A

    70677 The use of microarrays is rapidly expanding as a tool to support gene functionality and expression studies. However, these microarrays, which can now accommodate tens of thousands of genes in a single experiment, are spewing out a tidal wave of data that is causing a bottleneck to progress in biomedicine. The development of software tools and algorithms for mining these valuable data i ...

    SBIR Phase I 2002 Department of Energy
  9. Template-Medicated Synthesis of Periodic Membranes for Improved Liquid-Phase Separations

    SBC: American Research Corporation of Virginia            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  10. Sol-Gel Derived Neutron Detector Using a Lithiated Glass

    SBC: Neutron Sciences, Inc.            Topic: N/A

    65837 The efficient detection of neutrons over a large area of several square meters is required to allow the goals of the Spallation Neutron Source (SNS) to be achieved. This project will develop a large area, position-sensitive neutron detector for the SNS, based upon manufacturing a solid film that contains both scintillating and neutron absorbing material. In Phase I, two organic and e ...

    SBIR Phase I 2002 Department of Energy
US Flag An Official Website of the United States Government