You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Treatment of Produced Water from Coal-Bed Methane Production Using Carbon Aerogel Technology

    SBC: Bpf, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Environmental Protection Agency
  2. Silica Materials for Mercury Recovery From Wastewater

    SBC: TPL, INC            Topic: N/A

    A number of industrial processes generate wastewater with mercury contamination. Existing cleanup processes have difficulties in achieving low mercury discharge limits, especially in the presence of competing metal ions already below their discharge limits. Commercial ion exchange media are not selective for mercury, so other metal ions compete with mercury for binding sites. Consequently, excess ...

    SBIR Phase I 1997 Environmental Protection Agency
  3. Self Contained Electrochemical System for Treating Paint Residue

    SBC: LYNNTECH INC.            Topic: N/A

    N/A

    SBIR Phase I 1996 Environmental Protection Agency
  4. ROBOTICS APPLICATION FOR EXPOSURE REDUCTION

    SBC: Remotec Inc.            Topic: N/A

    N/A

    SBIR Phase I 1983 Nuclear Regulatory Commission
  5. Portable Trace Metal Detection System Based on Disposable Multi-Element Nanoband Electrode Sensors

    SBC: EDTEK, INC.            Topic: N/A

    This Phase I project involves the development of a portable system for the analysis of trace metals in aqueous solutions based on an innovative disposable multi-element nanoband electrode sensor. The system will be capable of real-time detection of a variety of heavy metals in aqueous solutions, including Zn, Cd, Pb, Cr, Cu, and Hg with a 100 ppb detection limit. The system also will be capable ...

    SBIR Phase I 1997 Environmental Protection Agency
  6. Phosphate- Induced Metal Stabilzation

    SBC: Nw Environmen Services Testing            Topic: N/A

    N/A

    SBIR Phase I 1996 Environmental Protection Agency
  7. Novel Field Deployable Electrochemical Sensor for the Detection and Long-Term Monitoring of Pollutants

    SBC: LYNNTECH INC.            Topic: N/A

    Chlorinated hydrocarbons represent the most prevalent contaminants of groundwater in the country. When released in the subsurface, they tend to persist below the water table, and it can take decades or centuries before slow-moving groundwater completely dissolves accumulations of chlorinated solvent product. Analytical methods currently available for monitoring these compounds require extensive ...

    SBIR Phase I 1997 Environmental Protection Agency
  8. Novel Fiber Optic Biosensor for Pesticide Residue Detection

    SBC: LUNA INNOVATIONS INCORPORATED            Topic: N/A

    N/A

    SBIR Phase I 1996 Environmental Protection Agency
  9. NEW SENSOR FOR MEASUREMENT OF AIR MOVEMENT

    SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION            Topic: N/A

    THIS PROPOSAL IS PREPARED IN DIRECT RESPONSE TO THE NRC'S SOLICITATION FOR AN IMPROVED DEVICE TO MEASURE AIR MOVEMENT FOR PERSONNEL RADIATION PROTECTION AND HEALTH PHYSICS APPLICATIONS IN NUCLEAR FACILITIES. THE PURPOSE OF THE NEW DEVICE IS TO PROPERLY LOCATE AIR SAMPLERS SO THAT THE AIR SAMPLED IS REPRESENTATIVE OF THE AIR INHALED BY WORKERS. ALTHOUGH AIR FLOW RATE SENSORS SUCH AS ANEMOMETERS ARE ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  10. N/A

    SBC: STARFIRE ENGINEERING INC.            Topic: N/A

    WHEN IT IS NECESSARY TO RAISE A MARINE PIPELINE FOR REPAIR DUE TO TRAWLER SNAG, ETC., THE PIPELINE WILL BUCKLE, AND THEN THE BUCKLE WILL PROPAGATE IF ALL CONDITIONS ARE NOT PROPER. WITH SEVERE BUCKLES, THE PIPE WILL BREAK OPEN ALLOWING THE OIL TO SPILL. THIS CAN BE MINIMIZED BY PERIODICALLY PLACING REMOTELY OPERABLE VALVES IN THE LINE FOR CUTOFF. BUT SOMETIMES THE PIPELINE ROTATES AS IT IS BEING L ...

    SBIR Phase I 1983 Department of the Interior
US Flag An Official Website of the United States Government