You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
STUDY ON AVAILABILITY AND COMPOSITION OF METAL BEARING WASTES
SBC: N.h. Parker, P.e. And Topic: N/AN/A
SBIR Phase I 1983 Nuclear Regulatory Commission -
SMART WATER-REACTIVE GROUTS FOR UNDERGROUND ENTOMBMENT FACILITIES
SBC: Guyer Santin, Inc. Topic: N/ATHIS PROPOSAL IS TO ADDRESS THE FEASIBILITY OF WATER-REACTIVE GROUTS AS A "SMART" MATERIAL CAPABLE OF BEING PLACED DURING CONSTRUCTION BUT NOT ACTIVATED UNTIL A THREAT EVENT OCCURS WHICH DEGRADES THE ORIGINAL WATERTIGHT INTEGRITY. WHEN SUCH DEGRADATION OCCURS, IT WILL EXPOSE THE WATER-REACTIVE GROUT TO GROUNDWATER. THIS WILL TRIGGER THE HARDENING PROCESS WHICH WILL AUTOMATICALLY AFFECT A EAL AT TH ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
SEISMIC PRA
SBC: Future Resources Associate Inc Topic: N/AN/A
SBIR Phase I 1983 Nuclear Regulatory Commission -
ROBOTICS APPLICATION FOR EXPOSURE REDUCTION
SBC: Remotec Inc. Topic: N/AN/A
SBIR Phase I 1983 Nuclear Regulatory Commission -
PRESSURIZED WATER REACTOR TRANSIENT ANALYSIS MODEL
SBC: Levy S Inc Topic: N/AN/A
SBIR Phase I 1983 Nuclear Regulatory Commission -
NEW SENSOR FOR MEASUREMENT OF AIR MOVEMENT
SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION Topic: N/ATHIS PROPOSAL IS PREPARED IN DIRECT RESPONSE TO THE NRC'S SOLICITATION FOR AN IMPROVED DEVICE TO MEASURE AIR MOVEMENT FOR PERSONNEL RADIATION PROTECTION AND HEALTH PHYSICS APPLICATIONS IN NUCLEAR FACILITIES. THE PURPOSE OF THE NEW DEVICE IS TO PROPERLY LOCATE AIR SAMPLERS SO THAT THE AIR SAMPLED IS REPRESENTATIVE OF THE AIR INHALED BY WORKERS. ALTHOUGH AIR FLOW RATE SENSORS SUCH AS ANEMOMETERS ARE ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
N/A
SBC: STARFIRE ENGINEERING INC. Topic: N/AWHEN IT IS NECESSARY TO RAISE A MARINE PIPELINE FOR REPAIR DUE TO TRAWLER SNAG, ETC., THE PIPELINE WILL BUCKLE, AND THEN THE BUCKLE WILL PROPAGATE IF ALL CONDITIONS ARE NOT PROPER. WITH SEVERE BUCKLES, THE PIPE WILL BREAK OPEN ALLOWING THE OIL TO SPILL. THIS CAN BE MINIMIZED BY PERIODICALLY PLACING REMOTELY OPERABLE VALVES IN THE LINE FOR CUTOFF. BUT SOMETIMES THE PIPELINE ROTATES AS IT IS BEING L ...
SBIR Phase I 1983 Department of the Interior -
N/A
SBC: TRADCO CHEMICAL CORPON Topic: N/AUSING RADIO TELEMETRY MODEMS, IS CURRENTLY POSSIBLE. THIS IS NECESSARY BECAUSE LACK OF MONITORING CAUSES INADEQUATE CONTROL OF INTERNAL CORROSION TAKING PLACE INSIDE OFFSHORE PIPELINE SYSTEMS. THE NET RESULT IS PIPELINE FAILURE DUE TOTHE EFFECTS OF CORROSION. THE RESULT OF PIPELINE FAILURE WILL BE AN OIL SPILL IN COASTAL WATERS. AS THE NATION'S OFFSHORE PIPELINE SYSTEM GROWS OLDER, THE NET EFFECTS ...
SBIR Phase I 1983 Department of the Interior -
MEASUREMENT BASED DEPENDABILITY ANALYSIS FOR DIGITAL SYSTEMS
SBC: SOHAR, INC. Topic: N/AN/A
SBIR Phase I 1994 Nuclear Regulatory Commission -
EXPERIMENTAL EVALUATION OF FIBER OPTIC PRESSURE SENSORS FOR NUCLEAR POWER PLANTS
SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION Topic: N/AN/A
SBIR Phase I 1994 Nuclear Regulatory Commission