You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ROBUST, ACCURATE, NON-CONTACTING VIBRATION MEASUREMENT SYSTEM

    SBC: EPOCH ENGINEERING, INC.            Topic: N/A

    WHEN ROTATING MACHINERY DETERIORATES, VIBRTION PATTERSN CHANGE. WHEN BEARING FREQUENCIES APPEAR, THEN INCREASE IN AMPLITUDE, BEARING FAILURE LOOMS. THE SAME WITH VALVES; WHEN THEY LEAK, THEY VIBRATE. AS LEAKAGE INCREASES, THE VIBRATION PATTERN CHANGES. THERE ARE MANY OTHERS. THE KEY IS KNOWING WHERE AND HOW DEEPLY TO LOOK. THE KEY IN OLDER REACTOR PLANTS IS TO UNOBTRUSIVELY, ECONOMICALLY BACKFIT S ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  2. ROBOTICS APPLICATION FOR EXPOSURE REDUCTION

    SBC: Remotec Inc.            Topic: N/A

    N/A

    SBIR Phase I 1983 Nuclear Regulatory Commission
  3. NEW SENSOR FOR MEASUREMENT OF AIR MOVEMENT

    SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION            Topic: N/A

    THIS PROPOSAL IS PREPARED IN DIRECT RESPONSE TO THE NRC'S SOLICITATION FOR AN IMPROVED DEVICE TO MEASURE AIR MOVEMENT FOR PERSONNEL RADIATION PROTECTION AND HEALTH PHYSICS APPLICATIONS IN NUCLEAR FACILITIES. THE PURPOSE OF THE NEW DEVICE IS TO PROPERLY LOCATE AIR SAMPLERS SO THAT THE AIR SAMPLED IS REPRESENTATIVE OF THE AIR INHALED BY WORKERS. ALTHOUGH AIR FLOW RATE SENSORS SUCH AS ANEMOMETERS ARE ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  4. N/A

    SBC: STARFIRE ENGINEERING INC.            Topic: N/A

    WHEN IT IS NECESSARY TO RAISE A MARINE PIPELINE FOR REPAIR DUE TO TRAWLER SNAG, ETC., THE PIPELINE WILL BUCKLE, AND THEN THE BUCKLE WILL PROPAGATE IF ALL CONDITIONS ARE NOT PROPER. WITH SEVERE BUCKLES, THE PIPE WILL BREAK OPEN ALLOWING THE OIL TO SPILL. THIS CAN BE MINIMIZED BY PERIODICALLY PLACING REMOTELY OPERABLE VALVES IN THE LINE FOR CUTOFF. BUT SOMETIMES THE PIPELINE ROTATES AS IT IS BEING L ...

    SBIR Phase I 1983 Department of the Interior
  5. N/A

    SBC: TRADCO CHEMICAL CORPON            Topic: N/A

    USING RADIO TELEMETRY MODEMS, IS CURRENTLY POSSIBLE. THIS IS NECESSARY BECAUSE LACK OF MONITORING CAUSES INADEQUATE CONTROL OF INTERNAL CORROSION TAKING PLACE INSIDE OFFSHORE PIPELINE SYSTEMS. THE NET RESULT IS PIPELINE FAILURE DUE TOTHE EFFECTS OF CORROSION. THE RESULT OF PIPELINE FAILURE WILL BE AN OIL SPILL IN COASTAL WATERS. AS THE NATION'S OFFSHORE PIPELINE SYSTEM GROWS OLDER, THE NET EFFECTS ...

    SBIR Phase I 1983 Department of the Interior
  6. FOLLOWING A POST-IRRADIATION THERMAL ANNEAL CYCLE

    SBC: Materials Engineering &            Topic: N/A

    THIS RESEARCH WILL DETERMINE THE CHARACTERISTICS OF FATIGUE INITIATION LIFE, FATIGUE CRACK GROWTH RATES, AND SLOW-STABLECRACK EXTENSIONS FOLLOWING A POST-IRRADIATION ANNEAL. FATIGUE INTITIATION LIFE WILL BE DETERMINED WITH SMOOTH SPECIMENS OF 308 STAINLESS STEEL WHICH HAVE BEEN ANNEALED AND THEN CYCLED IN PRESSURIZED, HIGH-TEMPERATURE WATER. SUBMERGED ARC WELD STEEL (LINDE 80 FLUX) WILL BE PARTIAL ...

    SBIR Phase I 1983 Nuclear Regulatory Commission
  7. EXPERIMENTAL EVALUATION OF FIBER OPTIC PRESSURE SENSORS FOR NUCLEAR POWER PLANTS

    SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  8. ENHANCED SIMULATOR TRAINING PROGRAM FOR OPERATORS AT MULTI-UNIT PLANTS.

    SBC: Corpe Corp.            Topic: N/A

    AT MULTI-UNIT NUCLEAR GENRATING STATIONS, CONTROL ROOM OPERATORS ARE GENERALLY LICENSED TO OPERATE ALL SIMILAR UNITS. SIMULATOR TRAINING CONDUCTED AT THE LICENSEE TRAINING FACILITY OCCURS ON ONE SIMULATOR WHICH MAY NOT EXACTLY MIMIC ANY UNIT. INADEQUATE TRAINING ON UNIT-TO-UNIT AND UNIT-TO-SIMULATOR DIFFERENCES, IN CONJUNCTION WITH LIMITED PER-PERSON SIMULATOR TRAINING HOURS, CAN RESULT IN INCREAS ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  9. DEVELOPMENT OF IMPROVED TECHNIQUES FOR DYNAMIC PRA

    SBC: Frh, Inc.            Topic: N/A

    CHANGES IN PLANT STATUS, EITHER BEFORE OR DURING AN ACCIDENT SEQUENC CAN CONSIDERABLY AFFECT ITS OUTCOME; BOTH THE ACTURAL OUTCOME AND THAT PREDICTED BY PROBABILISTIC RISK ASSESSMENT. IN ORDER TO ACCURATELY REPRESENT THE POSSIBLE ACCIDENTS AND THEIR PROBABILITIES, THE PRA MODEL MUST CONSIDER THE DYNAMIC CHARACTER OF THE PLANT, IT'S SYSTEMS AND OPERATORS. A LIVING, DYNAMIC PRA IS ONE IN WHICH ALL T ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  10. COMMON CAUSE FAILURE ANALYSIS (CCFA) IS AN IMPORTANT ELEMENTOF A COMPLETE PROBABILISTIC RISK ASSESSMENT (PRA) SINCE COMMON CAUSE FAILURE IS OFTEN A DOMINANT FACTOR IN THE RISK POSED TO PUBLIC HEALTH AND SAFETY FROM NUCLEAR POWER PLANT ACCIDENTS.

    SBC: Jfb Associates Inc.            Topic: N/A

    COMMON CAUSE FAILURE ANALYSIS (CCFA) IS AN IMPORTANT ELEMENTOF A COMPLETE PROBABILISTIC RISK ASSESSMENT (PRA) SINCE COMMON CAUSE FAILURE IS OFTEN A DOMINANT FACTOR IN THE RISK POSED TO PUBLIC HEALTH AND SAFETY FROM NUCLEAR POWER PLANT ACCIDENTS. A MAJOR PROBLEM ASSOCIATED WITH PERFORMING A CFFA IS THE ABSENCE OF SUPPORTING QUALITATIVE OR QUANTITATIVE COMPONENT FAILURE DATA. EXTENSIVE AMOUNTS OF CO ...

    SBIR Phase I 1983 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government