You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. VIBRATOR

    SBC: Mertz Inc.            Topic: N/A

    THIS RESEARCH WILL EXPLORE THE POSSIBILITIES AND RESULT IN THE DESIGN OF AN ACOUSTIC ENERGY GENERATOR FOR GEOPHYSICAL EXPLORATION IN INACCESSIBLE MOUNTAINOUS TERRAIN. THIS EFFORT WILL DETERMINE THE MAGNITUDE OF ACOUSTIC SIGNAL REQUIRED AND WILL DEVELOP A TECHNIQUE FOR COUPLING THE SIGNAL GENERATOR TO THE EARTH. THE COUPLING TECHNIQUE WILL EXAMINE FORCES OTHER THAN GRAVITY TO ENSURE THAT THE SIGNAL ...

    SBIR Phase I 1983 Department of Energy
  2. USE AS ION-EXCHANGE MEMBRANES AND BATTERY SEPARATORS

    SBC: Exfluor Research Corporation            Topic: N/A

    EXFLUOR RESEARCH CORPORATION ALONG WITH PROFESSOR RICHARD J. LAGOW AT THE UNIVERSITY OF TEXAS AT AUSTIN HAVE DEVELOPED A NEW SYNTHETIC METHOD FOR PREPARING FLUOROCARBON MEMBRANE MATERIAL. THE PROCEDURE CONSISTS OF FIRST SYNTHESIZING A HYDROCARBON PRECURSOR, INTRODUCING CROSS-LINKS AND THEN FLUORINATING WITH ELEMENTAL FLUORINE. THIS METHOD PERMITS WIDE FLEXIBILITY IN THE STRUCTURAL FEATURES OF THE ...

    SBIR Phase I 1984 Department of Energy
  3. URANIUM HEXAFLUORIDE IS THE WORKING FLUID IN THE GAS CENTRIFUGE.

    SBC: Comstock Inc            Topic: N/A

    URANIUM HEXAFLUORIDE IS THE WORKING FLUID IN THE GAS CENTRIFUGE. A NEED EXISTS FOR UF6 ASSAY DETERMINATION IN A FULLY AUTOMATED SYSTEM IN REAL-TIME. THIS PROJECT ADDRESSES THE CONCEPTUAL DEVELOPMENT OF A NEW ION TRAP TIME-OF-FLIGHT METHOD FOR MONITORING THE RELATIVE PROPORTIONS OF CLOSELY SPACED ION MASSES. IT IS DIRECTLY APPLICABLE TO THE ASSAY OF U235/U238 RATIOS IN THE UF6 GAS STREAM IN REAL-TI ...

    SBIR Phase I 1984 Department of Energy
  4. Ultra-Lightweight Carbon-Carbon Cooling Structure For Pixel and Silicon Strip Detectors

    SBC: HYTEC, INC.            Topic: N/A

    180 Ultra-Lightweight Carbon-Carbon Cooling Structure For Pixel and Silicon Strip Detectors-HYTEC, Inc., 110 Eastgate Dr., Suite 100, Los Alamos, NM 87544-3304; (505) 662-0080 Mr. William O. Miller, Principal Investigator Mr. William O. Miller, Business Official DOE Grant No. DE-FG03-97ER82397 Amount: $75,000 Removal of heat from the next generation of particle detection systems used in high ...

    SBIR Phase I 1997 Department of Energy
  5. Ultrafast Polysilylene Scintillators

    SBC: Adherent Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  6. TWO LINEAR FRESNEL LENS PHOTOVOLTAIC CONCENTRATOR DESIGN INNOVATIONS: A PRISMATIC CELL COVER AND A COPPER HEAT SPREADER

    SBC: ENTECH, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of Energy
  7. THE PERIPHERAL COMPONENT INTERCONNECTION/SCALABLE COHERENT INTERFACE BRIDGE FOR DATA ACQUISITION AND COMPUTATION APPLICATIONS

    SBC: BI RA SYSTEMS, INC            Topic: N/A

    COALESCING THE FRAGMENTED INFORMATION ASSOCIATED WITH EACH EVENT OF A HIGH-ENERGY PHYSICS DETECTOR AND THEN PROCESSING IT AT THE RATES DEMANDED BY ACCELERATOR SYSTEMS ARE AMONG THE LARGEST CHALLENGES IN THE PHYSICS COMMUNITY. NEW DETECTOR SYSTEMS CONTINUE TO INCREASE THE NUMBER OF MEASURED PARAMETERS AND SIMULTANEOUSLY INCREASE THE RESOLUTION OF DETECTOR COMPONENTS SO THAT THE VOLUME OF GENRATED ...

    SBIR Phase I 1994 Department of Energy
  8. THE MAJOR LIMITING RELIABILITY COMPONENT OF CRYOGENIC SYSTEMS HAS ALWAYS BEEN SEALS.

    SBC: Facility & Manufacturing            Topic: N/A

    THE MAJOR LIMITING RELIABILITY COMPONENT OF CRYOGENIC SYSTEMS HAS ALWAYS BEEN SEALS. BESIDES CONTRIBUTING TO GAS CONTAMINATION AND DEBRIS PARTICLE ACCUMULATION, SEALS HAVE PHYSICALLY FAILED; AS A RESULT, SEALS HAVE BEEN RESPONSIBLE FOR THE MAJORITY OF FAILURES OCCURRING IN CRYOGENIC LIQUIFICATION AND REFRIGERATION SYSTEMS. A POTENTIALLY VIABLE SOLUTION IS THE DEVELOPMENT OF LONG-LIFE CRYOGENIC SEA ...

    SBIR Phase I 1983 Department of Energy
  9. The LAMMPS Instrument for Materials Science

    SBC: CreativeC LLC            Topic: 02a

    CreativeC LLC is a small New Mexico business, based in Albuquerque. The company’s mission is to “facilitate science and engineering by computing faster”; its vision is to spearhead the “democratization of High Performance Computing (HPC)” by adapting cutting-edge disruptive computing technologies to office, workgroup, and laboratory environments via the creation of specialized (fit-to-pu ...

    SBIR Phase I 2016 Department of Energy
  10. Template-Medicated Synthesis of Periodic Membranes for Improved Liquid-Phase Separations

    SBC: American Research Corporation of Virginia            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
US Flag An Official Website of the United States Government