You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Abductive Power System Control and Diagnostics

    SBC: ABTECH CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1994 National Aeronautics and Space Administration
  2. A COMPACT, PLANETARY GEAR TRANSMISSION DESIGN WITH LOW WEIGHT-TO-HORSEPOWER RATIO MADE POSSIBLE THROUGH HIGH ENERGY CLUTCH ASSEMBLIES, HAS LOW IMPEDANCE FLOW CHANNELS WHICH FACILITATE RAPID CIRCULATION OF COOLING FLUID TO TRANSPORT HEAT AWAY FROM

    SBC: Rai Associates            Topic: N/A

    A COMPACT, PLANETARY GEAR TRANSMISSION DESIGN WITH LOW WEIGHT-TO-HORSEPOWER RATIO MADE POSSIBLE THROUGH HIGH ENERGY CLUTCH ASSEMBLIES, HAS LOW IMPEDANCE FLOW CHANNELS WHICH FACILITATE RAPID CIRCULATION OF COOLING FLUID TO TRANSPORT HEAT AWAY FROM FRICTION SURFACES. SURROUNDING THE CLUTCH ASSEMBLIES IS A HEAT EXCHANGER TO TRANSFER HEAT DIRECTLY TO THE ATMOSPHERE. DURING OPERATION OF THE CLUTCHES, H ...

    SBIR Phase I 1984 National Aeronautics and Space Administration
  3. Active Rain-Radar Calibrator for Tropical Rainfall Measuring Mission

    SBC: CENTER FOR REMOTE SENSING, INC.            Topic: N/A

    We propose to design a state-of-the-art active radar calibrator which will be used for absolute calibration of the TRMM Rain Radar. During Phase I, we investigate several architectures and perform design evaluations with the ultimate objective of designing an improved radar calibrator with unprecedented accuracy and stability, yet optimized for cost and complexity. The active calibrator will be op ...

    SBIR Phase I 1994 National Aeronautics and Space Administration
  4. Active Suppression of Resonance Interactions between Shear-Layers and Cavities

    SBC: High Technology Corporation            Topic: N/A

    N/A

    SBIR Phase I 1994 National Aeronautics and Space Administration
  5. Adaptive Control Of Air Turbo Ramjet

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1997 National Aeronautics and Space Administration
  6. Advanced High-Lift Systems To Enhance Performance And Utility Of Existing And New Ga Aircraft

    SBC: Innovative Aerodynamic            Topic: N/A

    N/A

    SBIR Phase I 1997 National Aeronautics and Space Administration
  7. ADVANCED MOLYBDATE CONVERSION COATINGS FOR ALUMINUM AND ITS ALLOYS

    SBC: LYNNTECH INC.            Topic: N/A

    N/A

    SBIR Phase I 1996 National Aeronautics and Space Administration
  8. A Flight Rated Time Of Flight Mass Spectrometer With 10(-15) Torr Sensitivity For Insitu Thin Film Process Control

    SBC: IONWERKS INC            Topic: N/A

    N/A

    SBIR Phase I 1997 National Aeronautics and Space Administration
  9. A FLOATING-POINT COMPUTER MODULE FOR ARRAY PROCESSING ON A FLEX/32 MULTICOMPUTER

    SBC: Flexible Computer Corp.            Topic: N/A

    N/A

    SBIR Phase I 1984 National Aeronautics and Space Administration
  10. A High Efficiency Reactor For Biological Waste Water Processing

    SBC: LYNNTECH INC.            Topic: N/A

    N/A

    SBIR Phase I 1997 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government