You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Inservice Diagnostics of Motor Operated Valves

    SBC: ACENTECH INCORPORATED            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  2. NEW SENSOR FOR MEASUREMENT OF AIR MOVEMENT

    SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION            Topic: N/A

    THIS PROPOSAL IS PREPARED IN DIRECT RESPONSE TO THE NRC'S SOLICITATION FOR AN IMPROVED DEVICE TO MEASURE AIR MOVEMENT FOR PERSONNEL RADIATION PROTECTION AND HEALTH PHYSICS APPLICATIONS IN NUCLEAR FACILITIES. THE PURPOSE OF THE NEW DEVICE IS TO PROPERLY LOCATE AIR SAMPLERS SO THAT THE AIR SAMPLED IS REPRESENTATIVE OF THE AIR INHALED BY WORKERS. ALTHOUGH AIR FLOW RATE SENSORS SUCH AS ANEMOMETERS ARE ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  3. EXPERIMENTAL EVALUATION OF FIBER OPTIC PRESSURE SENSORS FOR NUCLEAR POWER PLANTS

    SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  4. A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS

    SBC: TPL, INC            Topic: N/A

    THE DIFFICULTY IN PREDICTING STRUCTURAL DEGRADATION RATES FOR NUCLEAR POWER PLANT COMPONENTS DUE TO CORROSION AND OTHER FACTORS HAS LED TO THE NEED FOR COSTLY, TIME CONSUMING INSPECTIONS AND INCREASED COST FROM INTENTIONALLY OVERDESIGNED COMPONENTS. THE SITUATION INDICATES A SERIOUS, UNMET NEED FOR A SIMPLE BUT ACCURATE SYSTEM FOR REAL- TIME, IN SITU, NONDESTRUCTIVE ANALYSIS OF NUCLEAR POWER PLANT ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
  5. WORK UNDERLOAD IN MODERN NPP CIBTRIK ROOMS

    SBC: UES INC            Topic: N/A

    THE PROBLEM ADDRESSED IS THAT FUTURE NUCLEAR POWER PLANT CONTROL ROOM OPERATOR WORKLOAD WILL CONSIST PRIMARILY OF PASSIVE MONITORING FOR EXTENDED PERIODS OF TIME. THIS WILL RESULT IN DIFFICULTY MAINTAINING OPERATOR ALERTNESS AND PERFORMANCE CAPABILITY. THE TWO OBJECTIVES OF THIS PROJECT ARE TO PROVIDE THE CAPABILITY TO PREDICT AND EVALUATE THE EFFECT OF WORK UNDERLOADON HUMAN PERFORMANCE IN NPP CO ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
  6. AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER

    SBC: W Peter Trower Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  7. ROBOTICS APPLICATION FOR EXPOSURE REDUCTION

    SBC: Remotec Inc.            Topic: N/A

    THE PURPOSE OF THIS PROJECT IS TO ASSESS THE STATE-OF-THE ART OF COMPUTERIZED ROBOTS TO DETERMINE WHETHER COST/ BENEFICIAL APPLICATIONS CAN BE MADE IN NUCLEAR PLANT MAINTENANCE AND IF SUCH APPLICATIONS ARE POSSIBLE, TO DEVELOP A PLAN TO SUBSTANTIATE THE COST/BENEFIT ANALYSIS AND TO IDENTIFY THE FACTORS, IF ANY, WHICH WOULD INHIBIT NEAR-TERM ADAPTION OF ROBOT TECHNOLOGY IN NUCLEAR PLANT MAINTENANCE ...

    SBIR Phase II 1984 Nuclear Regulatory Commission
  8. INSTRUMENTS BASED ON THE SEEBECK EFFECT HAVE BEEN USED SUCCESSFULLY IN EUROPE AND THE UNITED STATES TO IDENTIFY ALLOYS THAT HAVE BEEN HARDENED BY HEAT TREATMENT OR COLD WORKING.

    SBC: Salvonics Inc.            Topic: N/A

    INSTRUMENTS BASED ON THE SEEBECK EFFECT HAVE BEEN USED SUCCESSFULLY IN EUROPE AND THE UNITED STATES TO IDENTIFY ALLOYS THAT HAVE BEEN HARDENED BY HEAT TREATMENT OR COLD WORKING. BECAUSE THE RESULTS OF RADIATION DAMAGE, INCREASED YIELD STRENGTH AND DECREASED TOUGHNESS ARE SIMILAR, AN INVESTIGATION IS PROPOSED TO EXAMINE THE FEASIBILITY OF USING THE SEEBECK EFFECT IN THE ASSESSMENT OF RADIATION DAMA ...

    SBIR Phase I 1984 Nuclear Regulatory Commission
  9. OF REACTOR THERMAL-HYDRAULICS CODES.

    SBC: International Energy            Topic: N/A

    OF REACTOR THERMAL-HYDRAULICS CODES. THESE CODES HAVE INTERNATIONAL APPLICABILITY. TRADING THESE CODES, WITH APPROPRIATE SUPPORT, TO OTHER COUNTRIES IN EXCHANGE FOR USEFUL DATA OR OTHER RESOURCES WOULD ENHANCE THEIR UTILITY AND REDUCE THE COST TO THE U.S. OF GENERATING EQUIVALENT DATA. THE OBJECTIVE OF THE PROPOSED EFFORT IS TO PROVIDE A SOUND TECHNICAL BASIS FOR SUCH AN EXCHANGE BY: IDENTIFYING C ...

    SBIR Phase I 1983 Nuclear Regulatory Commission
  10. COMMON CAUSE FAILURE ANALYSIS (CCFA) IS AN IMPORTANT ELEMENTOF A COMPLETE PROBABILISTIC RISK ASSESSMENT (PRA) SINCE COMMON CAUSE FAILURE IS OFTEN A DOMINANT FACTOR IN THE RISK POSED TO PUBLIC HEALTH AND SAFETY FROM NUCLEAR POWER PLANT ACCIDENTS.

    SBC: Jfb Associates Inc.            Topic: N/A

    COMMON CAUSE FAILURE ANALYSIS (CCFA) IS AN IMPORTANT ELEMENTOF A COMPLETE PROBABILISTIC RISK ASSESSMENT (PRA) SINCE COMMON CAUSE FAILURE IS OFTEN A DOMINANT FACTOR IN THE RISK POSED TO PUBLIC HEALTH AND SAFETY FROM NUCLEAR POWER PLANT ACCIDENTS. A MAJOR PROBLEM ASSOCIATED WITH PERFORMING A CFFA IS THE ABSENCE OF SUPPORTING QUALITATIVE OR QUANTITATIVE COMPONENT FAILURE DATA. EXTENSIVE AMOUNTS OF CO ...

    SBIR Phase I 1983 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government