You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ACOUSTIC METHODS FOR STRESS MEASUREMENTS IN STRUCTURES

    SBC: REINHART & ASSOC., INC.            Topic: N/A

    PREDICTION OF CATASTROPHIC AND COSTLY FAILURES IN STRUCTURALCOMPONENTS HAS BEEN HAMPERED BY THE INABILITY TO MEASURE STRESS LEVELS IN CRITICAL COMPONENTS WITH ACCURACY. THIS PROPOSAL DESCRIBES THE STEPS NEEDED TO DEVELOP A STRESS MEASUREMENT SYSTEM THAT RELIES ON ULTRASONIC (ACOUSTOELASTIC) WAVE MEASUREMENTS. THE RECENT ADVANCEMENTSMADE IN THE USE OF CRITICALLY REFRACTED LONGITUDINAL WAVES (CRLW), ...

    SBIR Phase I 1988 National Science Foundation
  2. ADVANCED FARE PAYMENT MEDIA

    SBC: Glh Inc            Topic: N/A

    THE SBIR PROGRAM SOLICITATION PROVIDES AN OPPORTUNITY TO DESIGN AND DEVELOP A FARE PAYMENT SYSTEM BASED ON ADVANCED FARE PAYMENT MEDIA TO MEET THE NEEDS OF TRANSIT PATRONS AND SYSTEMS IN THE 1990S. THE SOLICITATION STATED THE NEW MEDIASHOULD: BE COST EFFECTIVE, PERMIT PAYMENT OF ZONAL FARES, INCREASE FLEXIBILITY IN PAYMENT SCHEDULES AND METHODS, AND IMPROVE REVENUE SECURITY AND PROCESSING CAPABILI ...

    SBIR Phase I 1991 Department of Transportation
  3. AIRBORNE DATA LINK COCKPIT MANAGEMENT AND DISPLAY

    SBC: CARLOW INTERNATIONAL, INC.            Topic: N/A

    RESEARCH WILL BE CARRIED OUT ON INFORMATION REQUIREMENTS ANDFLIGHT CREW PERFORMANCE IN RELATION TO FUTURE DATA LINK COMMUNICATIONS (DLC) SYSTEMS. IT IS EXPECTED THAT AVAILABILITY OF CRITICAL INFORMATION IN THE COCKPIT FROM DLC SYSTEMS WILL FACILITATE IMPROVED TRANSPORTATION EFFICIENCY AND SAFETY. HOWEVER, THERE MAY BE SOME PRICE IN TERMS OF CREW WORKLOAD. TASK ANALYSIS AND HUMAN FACTORS INFORMATIO ...

    SBIR Phase I 1991 Department of Transportation
  4. A MULTIPLE INPUT 90MM SPECTROGRAPH

    SBC: Chromex Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 National Science Foundation
  5. A NEW DIFFUSING-VORTEX NUMERICAL SCHEME

    SBC: Intelligent Systems Research, Inc.            Topic: N/A

    A DIFFUSING-VORTEX METHOD, FOR SOLVING THE TWO-DIMENSIONAL INCOMPRESS NAVIER-STOKES EQUATION, WILL BE EXTENDED AND APPLIED TO THE EXTERNAL INCOMPRESSIBLE VISCOUS FLOW OVER A GENERALLY SMOOTH BLUNT BODY. THE NUMERICAL ADVANTAGES OVER OTHER LAGRANGIAN VORTEX METHODS WILL BE FURTHER DEMONSTRATEDBY REDUCING TOTAL CPU TIME AND BY AVOIDING CUT-OFF PROCEDURES. THE NEW APPROACH WHICH IS AN APPROXIMATE EXP ...

    SBIR Phase I 1988 National Science Foundation
  6. A NEW SIMULATION METHOD FOR SYSTEM DEPENDABILITY ANALYSIS

    SBC: Rainbow Analysis Systems Group            Topic: N/A

    TODAY'S COMPLEX SYSTEM ENVIRONMENT AND COMPETITIVE ECONOMIC ENVIRONMENT DEMAND PRECISE ANSWERS TO QUESTIONS CONCERNING DEPENDABILITY AND QUALITY. CURRENT TOOLS ARE NOT PROVIDING THE ABILITY TO MODEL COMPLEX FAULT HANDLING SCENARIOS AND OFTEN REQUIRE SIMPLIFYING ASSUMPTIONS ABOUT FAILURE RATES, REPAIR RATES, AND INITIAL STATES WHICH LEAD TO INCORRECT SOLUTIONS. ACCURATE DEPENDABILITY EVALUATIONS AR ...

    SBIR Phase I 1991 National Science Foundation
  7. A PC-BASED SIMULATOR WITH EXPERT SYSTEM FOR AIRSPACE DESIGN

    SBC: Wesson International Inc.            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of Transportation
  8. A Proposal to Develop the UTD Breakaway Link for Use in Utility Pole Guy Wires

    SBC: UTD, INC.            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  9. A REAL TIME SCOUR MEASUREMENT INSTRUMENT

    SBC: North American Geotechnical Company            Topic: N/A

    N/A

    SBIR Phase I 1991 National Science Foundation
  10. ARTIFICIAL INTELLIGENCE IN POWER SYSTEM VOLTAGE CONTROL

    SBC: Eec, Inc            Topic: N/A

    THE OBJECTIVE OF THIS PROPOSAL IS TO EXPLORE THE FEASIBILITY OF EXPLOITING RECENT ADVANCES IN THE UNDERSTANDING OF POWER SYSTEM VOLTAGE RELATIONSHIPS AND PHENOMENA, AND IN THE STRUCTURING AND APPLICATION OF ARTIFICIAL INTELLIGENCE METHODOLOGIES, FOR THE CONTROL OF POWER SYSTEM VOLTAGE PROFILES. SINCE THE RELATIONSHIP BETWEEN VOLTAGE CONTROL MEANS AND THEIR EFFECTS ARE PREDOMINANTLY LOCAL IN NATURE ...

    SBIR Phase I 1991 National Science Foundation
US Flag An Official Website of the United States Government