You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ASSESSMENT OF SMART SENSOR TECHNOLOGIES FOR CONVENTIONAL ANDADVANCED LWRS

    SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1991 Nuclear Regulatory Commission
  2. EFFECT OF AGING ON RESPONSE TIME OF NUCLEAR PLANT PRESSURE SENSORS

    SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  3. Nuclear Weapons Effects Phenomenology

    SBC: Applied Physics Technologies            Topic: N/A

    The nuclear weapons community has traditionally focused on the next generation or level of weapon capability complimented by gathering and analysis of actual test data. Now, with the cessation of actual weapons testing, there is an increased need to use the actual test data in modeling techniques to better understand the phenomenology and potential effects of nuclear weapons. The first phase of ...

    SBIR Phase I 1997 Department of DefenseDefense Threat Reduction Agency
  4. SUBSCALE TESTING OF ROCKBOLTED TUNNELS IN JOINTED MEDIA

    SBC: Applied Research Associates, Inc.            Topic: N/A

    DEVELOPMENT OF AN INNOVATIVE AND ECONOMICAL EXPERIMENTAL METHOD IS PROPOSED WHICH CAN PROVIDE THE BASIC BEHAVIOR DATA NECESSARY TO MEET THE DNA OBJECTIVE OF PROVIDING ADEQUATE ANALYSIS, DESIGN AND ASSESSMENT METHODS FOR MINIMALLY HARDENED TUNNELS. THIS DEVELOPMENT IS ACCOMPANIED BY ANALYSIS CAPABLE OF REPRESENTING THE COMPLEX INELASTIC MATERIAL BEHAVIOR OF THE ROCK MASS AND OF REPRESENTING SIMPLE ...

    SBIR Phase I 1988 Department of DefenseDefense Threat Reduction Agency
  5. Laser Turbulence Measurements in the LB/TS

    SBC: Applied Research Associates, Inc.            Topic: N/A

    Turbulence of gas flows by its very nature is one of the most difficult things to model and measure. We propose to develop a new way of measuring the turbulence and to compare these measurements to predictions using the k-epsilon model. Typical measurements, in the past, use smoke, Schlierin or shadow graph techniques to visually infer turbulence characteristics. These features are either motio ...

    SBIR Phase I 1997 Department of DefenseDefense Threat Reduction Agency
  6. DEVELOPMENT OF A HIGH DYNAMIC RANGE DOWNHOLE SIGNAL CONDITIONING MODULE

    SBC: Applied Research Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseDefense Threat Reduction Agency
  7. Composite Retrofit Technicques for Blast Resistance

    SBC: APTEK, Inc.            Topic: N/A

    This Small Business Innovation Research Project will determine the advantages and disad-vantages of fibrous/polymeric composite materials over traditional material (steel) for retrofitting key civilian facilities against terrorist bomb attack. Retrofit techniques we will evaluate are: strengthening fully and partially exposed columns with composite wraps or shells, masonry walls with bonded comp ...

    SBIR Phase I 1997 Department of DefenseDefense Threat Reduction Agency
  8. SENSITIVE LOW Z STRAIN GAGE

    SBC: APTEK, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseDefense Threat Reduction Agency
  9. HARDENED IMPROVED DYNAMIC RESPONSE DECOY

    SBC: APTEK, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseDefense Threat Reduction Agency
  10. UGT INSTRUMENTATION FOR ELECTRICAL PARAMETER MEASUREMENT

    SBC: APTEK, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseDefense Threat Reduction Agency
US Flag An Official Website of the United States Government