You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
GLOBAL POSITIONING SYSTEM ATTITUDE CONTROL
SBC: Adroit Systems, Inc. Topic: N/AA PROTOTYPE GUIDANCE AND CONTROL SYSTEM SENSOR FOR DIRECTED ENERGY WEAPONS IS PROPOSED. THIS GUIDANCE SUBSYSTEM SENSOR WILL USE THE GLOBAL POSITIONING SYSTEM (GPS) SATELLITE CONSTELLATION FOR BOTH POSITION AND ATTITUDE DETERMINATION OF THE DEW. THIS GPS ATTITUDE DETERMINATION SYSTEM CAN BE CAN BE APPLIED FOR POINTING AND ATTITUDE CONTROL OF MANY TYPES OF DEWS, INCLUDING GROUND, AIR, AND SPACE BASE ...
SBIR Phase I 1991 Department of DefenseMissile Defense Agency -
Ion-Implanted 2-D MESFET Technology for Wireless Communications
SBC: Advanced Device Technologies, Topic: N/AThis Phase I project has two primary objectives. The first objective is to evaluate the feasibility of a fully ion implanted fabrication process based on the heterodimensional 2-D MESFET. The new device, the 2-D JFET, will have p+ ion implanted sidegates which laterally modulate a thin, highly doped n-type conducting channel. The 2-D JFET should have excellent high speed, low power characteristics ...
SBIR Phase I 1997 Department of DefenseMissile Defense Agency -
MEASURING MAGNETIC FIELD STRUCTURE BEHIND A PROJECTILE
SBC: American Research Corporation of Virginia Topic: N/ADMS (DILUTED MAGNETIC SEMICONDUCTOR) CRYSTAL WILL MEASURE MAGNETIC FIELD STRENGTHS OF A HYPERVELOCITY GUN (HVG), WITH UNIQUELY HIGH DIRECTIVITY AND SPATIAL RESOLUTION, UNDER A HARSH ELECTRO-MAGNETIC INTERFERENCE (EMI) CONDITION. KNOWLEDGE OF THE MAGNETIC FIELD STRUCTURE BEHIND AND AHEAD OF A PROJECTILE IS ESSENTIAL FOR DESIGNING AN EFFICIENT HVG OF SDI INTEREST, ALTHOUGH EMI MAKES SUCH A MEASUREME ...
SBIR Phase I 1991 Department of DefenseMissile Defense Agency -
LASER ALLOYING OF PLASMA-DEPOSITED COATINGS FOR PROTECTION AGAINST ATOMIC OXYGEN
SBC: American Research Corporation of Virginia Topic: N/AN/A
SBIR Phase I 1988 Department of DefenseMissile Defense Agency -
ASSESSMENT OF SMART SENSOR TECHNOLOGIES FOR CONVENTIONAL ANDADVANCED LWRS
SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION Topic: N/AN/A
SBIR Phase I 1991 Nuclear Regulatory Commission -
EFFECT OF AGING ON RESPONSE TIME OF NUCLEAR PLANT PRESSURE SENSORS
SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission -
OPTIMAL ENERGY MANAGEMENT FOR KINETIC ENERGY WEAPONS
SBC: BARRON ASSOCIATES, INC. Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseMissile Defense Agency -
HYBRIDIZED METAL MATRIX COMPOSITES FOR PASSIVE DAMPING
SBC: CORDEC CORP. Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseMissile Defense Agency -
Comprehensible Descriptions for Fast Processing of Image Data
SBC: DATAMAT SYSTEMS RESEARCH, INC. Topic: N/AN/A
SBIR Phase I 1996 Department of DefenseMissile Defense Agency -
INFRARED SENSOR AND IMAGING SYSTEM
SBC: EMPIRICAL TECHNOLOGIES CORPORATION Topic: N/AN/A
SBIR Phase I 1988 Department of DefenseMissile Defense Agency