You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
  2. MEASUREMENT OF RESIDUAL RADIOACTIVE CONTAMINATION BY 2-D LASER HEATED TLD

    SBC: International Sensor            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  3. EVALUATION OF GENERAL FAILURE TYPES IN SAFETY ANALYSIS

    SBC: John Wreathall & Company            Topic: N/A

    THIS WORK IS TO DEVELOP A METHOD TO IMPROVE THE ABILITY OF THE USNRC TO EVALUATE THE OPERATIONAL SAFETY SIGNIFICANCE OF OCCURANCES AT NUCLEAR POWER PLANTS. PERHAPS THE AREA OF GREATEST SAFETY SIGNIFICANCE IS HUMAN PERFORMANCE, BUT THE TECHNIQUES USED BY NRC DO NOT EVALUATE HUMAN PERFORMANCE IN ANY SYSTEMIC WAY. THE WORK IS PROPOSED TO BE PERFORMED IN THREE STAGES, AND BUILDS ON METHODS THAT HAVE B ...

    SBIR Phase I 1992 Nuclear Regulatory Commission
  4. A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS

    SBC: TPL, INC            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  5. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government