You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Wire Bonding Interconnects for High Temperature Silicon Carbide Electronics

    SBC: Tacan Corp            Topic: N/A

    We propose to investigate the use of new three-layer metallization schemes for wire bond pads to improve the reliability of wire bonding interconnects used in high temperature silicon carbide electronics. Current wire bonding technology does not have the ability to survive elevated temperatures (500" C) for extensive periods of time without failure by several mechanisms which include corrosi ...

    SBIR Phase I 1997 Department of DefenseNavy
  2. Wearable Electronics for Man Machine Interfaces

    SBC: CARLOW INTERNATIONAL, INC.            Topic: N/A

    Computing technology (as well as control and display technology) is rapidly becoming more powerful, miniaturized and wearable. These trends will allow Navy personnel to be increasingly mobile, not tethered to hardwired console and computer systems. In conjunction with wearable display systems, wireless LANs, and alternative control mechanisms (such as voice recognition), system operators may, ...

    SBIR Phase I 1996 Department of DefenseNavy
  3. Weapons Impact Assessment Technology

    SBC: Enel Co.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseNavy
  4. WAVEFORM DESIGN TO DEFEAT INTERCEPT/IDENTIFICATION

    SBC: Processing Research Inc            Topic: N/A

    CURRENT, UBIQUITOUS TIME-OF-ARRIVAL (TOA) BASED INTERCEPT RECEIVER PROCESSING CAN BE EASILY DEFEATED BY RANDOMIZING THE RADAR PRI. CURRENTLY DEPLOYED SYSTEMS ALL EMPLOY SOME FORM OF (RELATIVELY) NARROW BANDWIDTH SUPERHETERODYNE-BASED INTERFEROMETER AS THE BASIC INTERCEPT RECEIVER ARCHIETECTURE; ADDITION OF PULSE-TO-PULSE RANDOM FREQUENCY AGILITY WILL FURTHER DEGRADE THE INTERCEPT CAPABILITY. USE O ...

    SBIR Phase I 1989 Department of DefenseNavy
  5. Water Crash Dynamics and Structural Concepts for Naval Helicopters

    SBC: DYNAMIC RESPONSE, INC.            Topic: N/A

    A Phase I and Phase I option research program is presented which is designed to provide the DOD, DOT, and aircraft manufacturers with a valuable design tool to help improve water impact survivability. It is recognized that impacts into water can be more deleterious to structure and occupants as compared to similar accidents on rigid terrain. The proposed program involves the use of existing c ...

    SBIR Phase I 1996 Department of DefenseNavy
  6. Water Crash Dynamics and Structural Concepts for Naval Helicopters

    SBC: KARAGOZIAN & CASE, INC.            Topic: N/A

    The objective of this study is to provide state-of-the-art crashworthiness engineering to better protect the occupants of Naval helicopters which crash into the sea. To date, crash dynamic analysis and crash design criteria have been based mainly on rigid ground impacts and are therefore not of real use to the Navy, where nearly 90 percent of crashes occur into water. When a helicopter cras ...

    SBIR Phase I 1996 Department of DefenseNavy
  7. WARFARE SYSTEMS ARCHITECTURES: STRIKE WARFARE (STW)

    SBC: Defense Group Inc.            Topic: N/A

    DEFENSE GROUP INCORPORATED (DGI) IN CONJUNCTION WITH SCIENCE APPLICATIONS INTERNATIONAL CORPORATION (SAIC) PROPOSES TO USE INNOVATIVE ANALYSIS TECHNIQUES TO RELATE THE NAVY'S STRIKE WARFARE (STW) WARFIGHTING REQUIREMENTS TO STW SYSTEMS ACQUISITION. THE METHODOLOGY CONSISTS OF: (1) DEVELOPING A SET OF TIME-PHASED EVENTS THAT COMPRISE THE STW OPERATIONAL SEQUENCE, (2) FOR EACH EVENT, DESCRIBING THE ...

    SBIR Phase I 1989 Department of DefenseNavy
  8. WARFARE SYSTEMS ARCHITECTURES

    SBC: Sigpro Systems, Inc.            Topic: N/A

    EW ARCHITECTURES ARE ESTABLISHED IN THE ARCHITECTURE GENERATOR WITH EW NAVAL WARFARE STRATEGIES, EW - TLWRS, MISSION DECOMPOSITION INFORMATION, BATTLE FORCE STRUCTURES AND ASSOCIATED INFORMATION AS KEY INPUTS. THIS NEW ARCHITECTURE GENERATOR IS BASED ON FUNDAMENTAL PROBABILITY THEOREMS, TIME AND EVENT SEQUENCING ALGORITHMS, PARALLEL PROCESSING ALGORITHMS, AND NAVAL WARFARE STRATEGY RULES. THE GENE ...

    SBIR Phase I 1989 Department of DefenseNavy
  9. WARFARE SYSTEMS ARCHITECTURE (COMMAND AND CONTROL)

    SBC: Logi-tech Engineering Resource            Topic: N/A

    DRAMATIC INCREASES IN INFORMATION SYSTEM CAPABILITIES AND SUBSTANTIAL REDUCTIONS IN THEIR COSTS COMPARED TO REMOTE WIRELESS COMMUNICATIONS IS A POWERFUL ARGUMENT FOR A REVISED ARCHITECTURE CONCEPT FOR C2 INFORMATION MANAGEMENT. REDUCING ON-LINE, INTER-PLATFORM DATA TRANSMISSION REQUIREMENTS THROUGH COST-EFFECTIVE MANAGEMENT OF INFORMATION IS NOW POSSIBLE. APPLICATION OF THE INFORMATION MANAGEMENT ...

    SBIR Phase I 1989 Department of DefenseNavy
  10. WARFARE SYSTEMS ARCHITECTURE

    SBC: SRS Technologies            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseNavy
US Flag An Official Website of the United States Government