You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. WE PROPOSE TO INVESTIGATE VARIOUS CONTROL METHODS BY WHICH THE POWER FACTOR OF AN INDUCTION GENERATOR CAN BE REGULATED TO ACHIEVE ENCHANCED POWER CONVERSION EFFICIENCY.

    SBC: Emd            Topic: N/A

    WE PROPOSE TO INVESTIGATE VARIOUS CONTROL METHODS BY WHICH THE POWER FACTOR OF AN INDUCTION GENERATOR CAN BE REGULATED TO ACHIEVE ENCHANCED POWER CONVERSION EFFICIENCY. IN PARTICULAR, THIS STUDY WILL FOCUS UPON VARIABLE GENERATOR TERMINAL VOLTAGE CONTROL TO ACCOMPLISH THESE GOALS. VARIOUSCONTROL STRATEGIES WILL BE DEVELOPED IN ORDER TO IDENTIFY THE MOST COST-EFFECTIVE AND RELIABLE METHODS FOR TEST ...

    SBIR Phase I 1986 Department of Energy
  2. VIBRATOR

    SBC: Mertz Inc.            Topic: N/A

    THIS RESEARCH WILL EXPLORE THE POSSIBILITIES AND RESULT IN THE DESIGN OF AN ACOUSTIC ENERGY GENERATOR FOR GEOPHYSICAL EXPLORATION IN INACCESSIBLE MOUNTAINOUS TERRAIN. THIS EFFORT WILL DETERMINE THE MAGNITUDE OF ACOUSTIC SIGNAL REQUIRED AND WILL DEVELOP A TECHNIQUE FOR COUPLING THE SIGNAL GENERATOR TO THE EARTH. THE COUPLING TECHNIQUE WILL EXAMINE FORCES OTHER THAN GRAVITY TO ENSURE THAT THE SIGNAL ...

    SBIR Phase I 1983 Department of Energy
  3. Ultra-Lightweight Carbon-Carbon Cooling Structure For Pixel and Silicon Strip Detectors

    SBC: HYTEC, INC.            Topic: N/A

    180 Ultra-Lightweight Carbon-Carbon Cooling Structure For Pixel and Silicon Strip Detectors-HYTEC, Inc., 110 Eastgate Dr., Suite 100, Los Alamos, NM 87544-3304; (505) 662-0080 Mr. William O. Miller, Principal Investigator Mr. William O. Miller, Business Official DOE Grant No. DE-FG03-97ER82397 Amount: $75,000 Removal of heat from the next generation of particle detection systems used in high ...

    SBIR Phase I 1997 Department of Energy
  4. Ultra High Efficiency Silicon Carbide Based Hid Electronic Ballast With Dimming and Quick Restart Service Functions

    SBC: Epic Sales, Inc. Dba Epic Systems            Topic: 32

    Electronic ballasts for high intensity discharge (HID) lamps have achieved significant improvements over magnetic ballasts by increasing efficiencies from ~80-85% to ~90-93%, while improving power factor, lamp re-start, and the avoidance of acoustic resonance. In order to further improve the efficiency of these ballasts to greater than 95%, advanced power electronics ¿ such as silicon carbide (S ...

    SBIR Phase I 2006 Department of Energy
  5. Ultrafast Polysilylene Scintillators

    SBC: Adherent Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  6. THIS PROPOSAL FOR RESEARCH ADDRESSES THE NEED FOR NEW, HIGH-TEMPERATURE MATERIALS OF UNUSUAL STRUCTURAL AND PHYSICAL PROPERTIES.

    SBC: Syncrys Inc            Topic: N/A

    THIS PROPOSAL FOR RESEARCH ADDRESSES THE NEED FOR NEW, HIGH-TEMPERATURE MATERIALS OF UNUSUAL STRUCTURAL AND PHYSICAL PROPERTIES. THE CHEMICAL STABILITY AND THE TENDENCY FOR EUTECTIC SOLIDIFICATION WOULD BE EXPLORED FOR SPECIFIC PERIODIC GROUP III AND IV METAL OXIDE-METAL NITRIDESYSTEMS. TO DO THIS, BLENDED OXIDE-NITRIDE POWDERS WOULD BEPRESSED INTO PELLETS, HEATED ON W, MO, OR TA STRIP HEATERS TO ...

    SBIR Phase I 1986 Department of Energy
  7. THE PROJECT WILL INVOLVE ADAPTATION AND VALIDATION OF NOISE SIGNAL ANALYSIS FOR MONITORING OF OPERABILITY OF THE PROCESSSENSORS IN NUCLEAR POWER PLANTS.

    SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION            Topic: N/A

    THE PROJECT WILL INVOLVE ADAPTATION AND VALIDATION OF NOISE SIGNAL ANALYSIS FOR MONITORING OF OPERABILITY OF THE PROCESSSENSORS IN NUCLEAR POWER PLANTS. THE PROJECT WILL FOCUS ON DEVELOPING MICROCOMPUTER-BASED ALGORITHMS AND PROCEDURES FORCONTINUOUS, UNATTENDED MONITORING OF SENSORS AS THE PROCESS IS OPERATING. THE DISTINCTION BETWEEN SENSOR SYSTEM DEGRADATION AND PROCESS TRANSIENTS WILL BE PERFOR ...

    SBIR Phase I 1986 Department of Energy
  8. THE ON-LINE DETECTION OF ENTRAPPED AIR VOIDS IN LIQUID-FILLED SENSING LINES WILL BE INVESTIGATED.

    SBC: Ergometrics Technology Inc            Topic: N/A

    THE ON-LINE DETECTION OF ENTRAPPED AIR VOIDS IN LIQUID-FILLED SENSING LINES WILL BE INVESTIGATED. IN NUCLEAR PLANTS THE SENSING LINES USED FOR MEASUREMENT OF FEEDWATER FLOWRATE AND REACTOR COOLANT LEVEL ARE OFTEN SEVERAL HUNDERED FEET IN LENGTH. THE PROBLEM ASSOCIATED WITH THE PRESENCE OF ENTRAPPED AIR CAN MANIFEST ITSELF AS EITHER A STATIC OR DYNAMIC OFFSET ERROR IN THE PROCESS PARAMETER MEASUREM ...

    SBIR Phase I 1986 Department of Energy
  9. THE MONITORING OF ACIDIC DRY DEPOSITION HAS POSED SIGNIFICANT LOGISTICAL AND TECHNICAL PROBLEMS WHICH MUST BE OVERCOME AS PART OF OUR NATIONAL EFFORT TO ACCURATELY CHARACTERIZE AND UNDERSTAND ACID PRECIPITATION PATTERNS.

    SBC: Fwg Associates, Inc.            Topic: N/A

    THE MONITORING OF ACIDIC DRY DEPOSITION HAS POSED SIGNIFICANT LOGISTICAL AND TECHNICAL PROBLEMS WHICH MUST BE OVERCOME AS PART OF OUR NATIONAL EFFORT TO ACCURATELY CHARACTERIZE AND UNDERSTAND ACID PRECIPITATION PATTERNS. THE SAMPLING EQUIPMENT IN WIDESPREAD USE TODAY HAS AS ITS TECHNOLOGICAL BASIS MANY FEATURES OF A 50-YEAR-OLD RAINFALL COLLECTOR, MODIFIED TO INCLUDE DRY SAMPLE COLLECTION. A SAMPL ...

    SBIR Phase I 1986 Department of Energy
  10. THE MAJOR LIMITING RELIABILITY COMPONENT OF CRYOGENIC SYSTEMS HAS ALWAYS BEEN SEALS.

    SBC: Facility & Manufacturing            Topic: N/A

    THE MAJOR LIMITING RELIABILITY COMPONENT OF CRYOGENIC SYSTEMS HAS ALWAYS BEEN SEALS. BESIDES CONTRIBUTING TO GAS CONTAMINATION AND DEBRIS PARTICLE ACCUMULATION, SEALS HAVE PHYSICALLY FAILED; AS A RESULT, SEALS HAVE BEEN RESPONSIBLE FOR THE MAJORITY OF FAILURES OCCURRING IN CRYOGENIC LIQUIFICATION AND REFRIGERATION SYSTEMS. A POTENTIALLY VIABLE SOLUTION IS THE DEVELOPMENT OF LONG-LIFE CRYOGENIC SEA ...

    SBIR Phase I 1983 Department of Energy
US Flag An Official Website of the United States Government