You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY21 is not expected to be complete until September, 2022.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. Data Fusion for Timely Screening of Treaty Verification Data

    SBC: ABTECH CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Energy
  2. A Three Dimensional Flow Parallel-Processing System for Fast Programmable Real-Time Applications

    SBC: 3D-Computing, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Energy
  3. Ultrafast Polysilylene Scintillators

    SBC: Adherent Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  4. Template-Medicated Synthesis of Periodic Membranes for Improved Liquid-Phase Separations

    SBC: American Research Corporation of Virginia            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  5. A Fuzzy Expert Systems-Based Standard Generalized Markup Language Interface for Access and Collaborative Authoring of Multi-Domain Technical Documents on a Wide Area Network

    SBC: American Research Corporation of Virginia            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Energy
  6. High Power Target Design for a Next Generation Radioactive Beam ISOL-Type Facility

    SBC: Amparo Corp.on            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  7. LURGI AND IN SITU-GENERATED RAW COAL GAS CONTAIN TARS, PHENOLS AND LIGHT HYDROCARBONS.

    SBC: Carbotek Inc            Topic: N/A

    LURGI AND IN SITU-GENERATED RAW COAL GAS CONTAIN TARS, PHENOLS AND LIGHT HYDROCARBONS. THESE BY-PRODUCTS ARE OFTEN UNMARKETABLE AND FORCE THE USE OF EXPENSIVE AND CUMBERSOME GAS CLEANUP SCHEMES TO REMOVE AND DISPOSE OF THEM. THIS PROJECT AIMS TO DEVELOP A CATALYTIC GAS CLEANUP STEP FOR CONVERSION OF BY-PRODUCTS IN THE RAW GAS TO ADDITIONAL H(2), CO, CO(2), AND CH(4). SUCH A CLEANUP STEP WOULD ELIM ...

    SBIR Phase I 1983 Department of Energy
  8. A Low Cost Acoustic Property Sensor for Measuring Natural Gas Composition in Liquid Natural Gas (LNG) Powered Vehicles

    SBC: Commercial Electronics, Inc.            Topic: N/A

    86 A Low Cost Acoustic Property Sensor for Measuring Natural Gas Composition in Liquid Natural Gas (LNG) Powered Vehicles--Commercial Electronics, Inc., 801 North 15th Street, Broken Arrow, OK 74012-2838; (918) 251-0925 Mr. Scott Phillips, Principal Investigator Mr. Michael A. Phillips, Business Official DOE Grant No. DE-FG03-97ER82353 Amount: $75,000 Among the various alternative fuels propos ...

    SBIR Phase I 1997 Department of Energy
  9. Laser Consolidation of Silicon Carbide/Titanium Metal Composite Turbine Rings

    SBC: CORDEC CORP.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Energy
  10. LNG Storage and Delivery System Analysis

    SBC: Directed Technologies, Inc.            Topic: N/A

    87 LNG Storage and Delivery System Analysis--Directed Technologies, Inc., 4001 North Fairfax Drive, Suite 775, Arlington, VA 22203-1614; (703) 243-3383 Mr. Brian D. James, Principal Investigator Mr. Ira F. Kuhn, Jr., Business Official DOE Grant No. DE-FG02-97ER82357 Amount: $75,000 To reduce foreign fuel dependence and improve the Nation¿s air quality, new high-efficiency, direct-injection d ...

    SBIR Phase I 1997 Department of Energy
US Flag An Official Website of the United States Government