You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. STUDY ON AVAILABILITY AND COMPOSITION OF METAL BEARING WASTES

    SBC: N.h. Parker, P.e. And            Topic: N/A

    N/A

    SBIR Phase I 1983 Nuclear Regulatory Commission
  2. SEISMIC PRA

    SBC: Future Resources Associate Inc            Topic: N/A

    N/A

    SBIR Phase I 1983 Nuclear Regulatory Commission
  3. ROBOTICS APPLICATION FOR EXPOSURE REDUCTION

    SBC: Remotec Inc.            Topic: N/A

    N/A

    SBIR Phase I 1983 Nuclear Regulatory Commission
  4. REAL-TIME COLLECTION OF OPERATIONAL DATA TO SUPPORT RISK-BASED OPERATION REGULATION AND INSPECTIONS AT NUCLEAR POWER PLANTS

    SBC: Accident Prevention Group            Topic: N/A

    COMPUTERIZED DATA COLLECTION DEVICES EXIST AND ARE BEING USED IN VARIOUS APPLICATIONS AT SOME NPPS FOR SYSTEMS AND EQUIPMENT NOT INSTRUMENTED IN THE CONTROL ROOM. HOWEVER, CURRENT APPLICATIONS IN THE NUCLEAR POWER INDUSTRY ARE RATHER SPORADIC AND NOT EXPLOITING THE FULL POTENTIAL OF THE TECHNOLOGY. FOR EXAMPLE, SEVERAL DIFFERENT NPPS USE SUCH SYSTEMS FOR SINGLE- PURPOSES SUCH AS TRENDS IN EQUIPMEN ...

    SBIR Phase I 1993 Nuclear Regulatory Commission
  5. PRESSURIZED WATER REACTOR TRANSIENT ANALYSIS MODEL

    SBC: Levy S Inc            Topic: N/A

    N/A

    SBIR Phase I 1983 Nuclear Regulatory Commission
  6. COMMON CAUSE FAILURE ANALYSIS (CCFA) IS AN IMPORTANT ELEMENTOF A COMPLETE PROBABILISTIC RISK ASSESSMENT (PRA) SINCE COMMON CAUSE FAILURE IS OFTEN A DOMINANT FACTOR IN THE RISK POSED TO PUBLIC HEALTH AND SAFETY FROM NUCLEAR POWER PLANT ACCIDENTS.

    SBC: Jfb Associates Inc.            Topic: N/A

    COMMON CAUSE FAILURE ANALYSIS (CCFA) IS AN IMPORTANT ELEMENTOF A COMPLETE PROBABILISTIC RISK ASSESSMENT (PRA) SINCE COMMON CAUSE FAILURE IS OFTEN A DOMINANT FACTOR IN THE RISK POSED TO PUBLIC HEALTH AND SAFETY FROM NUCLEAR POWER PLANT ACCIDENTS. A MAJOR PROBLEM ASSOCIATED WITH PERFORMING A CFFA IS THE ABSENCE OF SUPPORTING QUALITATIVE OR QUANTITATIVE COMPONENT FAILURE DATA. EXTENSIVE AMOUNTS OF CO ...

    SBIR Phase I 1983 Nuclear Regulatory Commission
  7. COMBINING LASER MEASUREMENTS WITH BACKWARD WAVE TECHNIQUES FOR EVALUATION OF UNDERGROUND OPENINGS IN OIL SHALE

    SBC: Sigma Research Corp            Topic: N/A

    N/A

    SBIR Phase I 1983 Nuclear Regulatory Commission
  8. AN ULTRA-HIGH SPEED RESIDUE NUMBER PROCESSOR FOR SAFT INSPECTION SYSTEM IMAGE ENHANCEMENT

    SBC: Sigma Research Corp            Topic: N/A

    N/A

    SBIR Phase I 1983 Nuclear Regulatory Commission
  9. ADVANCED METHODS FOR MODELING TEAM EFFECTS ON CONTROL-ROOM OPERATOR PERFORMANCE IN REAL-TIME

    SBC: ASCA, INC.            Topic: N/A

    THIS RESEARCH SEEKS THE DEVELOPMENT AND DEMONSTRATION OF A MODEL THAT REPRESENTS THE GROUP DECISION-MAKING PROCESSES TAKING PLACE INSIDE THE CONTROL ROOM OF A NUCLEAR POWER PLANT UNDER BOTH NORMAL AND ABNORMAL OPERATING CONDITIONS. COGNITIVE DECISIONS, TEAM EFFECTS, AND DYNAMIC FEATURES ARE AMONG THE MAJOR ISSUES THAT WILL BE ADDRESSED IN THE PROJECT. THE BASIC TOOL TO BE USED IS THE INFLUENCE DIA ...

    SBIR Phase I 1993 Nuclear Regulatory Commission