You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Feasibility of Using Impulse Radar to Detect and Identify Detonators

    SBC: AKELA INC            Topic: N/A

    This proposal seeks to demonstrate the feasibility of using impulse radar techniques to detect and identify explosive detonators. It relies on the fact that a radar impulse will excite natural electromagnetic resonances which characterize the size, shape, and material composition of an object. These resonances are present in the scattered transient return from the object and can be extracted by ...

    SBIR Phase I 1996 Department of Transportation
  2. A COMPACT ACCELERATOR-BASED NEUTRON SOURCE FOR BAGGAGE INTERROGATION

    SBC: Accsys Technology, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of Transportation
  3. AN AUTOMATED INJURY CODING PROGRAM

    SBC: Advanced Decision Systems            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of Transportation
  4. TRAFFIC MANAGEMENT CONCEPT EVALUATION

    SBC: Akm Associates, Inc.            Topic: N/A

    AN AIR-TRAFFIC FLOW MANAGEMENT (ATFM) TOOL BASED EITHER ON STRICT MATHEMATICAL FORMULATION AND OPTIMIZATION, AND/OR ONEBASED ON HEURISTIC KNOWLEDGE ABOUT DISTRIBUTING THE FLOW OVER THE NETWORK MAY PROVIDE A SOLUTION TO THE PROBLEM, PERHAPS MUCH BETTER AND OBJECTIVE THAN THE ONE MADE PRESENTLY BY A CADRE OF EXPERTS UNDER STRESSFUL CONDITIONS. THE SYSTEM SHOULD COMPLEMENT THE HUMAN DECISIONS MADE DA ...

    SBIR Phase I 1987 Department of Transportation
  5. DEVELOPMENT OF SURFACE ACOUSTIC WAVE (SAW) ALTITUDE SENSOR

    SBC: Amerasia Technology, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of Transportation
  6. X-RAY FALSE IMAGE PROJECTION

    SBC: Astrophysics Research Corp            Topic: N/A

    THE FEASIBILITY AND EFFECTIVENESS OF PROJECTING THREAT IMAGES INTO X-RAY IMAGES OF AIR PASSENGER LUGGAGE ARE STUDIED. TECHNICAL ISSUES AS WELL AS OPERATIONAL CONCERNS ARE ADDRESSED.

    SBIR Phase I 1987 Department of Transportation
  7. REMOTE PASSENGER BAGGAGE IDENTIFICATION

    SBC: Astrophysics Research Corp            Topic: N/A

    THE FEASIBILITY OF PROVIDING LOW COST REMOTE PASSENGER BAGGAGE IDENTIFICATION IS STUDIED. RADIO IDENTIFICATION TAGS ARE EMPHASIZED. IDENTIFICATION OF ALL LUGGAGE PASSING A PORTAL AS WELL AS SEARCHING FOR A SPECIFIC PIECE OF LUGGAGE ARE ADDRESSED. DETECTION EQUIPMENT AS WELL AS LOW COST TAGS ARE CONSIDERED IN CONJUNCTION WITH THE AIRPORT BAGGAGE HANDLING ENVIRONMENT.

    SBIR Phase I 1987 Department of Transportation
  8. SCILNTILLATION FIBER DETECTOR FOR IN-VIVO ENDOSCOPIC INTER- NAL DOSIMETRY

    SBC: Center For Planning & Research            Topic: N/A

    AN ALPHA/BETA RADIATION DETECTOR SUITABLE FOR USE IN THE INSTRUMENT CHANNEL OF A FIBEROPTIC ENDOSCOPE WILL BE WILL BE DEVELOPED TO PROVIDE IN-VIVO IN-SITU BIOASSAY MEASUREMENTS LEADING TO COMPUTER-ASSISTED ESTIMATES OF IN- TERNAL DOSE AND DISTRIBUTION IN THE RESPIRATORY AND GASTRO- INTESTINAL TRACTS. DURING PHASE I OF THE PROGRAM, ALPHA AND BETA PARTICLE SENSITIVE SCINTILLATING PLASTIC FIBERS WILL ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  9. Improved Source Location Using Sensor-Arrays

    SBC: Cyltek, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  10. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government