You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
SCILNTILLATION FIBER DETECTOR FOR IN-VIVO ENDOSCOPIC INTER- NAL DOSIMETRY
SBC: Center For Planning & Research Topic: N/AAN ALPHA/BETA RADIATION DETECTOR SUITABLE FOR USE IN THE INSTRUMENT CHANNEL OF A FIBEROPTIC ENDOSCOPE WILL BE WILL BE DEVELOPED TO PROVIDE IN-VIVO IN-SITU BIOASSAY MEASUREMENTS LEADING TO COMPUTER-ASSISTED ESTIMATES OF IN- TERNAL DOSE AND DISTRIBUTION IN THE RESPIRATORY AND GASTRO- INTESTINAL TRACTS. DURING PHASE I OF THE PROGRAM, ALPHA AND BETA PARTICLE SENSITIVE SCINTILLATING PLASTIC FIBERS WILL ...
SBIR Phase I 1987 Nuclear Regulatory Commission -
"SEVERE ACCIDENT PHENOMENA: NATURAL CIRCULATION IN REACTOR COOLANT SYSTEM"
SBC: Fluid Physics Ind. Topic: N/AA RESEARCH PROGRAM IS PROPOSED FOR THE DEVELOPMENT OF A VALIDATED METHODOLOGY FOR PREDICTING THE EX-VESSEL BUOYANCY-DRIVEN FLOWS IN THE HOT LEG AND STEAM GENERATOR OF A WESTINGHOUSE PLANT, AND IN THE CANDY CANE HOT LEG OF A B&W PLANT. THE PROPOSED PHASE I WORK PLAN CONSISTS OF (A) REVIEWING AVAILABLE WESTINGHOUSE EXPERIMENTAL DATA AND SIMULATING THE EXPERIMENTAL CONFIGURATION, (B) VALIDATING THE M ...
SBIR Phase I 1987 Nuclear Regulatory Commission -
SCOPING ANALYSIS OF LWR SHUTDOWN ACCIDENTS INITIATED BY EARTHQUAKES AND INTERNAL FIRES
SBC: Future Resources Associate Inc Topic: N/AN/A
SBIR Phase I 1990 Nuclear Regulatory Commission -
SEISMIC PRA
SBC: Future Resources Associate Inc Topic: N/AN/A
SBIR Phase I 1983 Nuclear Regulatory Commission -
PRESSURIZED WATER REACTOR TRANSIENT ANALYSIS MODEL
SBC: Levy S Inc Topic: N/AN/A
SBIR Phase I 1983 Nuclear Regulatory Commission -
ROBOTICS APPLICATION FOR EXPOSURE REDUCTION
SBC: Remotec Inc. Topic: N/AN/A
SBIR Phase I 1983 Nuclear Regulatory Commission -
IMPROVEMENTS IN MOTOR OPERATED GATE VALVE DESIGN AND PREDICTIVE MODELS FOR RELIABILITY IMPROVEMENTS IN NUCLEAR POWER PLANT SAFETY SYSTEMS
SBC: KALSI ENGINEERING, INC Topic: N/AMOTOR OPERATED GATE VALVE OPERABILITY PROBLEMS AND FAILURES AT NUCLEAR POWER PLANTS ARE A MAJOR SAFETY CONCERN AS STATEDIN NRC IE BULLETIN 85-03 AND GENERIC LETTER 89-10. THIS PROPOSAL IS AIMED AT IMPROVING GATE VALVE PERFORMANCE BY (1) DEVELOPING COMPREHENSIVE PERFORMANCE PREDICTION MODELS FOR USE OVER A RANGE OF OPERATING CONDITIONS, (2) DEFINING LIMITS, BASED ON SPECIFIC DESIGNS, BEYOND WHICH E ...
SBIR Phase I 1990 Nuclear Regulatory Commission -
PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS
SBC: KALSI ENGINEERING, INC Topic: N/AN/A
SBIR Phase I 1987 Nuclear Regulatory Commission -
ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT
SBC: MISSION RESEARCH CORP. Topic: N/AMRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...
SBIR Phase I 1990 Nuclear Regulatory Commission -
AUTOMATIC CREATION AND RENODALIZATION OF TRAC-BWR INPUT DECKS
SBC: Expert-ease Systems Topic: N/ATHE OBJECTIVE OF THE PROPOSED RESEARCH IS TO BUILD A USER-FRIENDLY, PERSONAL COMPUTER BASED WORKSTATION FOR PERFORMING TRAC-BWR ANALYSIS. THE SOFTWARE WILL ALLOW A USER TO READ-IN DATA FROM EXISTING TRAC-BWR INPUT DECKS (ASCII), DRAW NODALIZATION DIAGRAM, MODIFY INPUT, AUTOMATICALLY RENODALIZE THE VESSEL, CHAN AND PIPE COMPONENTS, GENERATE INPUT DECK, SUBMIT JOB, BRING BACK PLOTDATA, DISPLAY RESUL ...
SBIR Phase I 1987 Nuclear Regulatory Commission