You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY21 is not expected to be complete until September, 2022.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
-
VALIDATION & TESTING OF THE VAM2D COMPUTER CODE
SBC: Hydrogeologic Inc. Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission -
N/A
SBC: Datasonics, Inc. Topic: N/ATHERE IS A NEED FOR DEVELOPMENT OF A COMMERCIALLY AVAILABLE ECONOMICAL ACOUSTIC DOPPLER BACKSCATTER INSTRUMENT WHICH CANBE EASILY DEPLOYED AND USED TO SIMULTANEOUSLY ACQUIRE CURRENT PROFILE DATA AND BACKSCATTER AMPLITUDE INFORMATION RELATING TO PARTICLE CONCENTRATIONS IN THE WATER COLUMN. THE RESEARCH PROPOSED IN PHASE I IS DIRECTED AT TWO AREAS OFDOPPLER BACKSCATTER MEASUREMENT WHERE ADVANCES IN ...
SBIR Phase I 1983 Department of the Interior -
N/A
SBC: STARFIRE ENGINEERING INC. Topic: N/AWHEN IT IS NECESSARY TO RAISE A MARINE PIPELINE FOR REPAIR DUE TO TRAWLER SNAG, ETC., THE PIPELINE WILL BUCKLE, AND THEN THE BUCKLE WILL PROPAGATE IF ALL CONDITIONS ARE NOT PROPER. WITH SEVERE BUCKLES, THE PIPE WILL BREAK OPEN ALLOWING THE OIL TO SPILL. THIS CAN BE MINIMIZED BY PERIODICALLY PLACING REMOTELY OPERABLE VALVES IN THE LINE FOR CUTOFF. BUT SOMETIMES THE PIPELINE ROTATES AS IT IS BEING L ...
SBIR Phase I 1983 Department of the Interior -
N/A
SBC: TRADCO CHEMICAL CORPON Topic: N/AUSING RADIO TELEMETRY MODEMS, IS CURRENTLY POSSIBLE. THIS IS NECESSARY BECAUSE LACK OF MONITORING CAUSES INADEQUATE CONTROL OF INTERNAL CORROSION TAKING PLACE INSIDE OFFSHORE PIPELINE SYSTEMS. THE NET RESULT IS PIPELINE FAILURE DUE TOTHE EFFECTS OF CORROSION. THE RESULT OF PIPELINE FAILURE WILL BE AN OIL SPILL IN COASTAL WATERS. AS THE NATION'S OFFSHORE PIPELINE SYSTEM GROWS OLDER, THE NET EFFECTS ...
SBIR Phase I 1983 Department of the Interior -
MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS
SBC: Risk Management Systems Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission