You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY21 is not expected to be complete until September, 2022.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
-
ZERO GRAVITY PHASE SEPARATION VIA ULTRASONIC COALESCENCE
SBC: Taylor S R & Assocs Topic: N/AN/A
SBIR Phase I 1988 National Aeronautics and Space Administration -
WIRELESS HEADSET
SBC: Apeiron Topic: N/AN/A
SBIR Phase I 1988 National Aeronautics and Space Administration -
WIND TUNNEL REMOTE TURBULENCE CHARACTERIZATION (PD-147B)
SBC: Physical Sciences Inc. Topic: N/AWE PROPOSE A MONITOR FOR DENSITY FLUCTUATIONS IN THE BOUNDARY LAYER OF TURBULENT FLOWS AROUND TEST OBJECTS IN WIND TUNNELS. THE DIAGNOSTIC IS BASED UPON THE LASER-INDUCED FLUORESCENCE FROM MOLECULAR OXYGEN WHICH IS EXCITED WHEN 193 NM LIGHT FROM AN ARF EXCIMER LASER PROPAGATES THROUGH THE AIR. PARTIAL PREDISSOCIATION GIVES THE EXCITED MOLECULAR OXYGEN A VERY SHORT LIFETIME AND THEREFORE RENDERS IT ...
SBIR Phase I 1988 National Aeronautics and Space Administration -
WIDE SPECTRUM HIGH PERFORMANCE SENSOR CALIBRATORS
SBC: SI Diamond Technology Inc Topic: N/AN/A
SBIR Phase I 1996 National Aeronautics and Space Administration -
Visualization Of High Nox Regions In Combusters For Design Cycle Time Improvement
SBC: Aerodyne Research, Inc. Topic: N/AN/A
SBIR Phase I 1997 National Aeronautics and Space Administration -
Virtual Environment System For Space Operations
SBC: LINCOM CORP. Topic: N/AN/A
SBIR Phase I 1997 National Aeronautics and Space Administration -
VALIDATION & TESTING OF THE VAM2D COMPUTER CODE
SBC: Hydrogeologic Inc. Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission -
Universal Fiber Optic Test/Instrumentation System (Ufo-Tis)
SBC: Systems & Processes Engineering Corporation Topic: N/AN/A
SBIR Phase I 1997 National Aeronautics and Space Administration -
3-5 UM INTLAS DETECTOR ARRAYS WITH MINIMUM COOLING REQUIREMENTS
SBC: Spire Corporation Topic: N/AN/A
SBIR Phase I 1996 National Aeronautics and Space Administration -
Ultra-Stable Diode-Pumped Laser For Precision Metrology
SBC: Schwartz Electro-Optics, Inc Topic: N/AN/A
SBIR Phase I 1997 National Aeronautics and Space Administration