You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
ZERO GRAVITY PHASE SEPARATION VIA ULTRASONIC COALESCENCE
SBC: Taylor S R & Assocs Topic: N/AN/A
SBIR Phase I 1988 National Aeronautics and Space Administration -
ZEOLITE OPTRODES
SBC: TDA RESEARCH, INC. Topic: N/AN/A
SBIR Phase I 1996 National Aeronautics and Space Administration -
WIRELESS HEADSET
SBC: Apeiron Topic: N/AN/A
SBIR Phase I 1988 National Aeronautics and Space Administration -
WIND TUNNEL REMOTE TURBULENCE CHARACTERIZATION (PD-147B)
SBC: PHYSICAL SCIENCES INC. Topic: N/AWE PROPOSE A MONITOR FOR DENSITY FLUCTUATIONS IN THE BOUNDARY LAYER OF TURBULENT FLOWS AROUND TEST OBJECTS IN WIND TUNNELS. THE DIAGNOSTIC IS BASED UPON THE LASER-INDUCED FLUORESCENCE FROM MOLECULAR OXYGEN WHICH IS EXCITED WHEN 193 NM LIGHT FROM AN ARF EXCIMER LASER PROPAGATES THROUGH THE AIR. PARTIAL PREDISSOCIATION GIVES THE EXCITED MOLECULAR OXYGEN A VERY SHORT LIFETIME AND THEREFORE RENDERS IT ...
SBIR Phase I 1988 National Aeronautics and Space Administration -
WIND TUNNEL NOISE REDUCTION
SBC: Atlantic Applied Research Corp Topic: N/ASOUND AND TURBULENCE GENERATED BY THE INTERACTION BETWEEN THE FLOW AND STRUCTURES IN WIND TUNNELS ADDS TO THE FAN NOISE AND ESTABLISHES THE LOWER LIMIT OF BACKGROUND NOISE. IT INTERFACES WITH THE MEASUREMENT OF ACOUSTIC RADIATION FROM TEST ARTICLES AND THE PERFORMANCE OF TRANSITION EXPERIMENTS. RATHER THAN ATTENUATING SOUND AFTER IT HAS BEEN GENERATED, THIS PROJECT ADDRESSES THE REDUCTION OF FLOW- ...
SBIR Phase I 1990 National Aeronautics and Space Administration -
WIDE SPECTRUM HIGH PERFORMANCE SENSOR CALIBRATORS
SBC: SI Diamond Technology Inc Topic: N/AN/A
SBIR Phase I 1996 National Aeronautics and Space Administration -
WAVELENGTH DIPLEXED, FIBER COUPLED, COHERENT LASER RADAR MEASUREMENT SYSTEM
SBC: DIGITAL SIGNAL CORP. Topic: N/AN/A
SBIR Phase I 1990 National Aeronautics and Space Administration -
Visualization Of High Nox Regions In Combusters For Design Cycle Time Improvement
SBC: AERODYNE RESEARCH INC Topic: N/AN/A
SBIR Phase I 1997 National Aeronautics and Space Administration -
Virtual Environment System For Space Operations
SBC: LINCOM CORP. Topic: N/AN/A
SBIR Phase I 1997 National Aeronautics and Space Administration -
VERY LARGE SCALE INTEGRATION TIME INTERVAL UNITS
SBC: Schmidt Instruments Inc. Topic: N/ACONSTRUCTION OF CUSTOM VERY LARGE SCALE INTEGRATION (VLSI) CIRCUITS COMBINING ANALOG AND DIGITAL SECTIONS FOR A PRE-AMPLIFIER, DISCRIMINATOR, ENABLE GATE, AND TIME-TO-DIGITAL CONVERTER (TDC) TO FORM A FULLY MONOLITHIC TIME INTERVAL UNIT (TIU) IS THE PROPOSED INNOVATION. THIS TIU WILL DRAMATICALLY REDUCE THE SIZE, WEIGHT, AND POWER CONSUMPTION OF NASA SPACE-BASED LASER ALTIMETERS. ADDITIONAL ADVANT ...
SBIR Phase I 1990 National Aeronautics and Space Administration