You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Xenon 3D Detector for Gamma Ray Astronomy

    SBC: PROPORTIONAL TECHNOLOGIES, INC.            Topic: N/A

    This Small Business Innovation Research (SBIR) project will seek to achieve a quantum leap in sensitivity of gamma ray astronomy in the 100 keV to 10 MeV region through development of a novel high pressure xenon (HPXe) detector element for imaging the region of interest. This development will incorporate (1) a cost-effective means of containing HPXe safely up to pressures of 3240 psig, (2) innovat ...

    SBIR Phase I 2002 National Science Foundation
  2. WAVELET ANALYSIS AND NUMERICAL SOLUTIONS OF PARTIAL DIFFERENTIAL EQUATIONS

    SBC: Aware, Inc.            Topic: N/A

    THE PRINCIPAL PURPOSE OF THIS PROPOSAL IS TO DEVELOP SOLUTION METHODS FOR INITIAL AND/OR BOUNDARY VALUE PROBLEMS FOR DIFFERENTIAL EQUATIONS BASED ON THE RECENTLY DISCOVERED WAVELET BASIS FUNCTIONS. THE BASIS FUNCTIONS HAVE PROPERTIES OF ORTHOGONALITY, LOCAL SUPPORT, SCALING BEHAVIOR, AND INHERENTLY PARALLELIZABLE ALGORITHMS FOR COMPUTER IMPLEMENTATION, WHICH MAKES THEM VERY SUITABLE FOR MULTILEVEL ...

    SBIR Phase I 1990 National Science Foundation
  3. Volumertric Microbatteries Using Soft Lithography

    SBC: TPL, INC            Topic: N/A

    This Small Business Innovation Research Phase I project will develop microelectronic systems that will increase speed and capability combined with smaller size. As the patterning/feature size of microelectronics continues to decrease, the need for power systems of smaller physical size emerges as a critical need. This project will develop novel microbatteries that will deliver a minimum-area, vol ...

    SBIR Phase I 2002 National Science Foundation
  4. VALIDATION & TESTING OF THE VAM2D COMPUTER CODE

    SBC: Hydrogeologic Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  5. UNLIKE OTHER LIVESTOCK, THE EATING HABITS OF A POND FULL OF FISHES CANNOT BE DIRECTLY MONITORED.

    SBC: Cape Cod Research            Topic: N/A

    UNLIKE OTHER LIVESTOCK, THE EATING HABITS OF A POND FULL OF FISHES CANNOT BE DIRECTLY MONITORED. THIS LEADS TO IMPROPERFEEDING AND LIMITS THE FARMER'S ABILITY TO DETECT DISEASE AND CULTURE PROBLEMS. THIS PROPOSAL INVOLVES STUDYING THE FEASIBILITY OF MONITORING FISH FOOD CONSUMPTION BY INCORPORATING TRACE LEVELS OF ENCAPSULATED FLUORESCENT DYES IN FISH FOOD. THE TRACER RELEASE TAKES ADVANTAGE OF TH ...

    SBIR Phase I 1983 National Science Foundation
  6. ULTRA-HIGH-SPEED GAS CHROMATOGRAPH

    SBC: Ionics International, Inc.            Topic: N/A

    THE USE OF MICROBORE CAPILLARY COLUMNS FOR GAS CHROMATOGRAPHY PROMISES TO FACILITATE THE DEVELOPMENT OF AN INSTRUMENT CAPABLE OF RESOLVING AS MANY AS 15 COMPONENTS PERSECOND. THUS, MANY ANALYSES COULD BE COMPLETED IN JUST A FEW SECONDS PERMITTING, FOR THE FIRST TIME, REAL-TIME ANALYSIS BY GAS CHROMATOGRAPHY. TO TRANSLATE THIS CONCEPT INTO A PRACTICAL INSTRUMENT, WE SHALL HAVE TO REDESIGN EVERY COM ...

    SBIR Phase I 1988 National Science Foundation
  7. ULTRAHIGH PERFORMANCE MOTORS FOR ROBOTIC APPLICATIONS

    SBC: Aspen Systems, Inc.            Topic: N/A

    THE OBJECT OF THIS RESEARCH IS TO DEVELOP PERMANENT MAGNETS MOTORS HAVING SIGNIFICANTLY HIGHER TORQUE CAPABILITY THAN THE STATE-OF-THE-ART THROUGH THE USE OF AIR-GAP WINDING ARMATURES AND ADVANCED COOLING TECHNIQUES. ACCORDING TO PRELIMINARY STUDIES, THE AIR-GAP WINDING MOTOR HAS A PERFORMANCE FACTOR MORE THAN TWICE AS HIGH AS CONVENTIONAL PERMANENT MAGNET MOTORS, TWO TO THREE TIMES AS MUCH TORQUE ...

    SBIR Phase I 1988 National Science Foundation
  8. Trace Metal Ion Sensor Based on High Resolution Surface Plasmon Resonance and Anodic Stripping Voltammetry

    SBC: Nomadics, Inc.            Topic: N/A

    This Small Business Innovation Research (SBIR) Phase I project will demonstrate the use of a highly sensitive technology to measure the amount of trace metal ions presented in water or other liquid samples and the eventual development of portable instrumentation. This novel approach to detection is effective, sensitive, selective, inexpensive, hazard-free, and truly portable. The system uses an i ...

    SBIR Phase I 2002 National Science Foundation
  9. TOWARDS A METHODOLOGY OF PLURAL ANALYSIS: MULTIPLE APPROACHES TO MODELING JUDGEMENT

    SBC: Decision Science Associates            Topic: N/A

    N/A

    SBIR Phase I 1983 National Science Foundation
  10. THESEUS: A NEW PLATFORM FOR HIGH-ALTITUDE ATMOSPHERIC SCIENCE

    SBC: AURORA FLIGHT SCIENCES CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1990 National Science Foundation
US Flag An Official Website of the United States Government