You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ZERO GRAVITY PHASE SEPARATION VIA ULTRASONIC COALESCENCE

    SBC: Taylor S R & Assocs            Topic: N/A

    N/A

    SBIR Phase I 1988 National Aeronautics and Space Administration
  2. Wireless Integrated Sensor Data Processor

    SBC: INVOCON, INC.            Topic: N/A

    N/A

    SBIR Phase I 1995 National Aeronautics and Space Administration
  3. WIRELESS HEADSET

    SBC: Apeiron            Topic: N/A

    N/A

    SBIR Phase I 1988 National Aeronautics and Space Administration
  4. WIDE SPECTRUM HIGH PERFORMANCE SENSOR CALIBRATORS

    SBC: SI Diamond Technology Inc            Topic: N/A

    N/A

    SBIR Phase I 1996 National Aeronautics and Space Administration
  5. Wideband Fast Switched RF Synthesizer

    SBC: SenSyTech, Inc. Imaging Group            Topic: N/A

    The current market for fast switching frequency sythesizers is growing rapidly. Most synthesizers available today will not meet the stringent requirements for switching quickly, providing spectrally pure RF outputs and minimizing physical size and cost. As part of a current SBIR program, S.T. Research has developed a wideband, fast switching synthesizer, based on the use of broadband phase-locke ...

    SBIR Phase I 1997 Department of DefenseArmy
  6. WEATHER EFFECTS ON BACKGROUND SIGNATURES ALGORITHM DEVELOPMENT

    SBC: DCS CORP.            Topic: N/A

    THE INTERACTIONS BETWEEN TARGETS AND THE BACKGROUND IN BOTH THE VISUAL AND THERMAL SPECTRAL BANDS ARE AFFECTED BY SEVERAL WEATHER RELATED VARIABLES. THE DCS TE-EX MODEL WAS ORIGINALLY DEVELOPED AS A FIRST PRINCIPLES MATHEMATICAL MODEL TO PREDICT THE RADIATED TEMPERATURE OF TARGETS IN A FIELD ENVIRONMENT. THE MODEL, BECAUSE IT IS A FIRST PRINCIPLES MODEL, CAN BE USED TO PREDICT RADIATED TEMPERATURE ...

    SBIR Phase I 1988 Department of DefenseArmy
  7. Waveform Agile Signal Processor (WASP)

    SBC: Systems & Processes Engineering Corporation            Topic: N/A

    Systems & Processes Engineering Corporation (SPEC) proposes to develop a Waveform Agile Signal Processor (WASP) to support the next generation of fuzing systems and subsystems. WASP is designed to~provide high performance, waveform agile, adaptive signal processing for a variety of RF and optical fuze sensors. WASP is designed to support pulsed time domain, frequency domain, phase, direct sequen ...

    SBIR Phase I 1997 Department of DefenseArmy
  8. Virtual Environment System For Space Operations

    SBC: LINCOM CORP.            Topic: N/A

    N/A

    SBIR Phase I 1997 National Aeronautics and Space Administration
  9. Vehicle Real-Time Attitude Estimation System

    SBC: SVS R&D SYSTEMS, INC.            Topic: N/A

    A Vehicle Real-time Attitude Estimation System (VRAES) is proposed which will use existing real-time tracking systems and proven software for object detection, outlining, and feature extraction. Using generalized shape parameters obtained during the detection and feature extraction processing, a subset of outline filters from a large bank of prestored object outlines will be selected. These will ...

    SBIR Phase I 1995 Department of DefenseArmy
  10. VEHICLE MONITORING SYSTEM (VMS) DATA ANALYSIS

    SBC: AMERICAN XTAL TECHNOLOGY            Topic: N/A

    THE OBJECTIVE IS TO DEVELOP COMPUTER SOFTWARE WHICH ANALYZES THE OPERATIONAL HISTORY OF ARMY VEHICLES, SUCH AS 5-TON DIESEL TRUCKS, AND BASED ON THIS ANALYSIS RECOMMENDS MAINTENANCE AND OTHER PREVENTIVE ACTION WHICH MINIMIZES EQUIPMENT BREAKDOWN. THE SOFTWARE WOULD OPERATE ON A PRIME COMPUTER, AND IT SHOULD INCLUDE EXTENSIVE GRAPHICS CAPABILITIES WHICH WOULD ASSIST IN PROGNOSTIC ANALYSIS. THE SOFT ...

    SBIR Phase I 1988 Department of DefenseArmy
US Flag An Official Website of the United States Government