You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ACCELERATED CORROSION TESTING CHAMBER FOR WHEELED VEHICLES

    SBC: MATERIALS MODIFICATIONS INC            Topic: N/A

    IN THIS PHASE I EFFORT, THE GOAL IS TO DETERMINE THE FEASIBILITY OF CONDUCTING ACCELERATED CORROSION TESTING OF VEHICLES BY SIMULATING 5-10-15 YEARS OF FIELD LIFE IN A COMPUTER CONTROLLED ENVIRONMENT SIMULATION CHAMBER. THE DIFFERENT REQUIREMENTS OF THE CHAMBER, THE TYPES OF ENVIRONMENTS PRESENT IN THE DIFFERENT GEOGRAPHICAL REGIONS, THE CORRELATION BETWEEN ACCELERATED CHAMBER TESTS AND FIELD COND ...

    SBIR Phase I 1990 Department of DefenseArmy
  2. ACCELERATED CORROSION TESTING CHAMBER FOR WHEELED VEHICLES

    SBC: MATERIALS MODIFICATIONS INC            Topic: N/A

    IN THIS PHASE I EFFORT, THE GOAL IS TO DETERMINE THE FEASIBILITY OF CONDUCTING ACCELERATED CORROSION TESTING OF VEHICLES BY SIMULATING 5-10-15 YEARS OF FIELD LIFE IN A COMPUTER CONTROLLED ENVIRONMENT SIMULATION CHAMBER. THE DIFFERENT REQUIREMENTS OF THE CHAMBER, THE TYPES OF ENVIRONMENTS PRESENT IN THE DIFFERENT GEOGRAPHICAL REGIONS, THE CORRELATION BETWEEN ACCELERATED CHAMBER TESTS AND FIELD COND ...

    SBIR Phase I 1991 Department of DefenseArmy
  3. A COMMUNICATION AND CONTROL SYSTEM FOR THE MENTALLY RETARDED

    SBC: Scott Instruments Corp            Topic: N/A

    THE TOPIC OF THIS PROPOSAL IS THE DESIGN OF AN ENVIRONMENTALCONTROL SYSTEM FOR THE MORE THAN TWO MILLION INDIVIDUALS IN THE UNITED STATES WHOSE PHYSICAL AND/OR MENTAL IMPAIRMENTS ARE SO SEVERE THAT THEY ARE UNABLE TO FUNCTION IN THEIR ENVIRONMENT IN A NORMAL AND EFFECTIVE MANNER. A TWO-YEAR COLLABORATIVE RESEARCH EFFORT BETWEEN THE BIOENGINEERING PROGRAM AT THE NATIONAL HEADQUARTERS OF THE ASSOCIA ...

    SBIR Phase I 1987 Department of Health and Human Services
  4. A COMPUTERIZED DISTORTION-PRODUCT HEARING SCREENER

    SBC: Collaboration In Sci-tech Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Health and Human Services
  5. Acoustic Sensor Simulation and Environment Technology

    SBC: TECHNICAL SOLUTIONS, INC.            Topic: N/A

    A quality simulation which allows a user to simulate the acoustic emissions in a multi-source environment and then study the effects these conditions have on a set of acoustic sensors would be of great value. As acoustic sensors technology continues to advance with robust algorithms for detection, tracking and identification as well as high performance hardware providing real-time operation, thes ...

    SBIR Phase I 1996 Department of DefenseArmy
  6. ACROSOME REACTION: DOT ASSAY TO DETECT MALE INFERTILITY

    SBC: Rhomed, Inc.            Topic: N/A

    A DOT IMMUNOASSAY FOR THE DETECTION OF ACROSOME REACTION OF HUMAN SPERM WILL BE DEVELOPED FOR USE IN THE DETECTION OF MALE INFERTILITY. SCREENING TESTS FOR THE DETERMINATION OF THE CAUSES OF INFERTILITY AND SCREENING SEMEN SAMPLES FOR SPERM BANKING HAVE BECOME MAJOR RESPONSIBILITIES OF FERTILITY CLINICS. HOWEVER, NO SIMPLE METHOD CURRENTLY EXISTS FOR THE DETERMINATION OF THE FUNCTIONAL ABILITY OF ...

    SBIR Phase I 1990 Department of Health and Human Services
  7. ACTIVE CONTOURS FOR APPLICATIONS IN IMAGING CYTOMETRY

    SBC: Perceptive Sciences            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Health and Human Services
  8. ADAPTIVE TACTICAL POWER DISTRIBUTION SYSTEM

    SBC: Lica Systems, Inc.            Topic: N/A

    GENERATOR USED PRIMARY POWER SYSTEMS ARE THE ACHILLES HEEL OF TACTICAL COMMAND AND CONTROL SYSTEMS, FIELD HOSPITALS, AND OTHER TACTICAL SUPPORT FACILITIES. THEY ARE NOISY AND PRONE TO FAILURE AT THE MOST CRITICAL TIMES. TACTICAL POWER USING SYSTEMS HAVE DIFFERENT POWER DUTY CYCLES AND POWER FACTORS. SOME ARE PREDICTABLE; OTHER TOTALLY RANDOM; AND MANY MUST BE DEPENDED UPON IN THE "HEAT OF THE BATT ...

    SBIR Phase I 1987 Department of DefenseArmy
  9. ADENOSINE ANTAGONIST FOR CARDIOPULMONARY RESUSCITATION

    SBC: Discovery Therapeutics, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Health and Human Services
  10. A DIODE LASER HUMIDITY SENSOR FOR COLD ENVIRONMENTS

    SBC: SOUTHWEST SCIENCES INC            Topic: N/A

    MEASUREMENTS OF ATMOSPHERIC HUMIDITY IN COLD REGIONS OR WINTER FIELD ENVIRONMENTS ARE DIFFICULT USING EXISTING METEOROLOGICAL INSTRUMENTATION. IN GENERAL, PRESENT FIELD INSTRUMENTS FOR UNTENDED HUMIDITY MEASUREMENTS ARE PLAGUED BY LOW SENSITIVITY AND DRIFTS IN CALIBRATION, RESULTING IN POOR ACCURACY AND LOW RELIABILITY. WE PROPOSE A NEW INSTRUMENTATION CONCEPT FOR FIELD MEASUREMENT OF HUMIDITY, BA ...

    SBIR Phase I 1987 Department of DefenseArmy
US Flag An Official Website of the United States Government