You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Wideband Fast Switched RF Synthesizer

    SBC: SenSyTech, Inc. Imaging Group            Topic: N/A

    The current market for fast switching frequency sythesizers is growing rapidly. Most synthesizers available today will not meet the stringent requirements for switching quickly, providing spectrally pure RF outputs and minimizing physical size and cost. As part of a current SBIR program, S.T. Research has developed a wideband, fast switching synthesizer, based on the use of broadband phase-locke ...

    SBIR Phase I 1997 Department of DefenseArmy
  2. WEATHER EFFECTS ON BACKGROUND SIGNATURES ALGORITHM DEVELOPMENT

    SBC: DCS CORP.            Topic: N/A

    THE INTERACTIONS BETWEEN TARGETS AND THE BACKGROUND IN BOTH THE VISUAL AND THERMAL SPECTRAL BANDS ARE AFFECTED BY SEVERAL WEATHER RELATED VARIABLES. THE DCS TE-EX MODEL WAS ORIGINALLY DEVELOPED AS A FIRST PRINCIPLES MATHEMATICAL MODEL TO PREDICT THE RADIATED TEMPERATURE OF TARGETS IN A FIELD ENVIRONMENT. THE MODEL, BECAUSE IT IS A FIRST PRINCIPLES MODEL, CAN BE USED TO PREDICT RADIATED TEMPERATURE ...

    SBIR Phase I 1988 Department of DefenseArmy
  3. Waveform Agile Signal Processor (WASP)

    SBC: Systems & Processes Engineering Corporation            Topic: N/A

    Systems & Processes Engineering Corporation (SPEC) proposes to develop a Waveform Agile Signal Processor (WASP) to support the next generation of fuzing systems and subsystems. WASP is designed to~provide high performance, waveform agile, adaptive signal processing for a variety of RF and optical fuze sensors. WASP is designed to support pulsed time domain, frequency domain, phase, direct sequen ...

    SBIR Phase I 1997 Department of DefenseArmy
  4. Water Quality Monitoring Device

    SBC: Gky And Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Transportation
  5. VERIFICATION OF STEEL PLACEMENT IN PORTLAND CEMENT CONCRETE USING SHORT-PULSE RADAR TECHNIQUES

    SBC: Bomar Associates Inc.            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of Transportation
  6. VEHICLE MONITORING SYSTEM (VMS) DATA ANALYSIS

    SBC: AMERICAN XTAL TECHNOLOGY            Topic: N/A

    THE OBJECTIVE IS TO DEVELOP COMPUTER SOFTWARE WHICH ANALYZES THE OPERATIONAL HISTORY OF ARMY VEHICLES, SUCH AS 5-TON DIESEL TRUCKS, AND BASED ON THIS ANALYSIS RECOMMENDS MAINTENANCE AND OTHER PREVENTIVE ACTION WHICH MINIMIZES EQUIPMENT BREAKDOWN. THE SOFTWARE WOULD OPERATE ON A PRIME COMPUTER, AND IT SHOULD INCLUDE EXTENSIVE GRAPHICS CAPABILITIES WHICH WOULD ASSIST IN PROGNOSTIC ANALYSIS. THE SOFT ...

    SBIR Phase I 1988 Department of DefenseArmy
  7. VALIDATION & TESTING OF THE VAM2D COMPUTER CODE

    SBC: Hydrogeologic Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  8. URBAN WARFARE DIGITAL DATABASE

    SBC: Mrj Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  9. UPSCALED SELF-PROPAGATING HIGH TEMPERATURE SYNTHESIS (SHS)/DYNAMIC COMPACTION PROCESSING

    SBC: W Peter Trower Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  10. UPDATING CURRENT ELECTRO-MAGNETIC INTERFERENCE/ELECTROMAGNETIC COMPATIBILITY (EMI/EMC) TEST METHODS AND EQUIPMENT

    SBC: SEMTAS CORP.            Topic: N/A

    MIL-E-6051, MIL-STD-461 AND MIL-STD-462 ARE ADDRESSED FOR UPDATING CURRENT EMI/EMC TEST METHODS AND EQUIPMENT. THE PROBLEMS WITH THE USE OF EACH OF THE SPECIFICATIONS FOR THE CURRENT STATE-OF-THETECHNOLOGY ARE IDENTIFIED AND SOLUTIONS TO THE PROBLEMS ARE PROPOSED. MIL-E-6051 SOLUTIONS ARE TO DEVELOP METHODOLOGIES AND ANALYSES THAT REDUCE SYSTEM LEVEL TESTS AND DEVELOP METHODOLOGIES THAT DEFINE THE ...

    SBIR Phase I 1989 Department of DefenseArmy
US Flag An Official Website of the United States Government