You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A BOREHOLE TUBEWAVE DAMPER PROBE FOR HIGH RESOLUTION SEISMICAPPLICATIONS

    SBC: High Resolution Seismics Inc            Topic: N/A

    HIGH RESOLUTION BOREHOLE-TO-BOREHOLE SEISMIC TOMOGRAPHY CAN PROVIDE MUCH OF THE INFORMATION NEEDED TO IDENTIFY SUBTLE OIL RESERVOIR HETEROGENEITIES. TO DATE, MUCH OF THE HIGH RESOLUTION CROSS-WELL RESEARCH HAS INVOLVED THE USE OF FLUID-COUPLED PIEZOELECTRIC SEISMIC SOURCES. HOWEVER, IN PRACTICAL COMMERCIAL APPLICATIONS OF FLUID-COUPLED SOURCES, SOME CONSIDERATION MUST BE GIVEN TO DEPLOYING THE SOU ...

    SBIR Phase I 1991 Department of Energy
  2. A BOREHOLE WALL-LOCKED PIEZOELECTRIC SOURCE FOR HIGH RESOLUTION SEISMIC APPLICATIONS

    SBC: High Resolution Seismics Inc            Topic: N/A

    HIGH RESOLUTION BOREHOLE-TO-BOREHOLE SEISMIC TOMOGRAPHY CAN PROVIDE MUCH OF THE INFORMATION NEEDED TO IDENTIFY SUBTLE RESERVOIR HETEROGENEITIES THUS ALLOWING STRATEGIES PLACEMENTOF PRODUCTION WELLS. HIGH RESOLUTION SEISMIC TECHNIQUES ARE IDEALLY SUITED TO HARD ROCK APPLICATIONS WHERE FORMATIONVELOCITIES EXCEED 10,000 FEET PER SECOND. HOWEVER, TO DATE,THE ACQUISITION OF HIGH FREQUENCY TOMOGRAPHIC D ...

    SBIR Phase I 1991 Department of Energy
  3. Accelerating Cavities for a Relativistic Klystron Two-Beam Accelerator

    SBC: Fm Technologies Inc            Topic: N/A

    41299 November 19, 1996 FM Technologies, Inc. In the Relativistic Klystron Two-Beam Accelerator, which is currently under development, power from a low-energy, high-current, bunched beam is converted to micro-waves via the klystron mechanism and used to provide power for a high-energy linac, specifically a future Next Linear Collider upgrade to l.0 TeV. ...

    SBIR Phase II 1997 Department of Energy
  4. Accelerating Cavities for a Relativistic Klystron Two-Beam Accelerator

    SBC: Fm Technologies Inc            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  5. ADVANCED PULSED POWER CIRCUITS FOR ION LINEAR INDUCTION ACCELERATORS

    SBC: North Star Research Corp.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of Energy
  6. Advanced Water Sensor for Unmanned Aerial Vehicles

    SBC: SOUTHWEST SCIENCES INC            Topic: N/A

    40444 November 18, 1996 Southwest Sciences, Inc. Increasing energy consumption and environmental degradation may contribute to deleterious changes in the radiative balance and chemical composition of the atmosphere. The quantitative measurement of water vapor in the troposphere and lower stratosphere is crucial for the study of meteorological and climati ...

    SBIR Phase II 1997 Department of Energy
  7. Advanced Water Sensor for Unmanned Aerial Vehicles

    SBC: SOUTHWEST SCIENCES INC            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  8. A FEASIBILITY STUDY FOR A 5-MW, 300-GHZ QUASI-OPTICAL GYROTRON

    SBC: PHYRE TECHNOLOGIES, INC.            Topic: N/A

    HIGH POWER, CW (CONTINUOUS WAVE) SOURCES AT FREQUENCIES NEAR 300 GHZ ARE NEEDED FOR ELECTRON CYCLOTRON HEATING IN ADVANCED MAGNETIC FUSION DEVICES SUCH AS THE CIT (COMPACT IGNITION TOKAMAK). RECENT DEVELOPMENTS IN GYROTRONS HAVE PUSHED THE STATE OF THE ART TO 100 KW CW AT 140 GHZ. ONE MEGAWATT AT 140 GHZ APPEARS FEASIBLE, BUT NEARTO THE LIMIT OF THE CURRENT FORM OF THE GYROTRON. THE QUASI-OPTICAL ...

    SBIR Phase II 1988 Department of Energy
  9. A FEASIBILITY STUDY FOR A 5-MW, 300-GHZ QUASI-OPTICAL GYROTRON

    SBC: PHYRE TECHNOLOGIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of Energy
  10. A FEASIBILITY STUDY FOR A SEISMIC EARLY WARNING SYSTEM FOR NUCLEAR POWER PLANT SHUTDOWN

    SBC: ENSCO Inc            Topic: N/A

    A FEASIBILITY STUDY WILL BE CONDUCTED OF A SEISMIC SCRAM-PROCESSING SYSTEM IN WHICH P WAVES FROM LARGE EARTHQUAKES ARE DETECTED AND ANALYZED IN TIME TO INITIATE A NUCLEAR POWER PLANT CORE SHUTDOWN BEFORE THE ARRIVAL OF LARGE, DAMAGING SHEAR WAVE PHASES. A PROTOTYPE SEISMIC SCRAM-MONITORING SYSTEM WILL BE DESIGNED AND IMPLEMENTED ON A SUN 3/160 ENGINEERING WORKSTATION. IN THE PROPOSED SYSTEM, SEISM ...

    SBIR Phase I 1987 Department of Energy
US Flag An Official Website of the United States Government