You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY22 is not expected to be complete until September, 2023.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. A BOREHOLE TUBEWAVE DAMPER PROBE FOR HIGH RESOLUTION SEISMICAPPLICATIONS

    SBC: High Resolution Seismics Inc            Topic: N/A

    HIGH RESOLUTION BOREHOLE-TO-BOREHOLE SEISMIC TOMOGRAPHY CAN PROVIDE MUCH OF THE INFORMATION NEEDED TO IDENTIFY SUBTLE OIL RESERVOIR HETEROGENEITIES. TO DATE, MUCH OF THE HIGH RESOLUTION CROSS-WELL RESEARCH HAS INVOLVED THE USE OF FLUID-COUPLED PIEZOELECTRIC SEISMIC SOURCES. HOWEVER, IN PRACTICAL COMMERCIAL APPLICATIONS OF FLUID-COUPLED SOURCES, SOME CONSIDERATION MUST BE GIVEN TO DEPLOYING THE SOU ...

    SBIR Phase I 1991 Department of Energy
  2. A BOREHOLE WALL-LOCKED PIEZOELECTRIC SOURCE FOR HIGH RESOLUTION SEISMIC APPLICATIONS

    SBC: High Resolution Seismics Inc            Topic: N/A

    HIGH RESOLUTION BOREHOLE-TO-BOREHOLE SEISMIC TOMOGRAPHY CAN PROVIDE MUCH OF THE INFORMATION NEEDED TO IDENTIFY SUBTLE RESERVOIR HETEROGENEITIES THUS ALLOWING STRATEGIES PLACEMENTOF PRODUCTION WELLS. HIGH RESOLUTION SEISMIC TECHNIQUES ARE IDEALLY SUITED TO HARD ROCK APPLICATIONS WHERE FORMATIONVELOCITIES EXCEED 10,000 FEET PER SECOND. HOWEVER, TO DATE,THE ACQUISITION OF HIGH FREQUENCY TOMOGRAPHIC D ...

    SBIR Phase I 1991 Department of Energy
  3. Accelerating Cavities for a Relativistic Klystron Two-Beam Accelerator

    SBC: Fm Technologies Inc            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  4. ADVANCED PULSED POWER CIRCUITS FOR ION LINEAR INDUCTION ACCELERATORS

    SBC: North Star Research Corp.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of Energy
  5. Advanced Water Sensor for Unmanned Aerial Vehicles

    SBC: SOUTHWEST SCIENCES INC            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  6. A FEASIBILITY STUDY FOR A 5-MW, 300-GHZ QUASI-OPTICAL GYROTRON

    SBC: PHYRE TECHNOLOGIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of Energy
  7. A FEASIBILITY STUDY FOR A SEISMIC EARLY WARNING SYSTEM FOR NUCLEAR POWER PLANT SHUTDOWN

    SBC: ENSCO Inc            Topic: N/A

    A FEASIBILITY STUDY WILL BE CONDUCTED OF A SEISMIC SCRAM-PROCESSING SYSTEM IN WHICH P WAVES FROM LARGE EARTHQUAKES ARE DETECTED AND ANALYZED IN TIME TO INITIATE A NUCLEAR POWER PLANT CORE SHUTDOWN BEFORE THE ARRIVAL OF LARGE, DAMAGING SHEAR WAVE PHASES. A PROTOTYPE SEISMIC SCRAM-MONITORING SYSTEM WILL BE DESIGNED AND IMPLEMENTED ON A SUN 3/160 ENGINEERING WORKSTATION. IN THE PROPOSED SYSTEM, SEISM ...

    SBIR Phase I 1987 Department of Energy
  8. A FIBER OPTIC PRESSURE SENSOR FOR USE IN WELLBORES

    SBC: Optech            Topic: N/A

    PRESSURE MEASUREMENTS DEEP IN GEOTHERMAL WELLBORES PROVIDE SOME OF THE MOST VALUABLE DATA FOR MEASURING THE PRODUCTIVITY OF GEOTHERMAL WELLS AND FOR ASSESSING RESERVOIRCHARACTERISTICS. WELLBORES HAVE VERY HIGH PRESSURE AND VERY LOW PH, BUT, MOST SIGNIFICANTLY, THEY HAVE VERY HIGH TEMPERATURES (UP TO 350 DEGREES CENTIGRADE) THAT PRECLUDE PRESENT PRESSURE MEASURING INSTRUMENTATION FROM OPERATING ADE ...

    SBIR Phase I 1988 Department of Energy
  9. A FIBER OPTIC SENSOR FOR MOISTURE IN PROCESS STREAMS

    SBC: Sumx Research Inc            Topic: N/A

    THE AIM OF THIS PROJECT IS TO DETERMINE THE FEASIBILITY OF AN INSTRUMENT FOR IN-SITU MONITORING OF WATER IN LIQUID NONAQUEOUS SYSTEMS. THE METHOD WILL USE ADVANCED SURFACE MODIFICATION TECHNIQUES, FIBER OPTIC PROBES AND MICROCOMPUTING TOOLS. THE METHOD WILL ADD CHEMICAL SPECIFICITY TO A PHYSICAL MEASUREMENT WHILE STILL PROVIDING FOR CONTINUOUS MONITORING AND CONTROL. FIBER OPTIC METHODS OFFER AN E ...

    SBIR Phase I 1988 Department of Energy
  10. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government