You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY21 is not expected to be complete until September, 2022.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. ADVANCED FARE PAYMENT MEDIA

    SBC: Glh Inc            Topic: N/A

    THE SBIR PROGRAM SOLICITATION PROVIDES AN OPPORTUNITY TO DESIGN AND DEVELOP A FARE PAYMENT SYSTEM BASED ON ADVANCED FARE PAYMENT MEDIA TO MEET THE NEEDS OF TRANSIT PATRONS AND SYSTEMS IN THE 1990S. THE SOLICITATION STATED THE NEW MEDIASHOULD: BE COST EFFECTIVE, PERMIT PAYMENT OF ZONAL FARES, INCREASE FLEXIBILITY IN PAYMENT SCHEDULES AND METHODS, AND IMPROVE REVENUE SECURITY AND PROCESSING CAPABILI ...

    SBIR Phase I 1991 Department of Transportation
  2. ADVANCED VACUUM INSULATION FOR REFRIGERATED SHIPPING CONTAINERS

    SBC: RE/SPEC INC            Topic: N/A

    A RESEARCH PROGRAM IS PROPOSED TO DETERMINE THE FEASIBILITY OF USING ADVANCED VACUUM INSULATIONS TO IMPROVE THE PRODUCTIVITY OF REFRIGERATED SHIPPING CONTAINERS WHILE AVOIDING THE ENVIRONMENTAL RISKS ASSOCIATED WITH CHLOROFLUOROCARBONS (CFC'S) IN FOAM INSULATION CURRENTLY BEING USED. ADVANCED VACUUM INSULATIONS, CURRENTLY UNDER RESEARCH AND DEVELOPMENT, DO NOT CONTAIN CFC'S AND HAVE VERYHIGH THERM ...

    SBIR Phase I 1990 Department of Transportation
  3. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  4. AIRBORNE DATA LINK COCKPIT MANAGEMENT AND DISPLAY

    SBC: CARLOW INTERNATIONAL, INC.            Topic: N/A

    RESEARCH WILL BE CARRIED OUT ON INFORMATION REQUIREMENTS ANDFLIGHT CREW PERFORMANCE IN RELATION TO FUTURE DATA LINK COMMUNICATIONS (DLC) SYSTEMS. IT IS EXPECTED THAT AVAILABILITY OF CRITICAL INFORMATION IN THE COCKPIT FROM DLC SYSTEMS WILL FACILITATE IMPROVED TRANSPORTATION EFFICIENCY AND SAFETY. HOWEVER, THERE MAY BE SOME PRICE IN TERMS OF CREW WORKLOAD. TASK ANALYSIS AND HUMAN FACTORS INFORMATIO ...

    SBIR Phase I 1991 Department of Transportation
  5. A Proposal to Develop the UTD Breakaway Link for Use in Utility Pole Guy Wires

    SBC: UTD, INC.            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  6. BLADDERS FOR SPILL CONTAINMENT

    SBC: Pasadyn Inc            Topic: N/A

    BLADDER TYPE DEVICES ARE USED TO MITIGATE FLUID LOSSES FROM RUPTURED STORAGE DEVICES.

    SBIR Phase I 1991 Department of Transportation
  7. Broken Rail Detection

    SBC: Texas Research Institute, Austin, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  8. DYNAMIC GPS ATTITUDE DETERMINING SYSTEM FOR MARINE APPLICATIONS

    SBC: Adroit Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of Transportation
  9. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  10. ELECTRONIC BOMB FUZE DETECTION

    SBC: Household Data Services            Topic: N/A

    SEVERAL METHODS OF RAPIDLY SCREENING AIRLINE PASSENGERS AND BAGGAGE FOR EXPLOSIVE DEVICES ARE PROPOSED. TWO OF THESE METHODS USE NONLINEAR DEVICE DETECTION (NLDD) TO DETERMINE THE PRESENCE OF ACTIVE OR PASSIVE SEMICONDUCTOR DEVICES WHICH MAY BE PART OF AN ELECTRONIC BOMB FUZE. ANOTHER TWO DETECT THE PRESENCE OF RUNNING OSCILLATORS WHICH ARE LIKELY SUBSYSTEMS OF A FUZING DEVICE.

    SBIR Phase I 1987 Department of Transportation
US Flag An Official Website of the United States Government