You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Ultrafast Polysilylene Scintillators
SBC: Adherent Technologies, Inc. Topic: N/AN/A
SBIR Phase I 1996 Department of Energy -
ETHANOL-WATER FRACTIONATION BY A NON-BOILING HEAT AND MASS TRANSFER PROCESS
SBC: Albers Research & Dev. Assocs Topic: N/AFEASIBILITY AND FUNDAMENTAL OPERATION OF AN INNOVATIVE NONBOILING MINIMUM ENERGY HEAT AND MASS TRANSFER DEVICE WILLBE INVESTIGATED. AN ETHANOL/WATER BINARY SYSTEM WAS SELECTED BECAUSE OF ITS COMMERCIAL IMPORTANCE. THE HEAT ANDMASS TRANSFER DEVICE USES AN INERT CARRIER GAS OPERATING AT ATMOSPHERIC PRESSURE TO EVAPORATE ETHANOL AND WATER AND THEN TO CONDENSE WATER AND ETHANOL IN A MANNER SO AS TO RE ...
SBIR Phase I 1987 Department of Energy -
LASER-BASED ULTRASONIC EXCITATION AND SPECKLE INTERFEROMETRIC DETECTION SYSTEMS FOR NONDESTRUCTIVE EVALUATION OF HIGH-TEMPERATURE CERAMICS
SBC: American Research Corporation of Virginia Topic: N/ATHE USE OF ADVANCED MATERIALS SUCH AS CERAMICS, CERAMIC COMPOSITES, AND HIGH TEMPERATURE COATINGS HAS LED TO IMPROVED PERFORMANCE OF CRITICAL HEAT ENGINE AND ENERGY-RELATED COMPONENTS AND SYSTEMS. HOWEVER, THE REQUIREMENTS FOR NONDESTRUCTIVE EVALUATION (NDE) OF CERAMIC MATERIALS RESULTING FROM COMPLEX GEOMETRY, INHOMOGENEITY, REDUCED FLAW SIZE, AND ADVERSE PROCESSING ENVIRONMENTS HAVE PRODUCED LON ...
SBIR Phase I 1987 Department of Energy -
Template-Medicated Synthesis of Periodic Membranes for Improved Liquid-Phase Separations
SBC: American Research Corporation of Virginia Topic: N/AN/A
SBIR Phase I 1996 Department of Energy -
High Power Target Design for a Next Generation Radioactive Beam ISOL-Type Facility
SBC: Amparo Corp.on Topic: N/AN/A
SBIR Phase I 1996 Department of Energy -
A NOVEL, INSULATED, DOUBLE-WALLED TUBE DESIGN FOR THERMALLY-ENHANCED OIL RECOVERY
SBC: Carbotek Inc Topic: N/AN/A
SBIR Phase I 1987 Department of Energy -
A Low Cost Acoustic Property Sensor for Measuring Natural Gas Composition in Liquid Natural Gas (LNG) Powered Vehicles
SBC: Commercial Electronics, Inc. Topic: N/A86 A Low Cost Acoustic Property Sensor for Measuring Natural Gas Composition in Liquid Natural Gas (LNG) Powered Vehicles--Commercial Electronics, Inc., 801 North 15th Street, Broken Arrow, OK 74012-2838; (918) 251-0925 Mr. Scott Phillips, Principal Investigator Mr. Michael A. Phillips, Business Official DOE Grant No. DE-FG03-97ER82353 Amount: $75,000 Among the various alternative fuels propos ...
SBIR Phase I 1997 Department of Energy -
LNG Storage and Delivery System Analysis
SBC: Directed Technologies, Inc. Topic: N/A87 LNG Storage and Delivery System Analysis--Directed Technologies, Inc., 4001 North Fairfax Drive, Suite 775, Arlington, VA 22203-1614; (703) 243-3383 Mr. Brian D. James, Principal Investigator Mr. Ira F. Kuhn, Jr., Business Official DOE Grant No. DE-FG02-97ER82357 Amount: $75,000 To reduce foreign fuel dependence and improve the Nation¿s air quality, new high-efficiency, direct-injection d ...
SBIR Phase I 1997 Department of Energy -
A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.
SBC: Eda Consultants Topic: N/ATHE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...
SBIR Phase I 1987 Nuclear Regulatory Commission -
A FEASIBILITY STUDY FOR A SEISMIC EARLY WARNING SYSTEM FOR NUCLEAR POWER PLANT SHUTDOWN
SBC: ENSCO Inc Topic: N/AA FEASIBILITY STUDY WILL BE CONDUCTED OF A SEISMIC SCRAM-PROCESSING SYSTEM IN WHICH P WAVES FROM LARGE EARTHQUAKES ARE DETECTED AND ANALYZED IN TIME TO INITIATE A NUCLEAR POWER PLANT CORE SHUTDOWN BEFORE THE ARRIVAL OF LARGE, DAMAGING SHEAR WAVE PHASES. A PROTOTYPE SEISMIC SCRAM-MONITORING SYSTEM WILL BE DESIGNED AND IMPLEMENTED ON A SUN 3/160 ENGINEERING WORKSTATION. IN THE PROPOSED SYSTEM, SEISM ...
SBIR Phase I 1987 Department of Energy