You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Abductive Power System Control and Diagnostics
SBC: ABTECH CORPORATION Topic: N/AN/A
SBIR Phase I 1994 National Aeronautics and Space Administration -
A COATED TIB2 WHISKER TOUGHENED SIC MATRIX COMPOSITE FOR AEROSPACE PROPULSION
SBC: ATS-MER, LLC Topic: N/ASILICON CARBIDE IS A VERY DESIRABLE STRUCTURAL CERAMIC BUT STATE-OF-THE-ART MONOLITHS ARE LACKING IN TOUGHNESS AND RELIABILITY. WHISKER TOUGHENING HAS NOT BEEN EFFECTIVE DUE TO THE DISAPPEARANCE OF THE SICW IN THE VERY HIGH TEMPERATURE CONSOLIDATION PROCESS. TIB2 PARTICLES HAVE BEENDEMONSTRATED STABLE IN THE SIC CONSOLIDATION PROCESS, BUT DO NOT HAVE A MAJOR IMPACT ON INCREASING TOUGHNESS AND LACK ...
SBIR Phase I 1990 National Aeronautics and Space Administration -
ACTIVE DETECTION AND TRACKING SENSOR FOR PASSIVE TARGETS
SBC: Computer Algorithm Development Topic: N/ACAD PROPOSES TO DO MODEL BASED COMPUTER VISION RESEARCH CULMINATING IN FASTER AND MORE CAPABLE PROGRAMS. CAD WILL DEMONSTRATE A SUPERIOR ACTIVE DETECTION AND TRACTING SENSOR (ADTS) BY COMBINING ITS ARTIFICIAL INTELLIGENCE (AI) SOFTWARE WITH A MICROCOMPUTER, VIDEO CAMERA, AND IMAGE DIGITIZING ELECTRONICS. THE ADTS WILL HAVE SUPERIOR CAPABILITY BECAUSE OF A NOVEL OBJECT RECOGNITION ALGORITHM BEING D ...
SBIR Phase I 1990 National Aeronautics and Space Administration -
Active Rain-Radar Calibrator for Tropical Rainfall Measuring Mission
SBC: CENTER FOR REMOTE SENSING, INC. Topic: N/AWe propose to design a state-of-the-art active radar calibrator which will be used for absolute calibration of the TRMM Rain Radar. During Phase I, we investigate several architectures and perform design evaluations with the ultimate objective of designing an improved radar calibrator with unprecedented accuracy and stability, yet optimized for cost and complexity. The active calibrator will be op ...
SBIR Phase I 1994 National Aeronautics and Space Administration -
ACTIVE STABILITY CONTROL OF TURBINE ENGINE COMBUSTER AND COMPRESSOR
SBC: Scientific Monitoring, Inc. Topic: N/AN/A
SBIR Phase I 1996 National Aeronautics and Space Administration -
Active Suppression of Resonance Interactions between Shear-Layers and Cavities
SBC: High Technology Corporation Topic: N/AN/A
SBIR Phase I 1994 National Aeronautics and Space Administration -
ACTIVE VIBRATION STABILIZATION BY SMART LEAD-FREE PIEZO CERAMIC/POLYMER HYBRID MATERIALS
SBC: ATS-MER, LLC Topic: N/AN/A
SBIR Phase I 1996 National Aeronautics and Space Administration -
A DISTRIBUTED OBJECT TYPE MANAGEMENT SYSTEM FOR HETEROGENEOUS ENVIRONMENTS
SBC: REI SYSTEMS, INC. Topic: N/AN/A
SBIR Phase I 1990 National Aeronautics and Space Administration -
Advanced High-Lift Systems To Enhance Performance And Utility Of Existing And New Ga Aircraft
SBC: Innovative Aerodynamic Topic: N/AN/A
SBIR Phase I 1997 National Aeronautics and Space Administration -
ADVANCED MOLYBDATE CONVERSION COATINGS FOR ALUMINUM AND ITS ALLOYS
SBC: LYNNTECH INC. Topic: N/AN/A
SBIR Phase I 1996 National Aeronautics and Space Administration